Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

Program: King Abdullah Financial District (KAFD)

Document Submission Sheet

Programme No: KAFD


Parcel / Project: CP03a – 4.10
Method Statement of Removal of edge barricading L-02 Upper roof and Lower
Document Title: Roof
Document No.: KAFD-A2-4.10
Revision No.: R00

Action Print Name Signature Role Date

Prepared Ali Rahman Construction Manager 04-01-2023

04-01-2023
Reviewed Jitender Sharma QA/QC Manager

04-01-2023
Approved Kumaresun Nataraj Project Head

Form No. KAFD-AL-GEN-SAP-QMS-FRM-00022 R00 02 Feb 2022


Page 1 of 12
Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

Submission Details

No. Item Description

Revision History

Revisio Reviewe Approve


Date Description Prepared Checked
n d d

R00 04-01-2023 Issued for Approval AR FH JS KN

* Add additional rows as required.


** Use Initials for Prepared, Checked, Reviewed and Approved

Changes List

Page
Change No. Change Description Section Number(s)
Number(s)
01
02

03

Document No. Page 2 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

Table of Contents

1. OBJECTIVE

2. PURPOSE AND SCOPE

3. REFERENCES AND STANDARDS

4. DEFINITIONS AND ABBREVIATIONS

5. RESPONSIBILITIES

6. RESOURCES REQUIREMENT

7. PROCEDURE AND METHODOLOGY

8. FIELD QUALITY INSPECTION

9. WATER LEAKAGE RECTIFICATION

10. PROTECTION OF FINISHED WORK

11. HEALTH AND SAFETY

Document No. Page 3 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

1: OBJECTIVE: Removal of edge barricading L-02 Upper roof and Lower Roof

2: PURPOSE AND SCOPE Removal of edge barricading L-02 Upper roof and Lower
Roof

3: REFERENCES AND STANDARDS


 Project Specification SECTION 07105, 07556
 ANSI/ASTM D746
 ASTM D1004
 ASTM D3020
 ASTM D4068
 ASTM D4451
 ASTM D4637
 ASTM E96
 ITP
 NRCA (National Roofing Contractors Association)-waterproofing manual.
 Approved shop drawings and Approved Materials.
 Project Drawings Issued for Construction (IFC)
 Health and Safety Plan (HSE) R01KAFD-RY-RIA2-CP03-SHP-HSE-PLN-05001-R01
 Project Quality Plan (PQP) KAFD-RY-RIA2-CP03-SHP-QMS-PLN-05001-R01
 Drawings: KAFD-A2-411-COMN-NSF-XXXXX-SHP-ARC-SHD-00101

4: DEFINITIONS AND ABBREVIATIONS


CLIENT : KAFD
PMCM : Project Management – Construction Management Consultant - SAPL
(Saudi Arabian Parsons Ltd.)
CSC : Construction Supervision Consultant (DAR AL-HANDASAH)
MC : Main Contractor (Shapoorji Pallonji)
SC : sub-contractor.
CM : Construction Manager
NCR : Non-Conformance Report

5: RESPONSIBILITIES

5.1

Document No. Page 4 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

5.2
Project Director:
 It is the overall responsibility of Project Director to organize resources to perform
construction activities as per project specifications in compliance with quality,
schedule, and safety requirements.

5.3 Construction Manager:


 It is the responsibility of CM that construction activities are being executed
according to the relevant project specifications, in compliance with quality, schedule
and safety requirements.

5.4 Architect Engineer/Site Engineer


 Architect Engineer/Site Engineer shall monitor all the architectural activities in
accordance with project specifications, Approved shop drawings, IFC drawings by
following the safe conditions under the contractor’s site safety plan.

