Professional Documents
Culture Documents
Revised Manual For Chart Installation v56 E
Revised Manual For Chart Installation v56 E
Revised Manual For Chart Installation v56 E
Additional Manual
for Chart Installation
Preface
This book is the additional manual that describes the usage of the chart of
JAN-701B/901B/2000 ECDIS, JAN-1186 Route Planning System (RPS), NDC-1186 Navigation
Workstation (NWS) and JMA-900B series Chart RADAR. To maintain the performance of
these equipment, please operate it after having understood this manual thoroughly.
i
Before Operation
Pictorial Indication
Various pictorial indications are included in this manual and are shown on these equipments so that you
can operate them safely and correctly and prevent any danger to you and / or to other persons and any
damage to your property during operation. Such indications and their meanings are as follows. Please
understand them before you read this manual.
Warning label
There are warning labels on the equipments.
Do not try to remove, break or modify the labels.
ii
Precautions on Operation
Turn off the power before opening the front cover for confirming license key
(eToken). And do NOT touch the other parts. Otherwise, an electric shock or a
malfunction may occur.
Before reading and writing of the file by using the USB storage, confirm that there
is not a computer virus in the USB storage.
Otherwise they may affect other equipments and may cause a malfunction.
iii
Do not insert the disk in Floppy disk drive and CD-ROM drive for long time.
Doing so will cause damage to drive.
Do not turn off the power during index creation by Chart Portfolio.
Doing so may cause a malfunction.
Do not leave the USB Storage in the USB port after use.
Malfunctions may result.
iv
Glossary
AIO :Admiralty Information Overlay. AIO is a digital dataset that is designed to be
displayed over ENCs in ECDIS to provide additional information to the
navigation published by United Kingdom Hydrographic Office (UKHO).
ARCS :Admiralty Raster Chart Service. A raster chart published by United Kingdom
Hydrographic Office (UKHO).
AVCS :Admiralty Vector Chart Service. A vector chart published by United Kingdom
Hydrographic Office (UKHO).
Cell permit :A file containing an encryption key for S-63 chart. Supplied by UKHO
(AVCS), PRIMAR, and Hydrographic and Oceanographic Department of Japan
Coast Guard.
ChartCo :System to import and update the chart data via LAN
Chart Portfolio :Software to manage charts. Imports and updates the charts.
RTU :C-MAP provides a Real Time Updating (RTU) service. It can update CM-93/3
v
chart database via an E-mail.
SA Certificate file :An electronic file certifying the supplier of S-63 chart. Required for
import/update of S-63 chart.
Update CD :Chart CD containing only updated content from Base CD. Can be used with
Base CD imported.
USER permit :A user-specific code assigned by JRC. Required in using ARCS and S-63
charts.
vi
Contents
Glossary.....................................................................................................................................................................................................v
Overview Flowchart..............................................................................................................................................................................ix
1. Chart Portfolio ................................................................................................................................................................1-1
1.1 Method for Starting Chart Portfolio.............................................................................................. 1-1
1.1.1 Method for Starting Chart Portfolio (Startup Menu) .............................................................. 1-1
1.1.2 Method for Starting Chart Portfolio (Navigation & Planning Menu) ........................................ 1-2
1.2 Method for Exiting Chart Portfolio................................................................................................ 1-4
1.3 Chart Portfolio Screen................................................................................................................. 1-5
2. Using ENC/AVCS Chart..............................................................................................................................................2-1
2.1 Importing ENC/AVCS Chart・AIO data ......................................................................................... 2-1
2.1.1 Importing SA Certificate File (Only S-63) ............................................................................. 2-1
2.1.1.1 Importing SA Certificate File .................................................................................... 2-1
2.1.1.2 Selecting SA Certificate File .................................................................................... 2-4
2.1.2 Importing Cell Permit (Only S-63) ........................................................................................ 2-6
2.1.3 Importing ENC/AVCS Chart ............................................................................................... 2-10
2.1.4 Importing AIO data ............................................................................................................. 2-14
2.2 Updating ENC/AVCS Chart・AIO data ........................................................................................ 2-16
2.2.1 Updating ENC/AVCS Chart................................................................................................ 2-16
2.2.2 Updating AIO data.............................................................................................................. 2-20
2.3 Updating Cell Permit (Only S-63) ............................................................................................... 2-22
2.4 Confirming Cell Permit (Only S-63) ............................................................................................ 2-22
2.4.1 Confirming the number of charts license............................................................................. 2-22
2.4.2 Confirming expiry date ....................................................................................................... 2-23
2.4.3 Confirming SA Certificate File ............................................................................................ 2-25
2.4.4 Confirming S-63 User Permit ............................................................................................. 2-27
2.5 Confirming ENC/AVCS Chart Updating History .......................................................................... 2-29
2.5.1 Confirming by Chart Portfolio ............................................................................................. 2-29
2.5.2 Confirming by Navigation & Planning ................................................................................... 2-30
2.6 Deleting ENC/AVCS Chart・AIO data ......................................................................................... 2-31
2.7 Deleting Cell Permit (Only S-63) ................................................................................................ 2-34
2.8 Changing the Contract ............................................................................................................... 2-35
2.8.1 Deleting previous Cell Permit ............................................................................................. 2-35
2.8.2 Importing new Cell Permit .................................................................................................. 2-35
2.8.3 Updating ENC/AVCS Chart................................................................................................ 2-35
2.8.4 Deleting ENC/AVCS Chart................................................................................................. 2-35
3. Using ARCS Chart.........................................................................................................................................................3-1
3.1 ARCS Chart................................................................................................................................. 3-1
3.1.1 Checkup of ARCS Chart ...................................................................................................... 3-1
3.2 Importing ARCS Chart ................................................................................................................. 3-2
3.2.1 Importing Chart Permit......................................................................................................... 3-2
3.2.2 Importing ARCS Chart.......................................................................................................... 3-5
3.3 Updating ARCS Chart .................................................................................................................. 3-8
3.4 Updating Chart Permit ............................................................................................................... 3-10
3.5 Confirming Chart Permit ............................................................................................................ 3-11
3.5.1 Confirming the number of charts license............................................................................. 3-11
