Safe Work Method Statement Abirami Builders

Property Name: Nokia Factory,


Address: Oragadam, Tamil Nadu

Company Name: Abirami Builders Activity/Trade: Factory Expansion

Address: Chengalpattu Office Contact No: 044 7111 6675


Project Manager Name: Tamil Mannan Contact No: 90952 48855
Method Statement Title: Manpower mobilization, Tools and tackles Mobilization, Machinery and equipment, Vehicle checks, PEB works dismantling.
Method Statement prepared by: Surya & Durai rajan
Method Statement reviewed by: Rajesh, Safety Head
Person who
Procedure (in steps) Possible Hazards Risk Rating Control Measures
will ensure
(Break the job down into steps. Each (Identify the hazards associated (See below) (Describe what action or procedure will be taken to eliminate or
minimize the risk of injury or damage. Use the Hierarchy of this
step should accomplish some major with each step. Examine each to happens
task and be in logical sequence.) find possibilities that could lead to Controls below as a guide
an accident or potential harm 1. Eliminate the Hazard
arising.) 2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
 Health Hazard  Ensure all have uploaded Aarogya Setu app on our mobile. Site
Mobilization of Manpower (Respiratory illness caused  Ensure that self -deceleration should be provided after Supervisor
by COVID-19 Infection entering at site premises.
that may lead to fatality) M  Ensure Fitness certificate mandatory for all.
 Lack of awareness on how  Ensure to use mask all the time and keep social distancing.
to protect yourself against  Deployment of employee from containment zone of COVID
the infection of COVID- 19, shall not be allowed at site.
19.  Ensure that Body temperature monitoring through Thermal
 Lack of awareness of Scanner or other devices to monitor the body temperature of
about site safety rules. each employee at entry gate.
 Physical in capabilities  Implementing safe distancing (at least 6 Feet) on
/deficiency camp/accommodation, workplace area, Mess Hall, Rest
Shelters and other Welfare Facilities to avoid spreading of
the virus.
 No Hand Shake Policy.
 The entire team must undergo the safety Induction training
program covering all site safety rules & regulations.
 All Employees and workers, Vaccination certificate,
medical fitness certificate, insurance or ESI and temporary
ID card, shall be submitted for approval before the work
commencement. Gate 2 shall be used for vehicle entry &
exit.
 Ensure use of required PPE’s like helmet, safety shoes, and
reflective jacket and nose mask
 Allow the employees who have valid medical certificates
Mobilization of tools and tackles  Un inspection  Tools to be inspected before entering workplace/ Site
tools/machine and lifting prior to work Supervisor
tools and tackles used  All rotating parts to be guarded
for erection activity. M  Any defects to be rejected and removed from the
 Un authorized tools site immediately
brought to site.  All tools and tags to be provided with Inspection
 Worker without tags
induction.  All tools and tackles third party certificates need
 Untrained workmen to produce
operate the equipment’s.  For new equipment’s need to submit SOP and get
 Uninspected equipment, approval
 Failure of machinery  Get all the tools/tackles inspected from the EHS
during movement, Team/certified electrician.
 Oil leakages,
Vehicle checks at gate  Vehicle entering from M  Disinfection of machinery, vehicles should done before Site
COVID contaminated entering at site, handle, doors and seat also disinfections Supervisor
zone. on regular basis. Machine operator also wash hand by
 Chances of COVID 19 sanitizer on regular basis.
spreading due to contact  If vehicle came from containment zone of COVID 19, not
of vehicle handle, body to allowed at site.
and other part.  Ensure that the vehicle is sanitized before entry
 Chances of spreading of  Driver will be scanned for temp. His hand will be
covid 19 to all worker sanitized.
and staff with each other  Driver is wearing Nose mask for Covid-19 will be
contact. ensured.
 Uninspected equipment,  Drivers should wear pants & shirts, lungi is not permitted
 Failure of machinery inside.
during movement,  previous history of locations visited for last 14 days will
 Oil leakages, be analyzed.
 Operator without valid  Valid licensee and all legal papers of vehicles will be
license or certificates. checked
 Entry of unfit vehicle  All the vehicle will report to security gate
 Vehicle contaminated  Security person will check for all legal documents like
with Covid-19 virus RTO registration, insurance, fitness, driving license etc.
 Documents will be verified by EHS or P&M
representative.
 After inspection only vehicle will be allowed to enter at
site.
Installation of lifelines and cutting of Slip Trip & Fall,
roof sheet (5mm Thickness) with AG Improper Access 1.Follow PTW system
cutter. Damaged roof sheet 2.All required PPEs such as nose mask, Safety googles, safety
Unavailability of temporary life shoe and reflective jacket to be worn.
Access to rooftop - Through line 3.Roof sheet shall be properly inspected before work.
Permanent staircase Improper use of temporary • Check the condition of emergency devices like Fire
horizontal life line or safety Extinguisher.
harness H • First aid box to be available at work area. Site in
• Determine the mandatory PPE'S (safety shoes, safety helmet, charge/HSE
Electrocution reflective jacket, nose mask, Use of cut/abrasive resistant gloves & personal
Eye injury goggles/ face shield) with the site SWMS.
Fire Hazard • Only trained and certified employees are allowed to perform the
Noise hazard hot work like sheet cutting .
Caught in between • Flammables should be kept 30 feet away from hot work area.
Ergonomically hazard • Barricade the hot work area, Close work area to prevent entrance
Flying particles/objects of others.
• Wear designated hearing protection based on known or potential
noise levels by using ear plugs / muff.
• Maximum supervision on hot work to be given.
• Awareness Training should be given on hot work.
• Risk to be assessed and training given to the worker.
• All cutting machines supply to be drawn through 30ma ELCB
• Use correct size of cutting blade and take Supervisor approval
before the start of cutting works.
• Ensure cutting machine is not powered while mounting and
dismounting
• fire watch /Helper will be deployed while doing the hot work
• All cutting machines should have guards and holding handle in
place
Gas Cutting works: - 1.Follow PTW system
1.Eye injury, 2.Proper housekeeping to be followed
Columns, Beams, Dock sheet, Purlin 2. Burn Injuries 3.NOKIA LSR need to explain.
Clamps, Hand railings Rusted nut & 3. respiratory illness 4.All documents related to cylinders to be available before
bolts etc.… 4.Injuries/fatal due to fire entering premises. Site in
5.Property damage H 5.Signages and board and area cordoning. charge/HSE
6.Fire Hazard 6.Trained personal only need to deploy personal
7.Nose mask to be wear at all time.
8.Regular Supervision Engineer/Supervisor.
9.cylinder should be in vertical condition & place it in a stand &
ensure chain lock