5.5 QA/QC Engineer


 QA/QC Engineer shall make sure the work is executed as per project requirements
and carry out all field inspections under project specification 01400 related to the
quality control services and the requirement of project specification, and approved
method statement.
 Ensure the material has been approved by consultant prior to use at site.
 Work should be carried out as per latest revision of drawings.
 Monitor the quality of works and in conformance with the IFC drawing as per
approved checklist.
 Ensure the implementation of the ITP with associate checklist as per sequence of
work activities.
 Ensure all inspections and testing activities has been completed and keep record.
5.6 Safety Inspector

 The HSE officer will monitor and implement all HSE related issues. He shall ensure that
all necessary requirements regarding health, safety and environment concern are met.
 To ensure that all construction activities would be carried out under approved HSE
Plan.
 Make sure that all workers have proper PPEs.
 Confirm and make sure that proper certifications and inspections of equipment are
updated prior to start the work.
 He will make sure the provision of safety arrangements for work area and will carry
out the required inspections.

Document No. Page 5 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

 Makes sure the presence of work permit and list of involved personal at site.
 He shall ensure placement of all signals, signs and barricades until work
completion.
 Produce the Job Risk Assessment prior to work commencement and will identify the
hazards (if any) before start of all construction activities.

6: RESOURCES REQUIREMENT
6.1 Manpower
Site Engineer
Scaffolding Supervisor
Scaffolders
Safety Officer

6.2: Tools, Equipment and PPE’s


Tools & equipment shall comprise, but not limited to:
 Spanner
 Hammer
 Binding wire cutter
 Fire Extinguisher
 Safety Goggles
 Safety Gloves
 Face Mask
 Safety Helmet
Safety Harness
 Rope life line

7: PROCEDURE AND METHODOLOGY:


The method of removal of edge barricading L-02 upper and lower roof at P-4.10
7.1 General
The method of removal of edge barricading L-02 upper and lower roof at P-4.10

7.2 EXECUTION
7.2.1. EXAMINATION
 Verify life line and anchor points

Document No. Page 6 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

 Work will be carried roof.


 The crew will be fully protected and they will anchor their harness to the
horizontal lifeline provided.
 Full time supervisor will be available to monitor the safe execution of work.
 Wind speed will be monitored regularly and in case there will be high wind speed
or adverse weather condition, work will be stopped until the condition is normal..
 After execution, good housekeeping will be ensured.

7.2.2. PREPARATION
 Installation of scaffolding Tower for lifeline anchor.
 Fixing of lifeline
 Exclusion zone provide on the ground floor with watcher.
 Start removal of barricading.

 either by damaged or opened overlap areas


 Surface preparation shall be done for EPDM and should take 48 hrs for
damp free surface and shall be 100% dry.
8. HEALTH & SAFETY:
 The entire works will be carried out as per guidelines established in the project
specification HSE plan and KAFD Health and Safety Minimum Standards.
 Work permit will be arranged prior to start the removal of barrication.
 Material or equipment should be maintained in an orderly manner and labelled in
accordance with statutory requirements and use in safe manner.
 All efforts shall be made to keep the Environment clean.
 All personnel involved will use necessary PPE as required such as safety helmet,
glasses, shoes, gloves, ear plugs, dust mask etc.
 The workers will be made aware of HSE requirements related to this activity through daily
toolbox and HSE talk.
 Engineer (HSE) will inspect all equipment prior to use.
 If the installation works is at night-time, arrange sufficient lights for good visibility.
 First Aid Kit is installed in ground floor and every each second level.
 Contact with Emergency Response Team in case of abnormal event.

Document No. Page 7 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

 Patient will be sent to hospital if severity (Saudi German Hospital)

Emergency Response/Rescue Team

Document No. Page 8 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

NEAREST EMERGENCY HOSPITAL FROM KAFD CP03 - A & C

NEAREST EMERGENCY HOSPITAL FROM KAFD CP03A&C

NEAREST GOSI HOSPITAL FROM KAFD- CP03 A & C

Document No. Page 9 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

NEAREST GOSI HOSPITAL FROM KAFD CP03A&C

Document No. Page 10 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

Site First Aid Clinic Location:

Document No. Page 11 of 12


Program: King Abdullah Financial District (KAFD)
Document Title: Method Statement of Removal of edge barricading L-02 Upper roof and Lower Roof

Emergency Contact Number:

Document No. Page 12 of 12