3.5.2 Confirming expiry date ....................................................................................................... 3-12
3.5.3 Confirming Chart Permit Information .................................................................................. 3-13
3.5.4 Confirming ARCS PIN No./User Permit .............................................................................. 3-14
3.5.4.1 Confirming by Hardware Key Information ................................................................ 3-14
3.5.4.2 Confirming by ARCS PIN panel when Navigation & Planning starts.......................... 3-16
3.5.4.3 Confirming by Chart Portfolio................................................................................. 3-17
3.5.4.4 Confirming User Permit of the Chart Permits FD.................................................... 3-17
3.6 Confirming ARCS Chart Updating History................................................................................... 3-18
3.6.1 Confirming by Chart Portfolio ............................................................................................. 3-18
vii
3.6.2 Confirming by Navigation & Planning ................................................................................... 3-19
3.7 Deleting ARCS Chart ................................................................................................................. 3-20
4. Using C-MAP Ed.3.........................................................................................................................................................4-1
4.1 The Dynamic Licensing Service .............................................. 4-1
4.1.1 Introduction ......................................................................................................................... 4-1
4.1.2 Activating Dynamic Licensing ............................................................................................... 4-2
4.2 C-MAP Ed.3 Chart....................................................................................................................... 4-3
4.2.1 Checkup of C-MAP Ed.3 Chart (Static License) ................................................................... 4-3
4.2.2 Checkup of C-MAP Ed.3 Chart (Dynamic License) ............................................................... 4-4
4.3 Importing C-MAP Ed.3 Chart ....................................................................................................... 4-5
4.3.1 Importing C-MAP Ed.3 Chart................................................................................................ 4-5
4.3.2 Importing License................................................................................................................. 4-9
4.3.2.1 Case of Static License............................................................................................. 4-9
4.3.2.2 Case of Dynamic License ....................................................................................... 4-13
4.3.2.3 Confirming Chart Display........................................................................................ 4-19
4.4 Updating C-MAP Ed.3 Chart ...................................................................................................... 4-21
4.4.1 Updating C-MAP Ed.3 Chart by CD (or DVD) ..................................................................... 4-21
4.4.2 Updating C-MAP Ed.3 Chart by RTU .................................................................................. 4-23
4.5 Reporting for Dynamic License................................................................................................... 4-29
4.5.1 Confirming of Next Report Date ......................................................................................... 4-29
4.5.2 Report for Dynamic License ............................................................................................... 4-30
4.6 Confirming License .................................................................................................................... 4-31
4.6.1 Case of Static License ....................................................................................................... 4-31
4.6.2 Case of Dynamic License ................................................................................................... 4-32
4.7 Confirming Updates List............................................................................................................. 4-33
4.8 Deleting C-MAP Ed.3 Chart and License.................................................................................... 4-35
4.9 Confirming eToken Device ......................................................................................................... 4-37
4.9.1 Confirming eToken Device.................................................................................................. 4-37
4.9.2 Confirming System ID in Chart Manager ............................................................................. 4-39
5. Using ChartCo.................................................................................................................................................................5-1
5.1 ChartCo....................................................................................................................................... 5-1
5.2 Getting Chart Data in ChartCo (Step1) ........................................................................................ 5-2
5.3 Getting Chart Data in NWS (RPS) (Step2) .................................................................................... 5-2
5.3.1 Getting New Chart Data ....................................................................................................... 5-2
5.3.2 Selecting Previous Chart Data ............................................................................................. 5-4
5.4 Updating ENC Chart in NWS (RPS) (Step3) .................................................................................. 5-7
5.4.1 Confirming NWS (RPS) Setting ............................................................................................. 5-7
5.4.2 Importing SA Certificate file ................................................................................................. 5-7
5.4.2.1 Importing SA Certificate file ..................................................................................... 5-7
5.4.2.2 Selecting SA Certificate file ................................................................................... 5-10
5.4.3 Importing Cell Permit ......................................................................................................... 5-10
5.4.4 Updating ENC Chart........................................................................................................... 5-11
5.5 Updating ENC Chart in ECDIS (Step4) ....................................................................................... 5-15
5.5.1 Confirming ECDIS Setting .................................................................................................. 5-15
5.5.2 Importing SA Certificate file ............................................................................................... 5-15
5.5.2.1 Importing SA Certificate file ................................................................................... 5-15
5.5.2.2 Selecting SA Certificate file ................................................................................... 5-18
5.5.3 Importing Cell Permit ......................................................................................................... 5-18
5.5.4 Updating ENC Chart........................................................................................................... 5-19
6. Troubleshooting ..............................................................................................................................................................6-1
Reference Document 1: Alarm Information of S-57/S63 Chart ......................................................................................6-7
Reference Document 2: Alarm Information of ARCS Chart ........................................................................................... 6-13
Reference Document 3: Method for Confirming Path ...................................................................................................... 6-17
Reference Document 4: Method for Cleaning by the lens cleaner for CD/DVD drive......................................... 6-20
Reference Document 5: Method for Selecting Chart........................................................................................................ 6-22
Reference Document 6: ChartCo Operation Procedure.................................................................................................. 6-25
Reference Document 7: About Chart Manager for C-Map............................................................................................. 6-31
viii
Overview Flowchart
Overview flowcharts for chart portfolio operations are shown below:
START
YES
NO
YES
Completed
ix
Importing/Updating S-63 Chart
START
NO
YES
NO
Completed
・ Importing SA certificate file and cell permit can be done even in reverse order.