should be ensured
1.Follow PTW system
2.All required PPEs such as nose mask, Safety googles, safety
shoe safety harness & reflective jacket to be worn.
Existing PEB dismantling work with 1.Slip Trip & Fall, 3.Proper housekeeping to be followed
the help of boom lift. 2. Entanglement H 4.Ensure no overhead line crossing at work place. Site in
3. Fall from Height 5.The Boom lift and tools must get pre entry before using the charge/HSE
(Wall/Roof De-screwing, Roof/wall 4. Toppling of Vehicles same. personal
sheet removing, secondary supports 5. Material fall on persons 6.All documents related to vehicle to be available.
(i.e. purlins, sag rods, braces etc.,) 6. Hit Hazard 7.Signages and board to indicate machinery and manpower
removing, insulation, gutter, down 7. Electrocution activity is ongoing
take pipe removing. 8. Uneven ground & loose soil 8.Vehicle conditions to be checked before each activity start
9.Workers to be trained on hazardous material handling
10.Nose mask to be wear at all times while handling the dust
11.Regular Supervision Engineer/Supervisor
12.Engae trained personal only for doing work at height
1.It is ensured that vehicle is parked on even surfaces & should be
checked by execution & HSE team.
2.If required the area of loading/unloading shall be compacted if
surface is uneven by damping.
3.The mobile crane shall be inspected & TPI certified fit for use
4.Overloading shall be avoided.
5.When the load is lifted, sudden movement of vehicle shall be
avoided.

6.Tandem lifting shall be avoided.


H Site in
1.Uneven Surface
7. Vehicle documents to be checked and only competent driver charge/HSE
2.improper Lifting and shifting
Removing of Column, Rafter & should operate the vehicle personal
material
Cladding purlins & 8.Lifting is done by competent rigger only.
3.Nonstandard use of lifting
Removing/Unloading of materials 9.Execution & HSE team should ensure that tag lines are used to
Gear/Accessories
from height by using crane. prevent swaying of loads while unloading by crane
4.Sharp Edges
10.flag man is maintained.
5.Fall of men & Materials
11.Continuous monitoring by site engineers & HSE Dept.
12.Adequate illumination to be provided at all times of the work
activity.
13.Visual / Manual Inspection of wire rope/web sling is
conducted.
14. Job specific PPE’s to be worn
15.All the new purchased & existing lifting gears shall be
inspected internally before introducing to site
16. Sharp edges are secured by foam material.
17. Work is carried out by experienced personnel
18.Job specific PPE's such as gloves are provided.
1. Explain MSDS to all works
2. First aid box to be available at work area.
H 3. Determine the mandatory PPE'S (safety shoes, safety helmet,
1.Hit hazard
reflective jacket, nose mask, Use of cut/abrasive resistant gloves & Site in
2.Slip & trip hazard
goggles). charge/HSE
3.allergy
Removing of insulation materials 4. Barricade the work area. Keep work area organized and free of personal
4. Dust Pollution
such as rockwools surface obstructions during task. Close work area to prevent
5. Suffocation
entrance of others.
6. Fling object/Eye injury
5. Maximum supervision on work to be given.
6. Awareness Training should be given related to hazardous
material handling.
7. Risk to be assessed and training given to the worker.
8. Store the hazardous materials in a designated area

