Professional Documents
Culture Documents
Method of Statement For Power Panel
Method of Statement For Power Panel
Page 1 of 4
Contents
Purpose................................................................................................................................................3
Location Of Activity .............................................................................................................................3
Scope Of Work.....................................................................................................................................3
Material Used......................................................................................................................................3
Equipment and Tools............................................................................................................................3
Responsible Persons on Site..................................................................................................................4
Steps Of Installation.............................................................................................................................4
Attached Documents............................................................................................................................4
Time line Schedule................................................................................................................................5
Page 2 of 4
Purpose
This method of statement is written for the purpose of Establishing method and procedure for the Installation of Power Panel
inside Dining Hall 2.
Location Of Activity
Dining Hall-2, Jizan Aramco Camp
Scope Of Work
In accordance with ARAMCO's consent, Tamimi will install a Power Panel inside Dining Hall-1 for new machines. For this
purpose, we have to bring the following changes in the existing system:
Material Used:
100 Amps Al-Fanar Power Panel (PP).
4C*50 mm CU/XLPE/PVC Main Cable.
1C*25 mm CU/PVC Earthling Cable.
PVC Conduits.
Page 3 of 4
Responsible Persons on Site
Steps Of Installation:
To carryout activity for the installation of Power Panel, below mentioned procedure is recommended to ffollow-up step
by step in sequential manner.
Install the Power Panel Inside Dining Hall and make sure that the front area enough space when open the door do
not touch to other.
Excavate the cable route.
Lay the 50 mm cable by putting inside the PVC conduit.
Inform fire alarm team.
Pull the Cable inside the main DP.
During cable pulling inside the DP, turned off incomer breaker and put the LOTO.
Transformer close point will be open for 1 hour.
Remove the cable bedding insulation and Start Cable Termination inside the main DP and PP inside the Mess Hall-
1.
Care is taken that the cores are not crossing each other.
Core insulation is removed according to the size of lug.
Crimp the lugs with the crimping tool.
Proper size of nuts and bolts are to be used for fixing the lugs to the terminals of breaker.
After finishing cable termination, remove the LOTO
Close the open point from transformer and turn on the incomer’s breaker
Check the required voltage and current at PP’s Main Breaker (MCB).
Complete the Backfilling work and repair footpath.
Clean the Area.
Page 4 of 4
Load Schedule:
QT Amp
Equipment Name Y Phase s VA
74822.
Shawaya Machine 1 3 36 4
49881.
Deep Fryer 1 3 24 6
Shawarma Machine 1 3 15 31176
Spare 25
Attached Documents:
DP Load Schedule
Cable Route