x
(2) Importing/Updating ARCS Chart
START
YES
YES
NO
YES
Completed
xi
(3) Importing/Updating C-MAP Ed.3 Chart
Importing/Updating by CD/DVD-ROM
START
YES
Completed
xii
Updating by RTU
START
YES
NO
Completed
xiii
(4) Changing the ENC/AVCS Chart Contract
START
NO
Completed
xiv
(5) Changing the ARCS Chart Contract
START
YES
NO
YES
Completed
xv
(6) Changing the C-MAP Ed.3 Chart Contract
START
Completed
xvi
(7) Updating ENC Chart by ChartCo -1
START
ChartCo
Downloading Chart Data (5.2)
NWS/RPS ECDIS
Getting Chart Data (5.3)
A B
xvii
Updating ENC Chart by ChartCo -2
NO
YES
NO
Completed
xviii
Updating ENC Chart by ChartCo -3
NO
YES
NO
Completed
xix
1. Chart Portfolio
1.1 Method for Starting Chart Portfolio
1.1.1 Method for Starting Chart Portfolio (Startup Menu)
Start Chart Portfolio according to the following procedures in Startup
menu.
[Startup Menu]
Attention:
• if no operation is conducted for about 10 seconds, the Navigation & Planning start up
screen will be displayed automatically.
• A Startup Menu depends on the model that uses it and the display is different.
1-1
1.1.2 Method for Starting Chart Portfolio (Navigation & Planning Menu)
Start Chart Portfolio according to the following procedures in Navigation & Planning.
1) Move the cursor to the upper screen section, and select in order of [(6) Chart] - [(2) Chart Portfolio] - [(1)
Create]. The Chart Portfolio screen will be displayed.
When Chart Portfolio is started from Navigation & Planning menu, both Navigation & Planning and Chart
Portfolio are running concurrently.
・ How to change the display from Navigation & Planning to Chart Portfolio
In Navigation & Planning menu
Move the cursor to the upper screen section, and select in order of [(6) Chart]-[(2) Chart Portfolio]-
[(2) Top Window].
・ How to change the display from Chart Portfolio to Navigation & Planning
In Chart Portfolio menu
Select in order of [Tool]-[Change Ecdis Main].
Attention:
• When Chart Portfolio is started by selecting [(6) Chart] - [(2) Chart Portfolio] - [(1) Create] from
Navigation & Planning, be sure to exit Chart Portfolio before exiting Navigation & Planning.
• Chart Portfolio cannot be started when the relative motion mode is selected or the radar image is
displayed. Also, when Chart Portfolio is converting charts, the relative motion and radar image
cannot be displayed.
• When displaying C-MAP Ed.3 chart and ARCS Chart, Chart Portfolio cannot be started from
Navigation & Planning.
1-2
[Chart Portfolio Screen]
Menu Buttons [Exit] Button
Attention:
・ When starting Chart Portfolio, it searches CD/DVD-ROM.
If CD/DVD -ROM is in CD/DVD drive, it might take time to get started.
1-3
1.2 Method for Exiting Chart Portfolio
Do not turn off the power during index creation by Chart Portfolio.
Doing so may cause a malfunction.
Exit Chart Portfolio by the following procedures. The exiting method is common for Startup menu and
Navigation & Planning.
2) Then the following confirmation dialog box opens. Left-click [OK] button to exit Chart Portfolio.
If ARCS chart has been imported / updated, an index (chart management information) is created after
pressing [Exit] button.
If the power fails and Navigation & Planning cannot be started at the worst, see “6. Troubleshooting”.
1-4
1.3 Chart Portfolio Screen
The Chart Portfolio main screen consists of the following parts:
• Menu
• Buttons (All button functions can be accessible from menu)
• Chart table display area.
1) Menu
[Chart] :
● [ARCS] - [Import/Regist Chart Permit]: opens “Import/Enter Chart Permit” dialog box for
importing chart files and registering Chart Permit. (This
is an administration tool.)
● [ARCS] - [Regenerate Index]: regenerates ARCS index (chart management information).
● [Import/Update]: starts importing/updating the charts loaded from CD-ROM.
● [Abort]: aborts importing/updating process.
● [ChartCo] - [ChartCo Online]:
●[ChartCo] - [Get chart from ChartCo]: gets chart data from ChartCo
● [Exit]: exits Chart Portfolio.
1-5
[Sort] :
[Edit]:
● [Select All]: selects all cells/zones in source chart table on Chart Portfolio main screen.
● [Delete]: deletes the selected cell in system chart table on Chart Portfolio main screen.
[View]:
● [Chart Information]: shows the detailed cell information of the chart being selected in the
source/system chart table on Chart Portfolio main screen.
(For S-57/S-63/ARCS)
● [ARCS License Information]: checks the validity of ARCS license information and shows the check
result.
● [Log]: displays the log on the right side of the screen during importing/updating process. Other
logs may also be displayed.
● [View old Edition]:
As the latest edition is installed in the system, older editions will not be displayed in the source
chart table.
Turning on [View old Edition] shows older editions in the source chart table, and make it possible
to use them as desired.
● [View old Type System Chart Tree]:
System charts is displayed in longitude and latitude folder tree.
1-6
[Tool]:
Attention:
・This is an administration tool. Do not use this menu.
