Professional Documents
Culture Documents
ASCE Sesmic Loading
ASCE Sesmic Loading
ﻣﺜﺎل:
𝟑𝟔 𝑆 = 𝟎.
𝐴 = 0.35 ⎫ 𝐴𝑆𝐶𝐸7: 𝐹 = 1.7 → 𝑆𝑀 = 1.7 × 0.63 = 1.071 → 𝑆𝐷 = 2 × 1.071 = 0.714 → 𝐶 = 0.714 = 0.143
⎪ 3
ﺧﺎك ﻧﻮع 𝐼𝐼𝐼 ×1
⎬ 𝑐𝑒𝑠𝑇 = 1 𝐴𝐵𝐼 0.35 × 2.047 × 1
→ اﺳﺘﺎﻧﺪارد 𝑅 = 5 ⎪ 2800 𝐵 = 2.047 → = 𝐶
𝑅
=
5
= 0.143
𝐼=1 ⎭
• ﺑﻨﺎﺑﺮاﻳﻦ "ﺑﺎ در ﻧﻈﺮ ﮔﺮﻓﺘﻦ اﻳﻨﻜﻪ T=1secﻣﻌﻴﺎر ﺑﺎﺷﺪ" ،ﺑﺮاي " "A=0.35و "ﺧﺎك ﻧﻮع "IIIﻣﻘﺪار S1ﻣﻌﺎدل ﺑﺮاﺑﺮ 0.63ﻣﻲ ﺑﺎﺷﺪ.
𝟖𝟒 𝑆 = 𝟎.
𝐴 = 0.35 ⎫ 𝐴𝑆𝐶𝐸7: 𝐹 = 1.5 → 𝑆𝑀 = 1.5 × 0.48 = 0.72 → 𝑆𝐷 = 2 × 0.72 = 0.48 → 𝐶 = 0.48 = 0.096
⎪ 3
ﺧﺎك ﻧﻮع 𝐼𝐼 ×1
⎬ 𝑐𝑒𝑠𝑇 = 1 𝐴𝐵𝐼 0.35 × 1.375 × 1
→ اﺳﺘﺎﻧﺪارد 𝑅 = 5 ⎪ 2800 𝐵 = 1.375 → = 𝐶
𝑅
=
5
= 0.096
⎭ 𝐼=1
• ﺑﻨﺎﺑﺮاﻳﻦ "ﺑﺎ در ﻧﻈﺮ ﮔﺮﻓﺘﻦ اﻳﻨﻜﻪ T=1secﻣﻌﻴﺎر ﺑﺎﺷﺪ" ،ﺑﺮاي " "A=0.35و "ﺧﺎك ﻧﻮع "IIﻣﻘﺪار S1ﻣﻌﺎدل ﺑﺮاﺑﺮ 0.48ﻣﻲ ﺑﺎﺷﺪ.
𝟔𝟏𝟓 𝑆 = 𝟎.
𝐴 = 0.3 ⎫ 𝐴𝑆𝐶𝐸7: 𝐹 = 1.784 → 𝑆𝑀 = 1.784 × 0.516 = 0.92 → 𝑆𝐷 = 2 × 0.92 = 0.6137 → 𝐶 = 0.6137 = 0.12
⎪ 3
ﺧﺎك ﻧﻮع 𝐼𝐼𝐼 ×1
⎬ 𝑐𝑒𝑠𝑇 = 1 𝐴𝐵𝐼 0.3 × 2.0475 × 1
→ اﺳﺘﺎﻧﺪارد 𝑅 = 5 ⎪ 2800 𝐵 = 2.0475 → = 𝐶
𝑅
=
5
= 0.123
⎭ 𝐼=1
• ﺑﻨﺎﺑﺮاﻳﻦ "ﺑﺎ در ﻧﻈﺮ ﮔﺮﻓﺘﻦ اﻳﻨﻜﻪ T=1secﻣﻌﻴﺎر ﺑﺎﺷﺪ" ،ﺑﺮاي " "A=0.3و "ﺧﺎك ﻧﻮع "IIIﻣﻘﺪار S1ﻣﻌﺎدل ﺑﺮاﺑﺮ 0.516ﻣﻲ ﺑﺎﺷﺪ.
www.hoseinzadeh.net اﻧﺘﺸﺎر ﻣﻄﺎﻟﺐ "ﺑﺎ ذﻛﺮ ﻣﻨﺒﻊ" ﺑﻼﻣﺎﻧﻊ اﺳﺖ www.t.me/hoseinzadehasl Instagram 124