MS For Romoval Edge Bracation
MS For Romoval Edge Bracation
04-01-2023
Reviewed Jitender Sharma QA/QC Manager
04-01-2023
Approved Kumaresun Nataraj Project Head
Submission Details
Revision History
Changes List
Page
Change No. Change Description Section Number(s)
Number(s)
01
02
03
Table of Contents
1. OBJECTIVE
5. RESPONSIBILITIES
6. RESOURCES REQUIREMENT
1: OBJECTIVE: Removal of edge barricading L-02 Upper roof and Lower Roof
2: PURPOSE AND SCOPE Removal of edge barricading L-02 Upper roof and Lower
Roof
5: RESPONSIBILITIES
5.1
5.2
Project Director:
It is the overall responsibility of Project Director to organize resources to perform
construction activities as per project specifications in compliance with quality,
schedule, and safety requirements.
The HSE officer will monitor and implement all HSE related issues. He shall ensure that
all necessary requirements regarding health, safety and environment concern are met.
To ensure that all construction activities would be carried out under approved HSE
Plan.
Make sure that all workers have proper PPEs.
Confirm and make sure that proper certifications and inspections of equipment are
updated prior to start the work.
He will make sure the provision of safety arrangements for work area and will carry
out the required inspections.
Makes sure the presence of work permit and list of involved personal at site.
He shall ensure placement of all signals, signs and barricades until work
completion.
Produce the Job Risk Assessment prior to work commencement and will identify the
hazards (if any) before start of all construction activities.
6: RESOURCES REQUIREMENT
6.1 Manpower
Site Engineer
Scaffolding Supervisor
Scaffolders
Safety Officer
7.2 EXECUTION
7.2.1. EXAMINATION
Verify life line and anchor points
7.2.2. PREPARATION
Installation of scaffolding Tower for lifeline anchor.
Fixing of lifeline
Exclusion zone provide on the ground floor with watcher.
Start removal of barricading.