Checklist - Rebar Work
Checklist - Rebar Work
Checklist - Rebar Work
Project:
Job No.:
During
17 Tightening method is followed for couplers
18 Concrete covers are used at maximum spacing of 1000 mm in all
direction
19 Concrete spacers, covers etc. used are well cured & of same grade
Checked by Description Re-inspection
Activity of defects / X
STAGE SN. DESCRIPTION OF ITEMS TO BE CHECKED Incharge / X
/ X
20 Inserts if any, are inserted at the desired locations as per the drawing
21 All the electrical conduits are not provided in the cover zone
22 Excessive cranking / joggling of bars is not done (1:6 ratio is
suggested for unavoidable situations)
23 Provision of Dowels for next pour is provided as per the approved
schedule of steel
24 Visit and clearance from structural consultant is required for
important pours
25 Protruding bars (temporary support) if any used for support should
Post be cut inside cover zone
26 Concrete droppings fallen on bars should be removed and cleaned