•work permit to be followed


• Check the condition of emergency devices like Fire
Extinguisher.
1.Hit hazard M • First aid box to be available at work area.
2.Slip & trip hazard 1. Determine the mandatory PPE'S (safety shoes, safety helmet, Site in
3. Entanglement reflective jacket, nose mask, Use of cut/abrasive resistant gloves & charge/HSE
RCC floor cutting using diamond 4. Injury to person goggles) with the site SWMS. personal
saw cutting machine and breaker 5. Noise Hazard 5. Barricade the hot work area. Keep work area organized and free
machine 6. Dust Pollution of surface obstructions during task. Close work area to prevent
7. Electrocution entrance of others.
8. Fling object/Eye injury 6. Use of fire-resistant gloves, safety shoes.
8 Maximum supervision on work to be given.
9. Awareness Training should be given on floor cutting work.
10. Risk to be assessed and training given to the worker.
11. Use correct size of cutting blade and take Supervisor approval
before the start of cutting works.
1.Materials Slip
2. Dumping of scrap in Site in
unauthorized area. charge/HSE
M 1 All the identified unwanted materials from the location shall be personal
Housekeeping 3. Personal Injury
removed from the area
4.Ergonomic hazard
2 Area shall be kept neat and clean without any obstacles
5.Difficulty in breathing
6.Dust inhalation

Personnel Summary

SUPERVISOR’S DETAILS
Supervisors Name & Qualifications: Name: Tamil Mannan
Experience: 10 years
Qualifications: B.E Civil

Supervisor’s Responsibilities: In addition to the above, the supervisor is to provide training in the use of this SWMS, issue PPE and provide training in the same, supervise the
work, ensure conformity with this SWMS, amend the SWMS when additional hazards are found (and if applicable, ensure all workers receive a
tool-box talk to discuss the control measures for the additional hazards).

DESCRIPTION OF TRAINING THAT HAS BEEN GIVEN TO PEOPLE INVOLVED WITH THE WORK

H&S GENERAL INDUCTION: General Safety Induction

WORK ACTIVITY TRAINING: Ladder safety, Working at height, Manual handling & Operation of power tools, Vehicles, Road safety.

SITE INDUCTION: Site safety induction, Site Tool Box Meeting

OTHER: (List other training undertaken by workers): Training schedule.

TICKETS, PERMITS or LICENCES REQUIRED to undertake this work (ie. Certificates of Competency, Confined Spaces etc):
Scaffolding & Power tools competency certificate

LEGISLATION, CODES OF PRACTICE and GUIDELINES applicable to this work

Additional Codes and Standards applicable to this trade:

Equipment & Material Summary


PLANT and EQUIPMENT USED and MAINTENANCE FREQUENCY :

Serial Plant/Equipment Contractor Work Cover Plant Hazards Maintenance/service records and log books sighted
Registration No identified and by Principle Contractor prior to equipment being
(if applicable) controlled within used on site?
SWMS?
Yes No Sign Date

Cutting machine AB
Drilling machine
Screwing machine
Breaker machine
Hand tools
Boom Lift
Crane

ELECTRICAL EQUIPMENT USED DURING THE WORKS (Attach Electrical Equipment Register if applicable):
Item Tag/Item Testers Name & License Test Date Result Test Date Result
Number Signature Number
Cutting machine ____ /____ /____ ____ /____ /____
Drilling /
Hammering ____ /____ /____ ____ /____ /____
machine
Breaker
Machine
N.B. - All workers must be trained in the safe use of all chemicals and provided with the PPE required when using and storing these chemicals. Disposal is to be as per the waste disposal
methods in the MSDS. Spillage and leaks are to be cleaned up as per the spill/leak procedures identified in the MSDS.