Professional Documents
Culture Documents
Lasur Station MBR
Lasur Station MBR
AURANGABAD.
: - 042601
:-CT/AUB/R/05071/23
: - 05/05/2023
NABl Accredited H .al Testing lab I Soil Investigation I NOT I Structural Audit I Survey
(B CIVIL TECH
d sampling in soil & rock was carried out using rotary drilling. Borehole in
using rotary drilling method. SPT was carried wherever possible. NXsize
barrel with diamond bit was used to drill in rock. Water was circulated to
bit. Ground water table was recorded after 24 hours of completion of
were numbered chronologically & preserved in core boxes.
drilling. Rock
As per oral instructions of representative of Client the boreholes were drilled as
WATER
DEPTHIN BORE TABLE,
SOIL/BOUL CORINGIN TERMINATION DEPTHIN,
LOCATION DER ROCK IN M DEPTHIN M M
INM
LASUR
STATIONMBR
0.0 6.0
(CAPACITY- 6.0
BHOl
1,14,000L),
GANGAPUR.
3.2.1
Standard Penetration Number is usually corrected for Overburden
according to ..IIUlln ..
• 01, page 08, l.S. 2131-1981. The corrected value for overburden is
further for dilatancy if the stratums consist of fine /medium sand & silt below
water table.
Bore No. 01
Effective Nafter
(kg/cruZ) n
formulae:
Where, Ql a Q2 are allowable soil pressure under raft foundation in Kgjm2. (Using a
factor of
allowable S.B.C.
G CAPACITYFOR OPEN FOUNDATION-
Disintegrated vesicular
31.27
25
rock recovered as a
sand (Murum)
Disintegrated vesicular 25
32.63
rock recovered as a
sand (Murum)
BH- Disintegrated vesicular 25
35.35
01 rock recovered as a
sand (Murum)
Disintegrated vesicular 30
39.43
rock recovered as a
sand (Murum)
Disintegrated vesicular 35
42.58
rock recovered as a
sand (Murum)
lr:l~~::er.
Shweta D. Wagh