● [Option]: allow you to set up options in “S-57”, “S-63”, “ARCS”, and “Advanced” dialog box.
● [Technical Tool]:
(This is an administration tool.)
● [Maintenance]:
(This is an administration tool. Do not use this menu.)
● [Change Ecdis Main]:
This menu will be valid when selecting in order of [MENU] - [(6) Chart] - [(2) Chart Portfolio], and
left-clicking [(1) Create] from Navigation & Planning menu. Left-clicking [Change Ecdis Main]
makes Chart Portfolio undisplayed.
In order to redisplay undisplayed Chart Portfolio, select in order of [MENU] - [(6) Chart] - [(2)
Chart Portfolio], and left-click [(2) Top Window] from Navigation & Planning menu.
Attention:
• [Change Ecdis Main] only makes Chart Portfolio undisplayed, but will not exit Chart
Portfolio. In order to exit Chart Portfolio, left-click [Exit] button.
• When C-MAP Ed.3 is installed in the system, it takes approximately 10 seconds for
[Option] dialog box under [Tool] menu to appear.
[Version]:
1-7
2) Button functions
Left-clicking this button re-reads the charts of the selected type from
CD-ROM.
Letf-click this button when displaying the log on the right side of the
screen during import/update process.
1-8
2. Using ENC/AVCS Chart
2.1 Importing ENC/AVCS Chart・AIO data
2.1.1 Importing SA Certificate File (Only S-63)
Attention:
• ECDIS can use the charts published by more than one data server (PRIMAR, UKHO, Hydrographic and
Oceanographic Department of Japan Coast Guard, etc.). It is necessary, however, to import and select SA
Certificate file to the system each time charts provided by a new data server are used. Before importing the
charts, for certification of ENC, import and select SA Certificate file contained in Chart CD-ROM provided by
the data server.
3) Left-click the [S-63/AVCS] tab in the “Option” panel, and then, the [Import of Certificate...] button.
The “Find file” panel opens.
2-1
4) Insert S-63 Chart CD-ROM into the CD/DVD-ROM drive, and wait until it is ready to be read.
5) Select [Q:] (Q drive) from the “Drive” combo box (a) as shown below.
(b)
(c)
(a)
7) Double-click the file name of SA Certificate file (such as “primar.crt”) in the “File name” list box (c).
2-2
9) Check the SA Certificate file information, and left-click the [OK] button.
10) As the message box appears left-click the [OK] button to close the box.
Import procedure is completed.
2-3
2.1.1.2 Selecting SA Certificate File
2-4
5) Check the information of SA Certificate file, and left-click the [OK] button.
Check the information of SA Certificate
file.
This information is PRIMAR or UKHO
(AVCS).
6) Check the file name of SA Certificate file (such as [1:primar.crt]), and left-click the [OK] button to close
the panel.
2-5
2.1.2 Importing Cell Permit (Only S-63)
Before reading and writing of the file by using the USB storage, confirm that there
is not a computer virus in the USB storage.
Otherwise they may affect other equipments and may cause a malfunction.
Do not leave the USB Storage in the USB port after use.
Malfunctions may result.
Select SA Cetrificate file of Cell Permit that does the import referring to “2.1.1 Importing SA Certificate
File (Only S-63)” before doing the import of Cell Permit.
2-6
3) Left-click the [S-63/AVCS] tab, and then, the [Import Cell Permit...] button.
The “Find file” panel opens.
4) Insert Cell Permit CD-ROM into the CD/DVD-ROM drive, and wait until it is ready to be read.
5) Select [Q:] (Q drive) from the “Drive” combo box (a) as shown below.
(c) (b)
(a)
2-7
7) Double-click the file name of Cell Permit (such as “PERMIT.TXT”) in the “File name” list box (c).
Attention:
• When Cell Permit is supplied in FD, insert it into the FD drive, and select [A:] (A drive).
•When Cell Permit is supplied in E-mail, save Permit.txt file (Cell Permit) attached E-mail to
the USB memory.Connect the USB memory and select [F:] (F drive).
- Save only Permit.txt file to the USB memory.
-When Permit.txt file is compressed, decompress the compressed file, and then save to
the USB memory.
2-8
12) Left-click the [OK] button to close the panel.
Import procedure of S-63 Cell Permit is completed.
2-9
2.1.3 Importing ENC/AVCS Chart
Attention:
• Decoding of chart and checking of permission start.
This processing takes several minutes or more (30 minutes, for example) depending on the number of
chart license.
2-10
Attention:
•. When UPDATE information is included in the BASE CD-ROM, since the following
dialog boxes are displayed, the [OK] button is left-clicked (PRIMAR or UKHO (AVCS ) ).
2-11
Left-clicking the [Log] button will show the import result.
[Log] button
[Log] window
Progress meter shows the progress of the import processing according to the
capacity of the chart files already processed.
2-12
5) Check that the import process is completed, and then, left-click the [Exit] button to exit Chart Portfolio.
2-13
2.1.4 Importing AIO data
AIO data CD can be gotten if you request to your chart provider. AIO data will be updated every week same as
the AVCS update CD. (But in some software version, the AIO function is not available.)
2-14
5) Check that the import process is completed, and then, left-click the [Exit] button to exit Chart Portfolio.
2-15
2.2 Updating ENC/AVCS Chart・AIO data
2.2.1 Updating ENC/AVCS Chart
1) Start the Chart Portfolio.
2) Import Cell Permit referring to “2.3 Updating Cell Permit (Only S-63)”.
3) Insert ENC/AVCS Chart CD-ROM into the CD/DVD-ROM drive.
4) Select [Sort] - [S-63(Offline)] in that order.
S-63 chart list will appear in several minutes.
