Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

INSPECTION RELEASE NOTE

Work Order No.


PT
Customer STMQP WI-
Customer P.O. No.
SAGA
Part
Item Name
Drawing No. Part Name
TRAD
No.
1
E
TPI2Inspection Report
Manufacturing Standard API 6A 20th Edition
MURN
3
Production specification
I
Level
Performance
Requirement
Services
Material Class B
Temperature Class U
Quantity
Inspection Documents
Material Heat Number
NDE Report - MPE
NDE Report - LPI
NDE Report - RT
Hydro Pressure Test /FAT
Report
Serialization Traceability
Report
Hardness Report
Marking

Color/Process code
Visual inspection of
color /Process
Remarks

Sign By,

(Purwadi Santoso)
Quality Assurance

MANUFACTURERS
OF PRIMARY
CEMENTING
EQUIPMENT

Quality Control Dept API Q1 9th EDITION Date : Page : 1


Document Doc. Rev.
Approved by
No. Date No.

Head Office:
Menara Hijau, Ground Floor, Jl. MT Haryono Kav.33 Jakarta 12770 Tel: (62-21) 7985951 Fax: (62-21) 7986134
Marketing Office:
Jl. Adityawarman No.51 Kebayoran Baru Jakarta 12160 Tel: (62-21) 72797009, Fax: (62-21)7211435
Factory:
Jl. Lumba-lumba, Log Pond Selili, Samarinda PO BOX 8000, Tel.: (62-0541) 240 801, Fax.: (62-541) 240 604

You might also like