Attention:
• Decoding of chart and checking of permission start.
This processing takes several minutes or more (30 minutes, for example) depending on the number of
chart license.
Select [Sort] - [S-57] in that order when importing S-57 chart.
2-16
6) Left-click the [OK] button.
Update of S-63 chart is started.
※When the [Cancel] button is left-clicked, check a chart display and accept updating from
[Navigation&Planning]
2-17
Left-clicking the [Log] button will show the update result.
[Log] button
Log window
Progress meter shows the progress of the update processing according to the
capacity of the chart files already processed.
2-18
7) Check that the update process is completed, and then, left-click the [Exit] button to exit Chart Portfolio.
Attention:
• If the Cell permit is expired, Charts are not able to update with “Error: Subscription license has
expired” message on Log window. Please register the valid Cell permit referring to “2.3
Updating Cell Permit (Only S-63)”.
• Please contact purchasing contractor or chart distributor to confirm the license agreement.
2-19
2.2.2 Updating AIO data
AIO data CD can be gotten if you request to your chart provider. AIO data will be updated every week same as
the AVCS update CD. (But in some software version, the AIO function is not available.)
2-20
5) Left-click the [OK] button.
Update of AIO data is started.
6) Check that the import process is completed, and then, left-click the [Exit] button to exit Chart Portfolio.
2-21
2.3 Updating Cell Permit (Only S-63)
When update Cell Permit, import Cell Permit referring to “2.1.2 Importing Cell Permit (Only S-63)”.
This is a sample.
2-22
2.4.2 Confirming expiry date
2-23
Attention:
When Auto Detect is performed on the day less than 30 days left before the expiry date, the following
dialog box is displayed and
“****(UpNo.X.Y) Warning: Subscription service will expire in less than 30 days. Contact your ENC
chart agent or distributor for a subscription renewal.”(**** indicates the chart name) is also
displayed in the Log viewer.
When Auto Detect is performed after the expiry date, the following dialog box is displayed and “****
(UpNo.X.Y) Error: Subscription license has expired.” (**** indicates the chart name) is also
displayed in the Log viewer.
2-24
2.4.3 Confirming SA Certificate File
1) Start the Chart Portfolio.
2) Select [Tool] - [Option] in that order to display the [Option] dialog box.
3) Click the [S-63/AVCS] tab and click the [Select of Certificate] button in the “SA Certificate” field to
display the [Select of SA Certificate] dialog box.
4) Confirm that the selected SA Certificate file conforms to the SA Certificate file of the Data Server of
charts that will be imported.
Confirm the SA
Certificate file.
2-25
If the selected SA Certificate file does not conform to the SA Certificate file of the Data Server of charts,
select the conformable one from the combo list on the [Select of SA Certificate] dialog box or, if the
conformable one does not exit in it, insert the chart CD into the CD drive to import the conformable SA
Certificate file.
Attention:
• ECDIS can use the charts published by more than one data server (PRIMAR, UKHO (AVCS),
Hydrographic and Oceanographic Department of Japan Coast Guard, etc.). It is necessary, however,
to import and select SA Certificate file to the system each time charts provided by a new data server
are used. Before importing the charts, for certification of ENC, import and select SA Certificate file
contained in Chart CD-ROM provided by the data server.
2-26
2.4.4 Confirming S-63 User Permit
1) Press the [PWR] key to turn on ECDIS.
2) After the [Startup] menu is displayed, move the cursor onto it and right-click to display the [Password]
dialog box.
3) Enter the four digits password “0000” and click the [OK] button to display the [User Maintenance Menu].
User Maintenance
Menu
2-27
4) Click the [Hardware Key Information] button to display the dialog box.
5) After confirming, click the [<< Hide] button to return to the [Startup] menu.
2-28
2.5 Confirming ENC/AVCS Chart Updating History
2.5.1 Confirming by Chart Portfolio
1) Start the Chart Portfolio.
2) Select [Sort] – [S-63(Offline)] in that order.
3) Double-click the “[S-63] system Chart” tab and open the “S-57” folder.
Then, the Latest Update day is displayed in the [S-63] System Chart list.
1
2
2-29
2.5.2 Confirming by Navigation & Planning
4) Right-click on the chart, then select [S-57/C-MAP/ARCS Information] from the context menu.
Then, the cross cursor changes to the box cursor ( ).
5) Rotate the trackball, point the cursor to the chart, and left-click the cursor.
Then, the “Information” panel opens according to the selected chart.
Confirm “Update history”.
•To close the panel, left-click the [Close] button.
2-30
2.6 Deleting ENC/AVCS Chart・AIO data
1) Start the Chart Portfolio.
2) Click [Sort] – [S-57] from the “Chart Portfolio” menu.
Select [Sort] - [S-63] in that order when importing S-63 chart.
Select [Sort] - [AIO] in that order when importing AIO data.
3) Click the “[S-57] System Chart” tab to display the imported S-57 charts.
The imported
Click “[S-57] System
S-57charts will be
Chart” tab.
displayed. Charts
are sorted and saved
in each folder.
2-31
5) Select from the displayed charts by the mouse cursor. Multiple charts can be selected by moving the cursor
while holding down the mouse left button.
The folder itself will also be deleted when all the charts in the folder are deleted. Then, the next folder is
automatically selected and the charts in the next folder will be listed.
2-32
8) Repeat the above procedure from (5) to (8) to delete the unnecessary S-57 charts.
When all the imported S-57 charts are deleted, no charts will be listed on “[S-57] System Chart.”
9) Click the [Exit] button.
2-33
2.7 Deleting Cell Permit (Only S-63)
Note:
• Please delete previous Cell permit as following procedures after changing in the contract detail.
• Deleting Cell permit clears all Cell permits of each data server (PRIMAR, UKHO (AVCS),
Hydrographic and Oceanographic Department of Japan Coast Guard, etc.).
• Imported charts are still able to show after deleting Cell permit.
3) Left-click the [S-63/AVCS] tab, and then, the [Select of Certificate...] button.
The “Option” dialog box opens.
2-34
2.8 Changing the Contract
Note:
• Please delete previous Cell permit as following procedures after changing in the contract detail.
• Deleting Cell permit clears all Cell permits of each data server (PRIMAR, UKHO (AVCS),
Hydrographic and Oceanographic Department of Japan Coast Guard, etc.).
• After delete previous Cell permit, import new Cell permit.
• Imported charts are still able to show after deleting Cell permit.
2-35
3. Using ARCS Chart
3.1 ARCS Chart
3.1.1 Checkup of ARCS Chart
Course of
Present date One month One month
(d) If ARCS chart has been displayed normally but will not be displayed from a certain point of
time, either of the following may be the cause.
• ARCS chart you have used was the trial version (available free of charge for 3 months).
• The details of the license agreement were changed.
Attention:
• For the details of the license agreement, contact purchasing contractor or chart
distributor.
3-1
3.2 Importing ARCS Chart
Before reading and writing of the file by using the USB storage, confirm that there
is not a computer virus in the USB storage.
Otherwise they may affect other equipments and may cause a malfunction.
Do not leave the USB Storage in the USB port after use.
Malfunctions may result.
Attention:
• If the received Chart permit files are “Backup gb.lcn” and “Backup gb.ncp”, rename them to “gb.lcn”
and “gb.ncp”. Without “gb.lcn” and “gb.ncp”, ARCS is not able to import correctly.
• Do NOT modify the data of Chart permit. With modified Chart permit, ARCS is not able to import
correctly.
3-2
5) The “Find file” panel opens.
6) Select [A:] (A drive) from the “Drive” combo box (a) in the “Find file” panel as shown below.
(c) (b)
(a)
8) Double-click the file name of ARCS license (such as “gb.ncp”) in the “File name” list box (c).
Attention:
•When ARCS Chart Permit is supplied in E-mail, save gb.lcn file and gb.ncp (or gb.scp) file
(ARCS Chart Permit) attached E-mail to the USB memory.Connect the USB memory and
select [F:] (F drive).
- Save only gb.lcn file and gb.ncp file to the USB memory.
-When gb.lcn file and gb.ncp (or gb.scp) file ares compressed, decompress the
compressed files, and then save to the USB memory.
3-3
9) Check the file name, and left-click the [OK] button.
The display returns to the “Import/Enter Chart Permit” panel.
Attention:
• After the import of ARCS Chart Permit is completed, Chart Portfolio prepares an ARCS index file.
While the file preparation is in progress, the [Exit] button of “Chart Portfolio” screen is in gray color
and disabled. Exit Chart Portfolio after the index file is completed. (It takes approximately 40 minutes
at the most.)
3-4
3.2.2 Importing ARCS Chart
Import ARCS chart according to the following procedures after confirming that Chart Permit has been imported.
If ARCS chart list is not displayed, left-click the [Auto Detect] button.
3-5
4) Left-click the [Import/Update] button.
Import of ARCS chart is started.
Left-clicking the [Log] button will show the import result.
[Log] window
Progress meter shows the progress of the import processing according to the number
of the chart files already processed.
3-6
5) Check that the import is completed, and then, left-click the [Exit] button to exit Chart Portfolio.
Attention:
• After the import of ARCS chart is completed, Chart Portfolio prepares an ARCS index file.
While the file preparation is in progress, the [Exit] button of “Chart Portfolio” screen is in
gray color and disabled.
Exit Chart Portfolio after the index file preparation is completed. (It takes approximately 40
minutes at the most.)
3-7
3.3 Updating ARCS Chart
1) Start the Chart Portfolio.
2) Insert ARCS chart CD-ROM into the CD/DVD drive.
3) Select [Sort] - [ARCS] in that order.
If ARCS chart list is not displayed, left-click the [Auto Detect] button.
3-8
4) Left-click the [Import/Update] button.
Update of ARCS chart is started.
Left-clicking of the [Log] button will show the update result.
[Log] window
3-9
5) Check that the update is completed, and then, left-click the [Exit] button to exit Chart Portfolio.
Attention:
• After the update of ARCS chart is completed, Chart Portfolio prepares an ARCS index file.
While the file preparation is in progress, the [Exit] button of “Chart Portfolio” screen is in
gray color and disabled.
Exit Chart Portfolio after the index file preparation is completed. (It takes approximately 40
minutes at the most.)
3-10
3.5 Confirming Chart Permit
3.5.1 Confirming the number of charts license
1) Start the Chart Portfolio.
2) Select [Tool] - [Option] in that order.
3) Left-click the [ARCS] tab in the “Option” panel to check the license information.
3-11
3.5.2 Confirming expiry date
1) Start the Chart Portfolio.
2) Select the [Sort] – [ARCS] in that order from the Chart Portfolio menu.
3) Click the “[ARCS] System Chart” tab, and click the folder under the “ARCS” folder.
Then, the imported charts are listed.
3-12
3.5.3 Confirming Chart Permit Information
3) In the “ARCS License Information” panel, the following license information is displayed.
Left-click the [Close] button to close the panel.
3-13
3.5.4 Confirming ARCS PIN No./User Permit
3.5.4.1 Confirming by Hardware Key Information
(1) Press the [PWR] key to turn on ECDIS.
(2) After the [Startup] menu is displayed, move the cursor onto it and right-click to display the [Password]
dialog box.
(3) Enter the four digits password “0000”, and click “OK” to display the [User Maintenance Menu].
User Maintenance
Menu
3-14
(4) Click the [Hardware Key Information] button to display the dialog box.
See the displayed “PIN” and the “User Permit” assigned to the unit.
(5) After confirming, click the [<< Hide] button to return to the [Startup] menu.
3-15
3.5.4.2 Confirming by ARCS PIN panel when Navigation & Planning starts
1) Click the [Navigation & Planning] button on the [Startup] menu. Then, the screen switches to the
[ARCS PIN] panel after a while. Confirm the displayed User Permit.
Attention:
The [ARCS PIN] panel will not be displayed after inputting the ARCS PIN.
To display again, ECDIS power needs to be turned off.
3-16
3.5.4.3 Confirming by Chart Portfolio
3) The [ARCS License Information] dialog box is displayed. See the imported “User Permit”.
User Permit
4) Click the [Close] button to close the [ARCS License Information] dialog box.
3-17
3.6 Confirming ARCS Chart Updating History
3.6.1 Confirming by Chart Portfolio
3-18
3.6.2 Confirming by Navigation & Planning
4) Right-click on the chart, then select [S-57/C-MAP/ARCS Information] from the context menu.
Then, the cross cursor changes to the box cursor ( ).
5) Rotate the trackball, point the cursor to the chart, and left-click the cursor.
Then, the “Information” panel opens according to the selected chart.
Confirm “File Issue Date”.
•To close the panel, left-click the [Close] button.
3-19
3.7 Deleting ARCS Chart
1) Start the Chart Portfolio.
2) Click [Sort] – [ARCS] from the “Chart Portfolio” menu.
3) Click the “[ARCS] System Chart” tab to display the imported ARCS charts.
The imported
ARCS charts will Click “[ARCS] System
Click a folder.
The charts saved in the
folder are displayed.
3-20
5) Select from the displayed charts by the mouse cursor. Multiple charts can be selected by moving the
cursor while holding down the mouse left button.
3-21
4. Using C-MAP Ed.3
Attention:
・Under upgrading CMAP Ed.3, the following items are not functioned. Thank you for your understanding.
- Relative Motion Mode / Course Up Azimuth Mode
- Chart Fix mode
- Manual Updating
- Running Chart Portfolio on Navigation & Planning
Dynamic Licensing is a subscription service agreement that provides an easy and user-friendly way to give
immediate access to ENC’s in a cost effective manner. With Dynamic Licensing, the user only has to:
• Inform Jeppesen Marine that Dynamic Licensing should be activated, and agree the terms and
conditions for using the service (no costs are incurred at this stage)
• Define a geographical limitation via one or more zones and areas
• Specify the maximum amount of money that can be spent on a yearly basis (the vessels credit limit)
The Dynamic Licensing system will grant the user access to ENC data up to the defined credit limit without the
need to obtain and enter any license codes. ENCs are registered as “used” when they have been loaded. This
counts for both the visual display of the chart and non-visual applications such as route checking. ENC’s will
normally be licensed for 3 months depending on what is allowed by the Hydrographic Office that has issued
the ENC’s.
Licenses will expire after the minimum allowed subscription period, which is normally 3 months. The ENC will
only be re-licensed if it is activated and used once more, ensuring that no costs are incurred for charts that are
not being used.
Reporting of the cells that have been used must be carried out on a regular basis. If not, the credit limit will be
emptied, and the access to the ENCs will be automatically blocked by the navigation system. The reporting
interval is set to maximum 2 weeks. Since most vessels are already today using the Online Update Service for
4-1
updating the charts, there is no extra work involved in reporting. Both Internet/HTTP and E-Mail can be used
for reporting.
Jeppesen Marine will be responsible for ensuring that all customers are reporting on a regular basis. Access
to the Dynamic Licensing services is controlled by Jeppesen Marine on the server side. Jeppesen Marine has
the option of terminating the subscription if the customer does not comply with the terms and conditions for
the service, resulting in blocked access.
The customer will receive a confirmation from Jeppesen Marine via e-mail or fax, stating that Dynamic
Licensing has been activated.
The service can then be activating by creating an Online Update request on the ECDIS and sending it to
Jeppesen Marine (updates@c-map.no). The response from the automated server will contain initialization
instructions that will be processed internally within the ECDIS. Dynamic Licensing will be available as soon as
the Online Update response has been correctly installed.
The user has the choice to turn Dynamic Licensing On or Off at any time.
4-2
4.2 C-MAP Ed.3 Chart
4.2.1 Checkup of C-MAP Ed.3 Chart (Static License)
Expiry date of license (e-Token)
The license has an expiry date.
(a) (b)
Attention:
• If the message (a) or (b) above is displayed, the license should be updated. Contact
a C-MAP dealer.
4-3
4.2.2 Checkup of C-MAP Ed.3 Chart (Dynamic License)
Expiry date of license (e-Token)
The datasets has an expiry date each self.
(1) Licensing by Credit
The credit is used (paid) and decrees to license any datasets.
The cost of dataset is different each other.
Visible Invisible
(2) Reporting
The customer using Dynamic Licensing must send report to Real Time Updating (RTU) service.
The reporting interval is set to maximum 2 weeks. If did not send the reporting until passing over 2 weeks,
C-Map Ed.3 charts is unable display charts.
Navigation & Planning display following notice everyday during use Dynamic License.
4-4
4.3 Importing C-MAP Ed.3 Chart
Attention:
・There are several types of CM-93/3 Electronic Chart Database such as World, ENC,
and Professional +, etc. The following shows how to import World as an example.
The same method is applied for importing ENC and Professional+ whose
4-5
5) Select DVD drive and Left-click [Search automatically] button, after displayed [Automatic database search].
6) Left-click [Check signature] button after displayed Database on right side of window.
Confirm database
7) Start checking digital signature, please wait until finish [Checking digital signature].
8) Left-click [OK] button after displayed [Result] dialog.
Start checking
4-6
10) Left-click [Yes] button.
11) Select folder of Database (e.g. Professional+) from [cm93_3] of [ECDIS_DATA] folder.
Select
4-7
14) Refrain same steps from 2) to 13) if import other databases.
4-8
4.3.2 Importing License
Before reading and writing of the file by using the USB storage, confirm that there
is not a computer virus in the USB storage.
Otherwise they may affect other equipments and may cause a malfunction.
Do not leave the USB Storage in the USB port after use.
Malfunctions may result.
4-9
2) Click [Licenses] tab.
3) Select database and Left-click [Import from file].
Select
4-10
4) Select [password.usr], and left-click the [Open (O)] button.
Select “password.usr”.
Attention:
•When License is supplied in E-mail, save password.usr file (License) attached E-mail to the
USB memory.Connect the USB memory and select USB drive.
- Save only password.usr file to the USB memory.
-When password.usr file is compressed, decompress the compressed file, and then save
to the USB memory.
4-11
6) Confirm installation result as follows.
4-12
4.3.2.2 Case of Dynamic License
Dynamic License must activate by importing answer file that got from A Real Time Updating (RTU) service via
an E-mail.
①Order ②Send
① Create a order file (e.g. JRC eT 30001.ord) by Chart Manager and save it to the USB memory.
② Attach the order file to e-mail, and send it to the RTU Server (E-mail:updates@c-map.no).
④Update ③Receive
③ The e-mail will be automatically treated at the RTU server and the updates will be generated and replied to
you. (e.g. u001x002.ans)
④ Save the answer file(s) to the USB memory and import the answer file for activation by Chart Manager.
E-mail: updates@c-map.no
4-13
1) Start [Chart Manager] from Startup menu.
4-14
4) Check on [All available zones] and Left-click [Save] button.
Check on
4-15
6) [Order file] was saved to USB memory, and Left-click [OK] button.
7) Attach the saved order file (JRC eT *****.ord) to e-mail, and send it to the RTU Server
(E-mail:updates@c-map.no).
The e-mail will be automatically treated at the RTU server and the updates will be generated and replied
to you. (e.g. u001x002.ans)
Attention:
・Check your number of e-mail from C-MAP(updates@c-map.no). One “*.ans” file is
attached with every e-mail.
・File name rule
uXXXxYYY.ans
YYY: number of files
XXX: file number
Ex:Four division
u001x004.ans
u002x004.ans
u003x004.ans
u004x004.ans
Attention:
・The update(s) file(s) must be saved in the root directory of USB memory.
9) Insert the update(s) file(s) USB memory into the USB Port.
4-16
10) Left click [Update from file] button.
4-17
13) Select [Dynamic Licensing] tab, and confirm increasing Credit Rest.
4-18
4.3.2.3 Confirming Chart Display
1) Left-click [ ] in the startup menu to start Navigation & Planning.
2) Move a cursor to the screen upside, and select [(6) Chart] - [(0) Setting] - [(1) S-57/C-MAP/ARCS...] in
that order
4-19
3) Left-click the [View Common] tab. in the “Chart Option” panel.
If the “World” check box is blank, check it.
[View 1] tab
4-20
4.4 Updating C-MAP Ed.3 Chart
4.4.1 Updating C-MAP Ed.3 Chart by CD (or DVD)
Attention:
・There are several types of CM-93/3 Electronic Chart Database such as World, ENC,
and Professional +, etc. The following shows how to import World as an example.
The same method is applied for importing ENC and Professional+ whose
instructions will be omitted as well.
4-21
3) Select [Database] tab and Left-click [Update database] button.
4) Start copying.
Confirm updated
4-22
4.4.2 Updating C-MAP Ed.3 Chart by RTU
A Real Time Updating (RTU) service updates the CM-93/3 chart database via an E-mail using a RTU server.
①Order ②Send
① Create an order file (e.g. JRC eT 30001.ord) by Chart Portfolio and save it to the floppy disk or USB memory.
② Attach the order file to e-mail, and send it to the RTU Server (E-mail:updates@c-map.no).
④Update ③Receive
③ The e-mail will be automatically treated at the RTU server and the updates will be generated and replied to
you. (e.g. u001x002.ans)
④ Save the update(s) file(s) to the floppy disk or CD-R/RW, USB memory and update the CM-93/3 chart
database by Chart Portfolio.
E-mail: updates@c-map.no
4-23
1) Start [Chart Manager] from Startup menu.
4-24
4) Check on [All available zones] and Left-click [Save] button.
Check on
4-25
6) Attach the saved order file (JRC eT *****.ord) to e-mail, and send it to the RTU Server
(E-mail:updates@c-map.no).
The e-mail will be automatically treated at the RTU server and the updates will be generated and replied
to you. (e.g. u001x002.ans)
Attention:
・Check your number of e-mail from C-MAP(updates@c-map.no). One “*.ans” file is
attached with every e-mail.
・File name rule
uXXXxYYY.ans
YYY: number of files
XXX: file number
Ex:Four division
u001x004.ans
u002x004.ans
u003x004.ans
u004x004.ans
Attention:
・The update(s) file(s) must be saved in the root directory of USB memory.
8) Insert the update(s) file(s) (CD-R/RW or USB memory) into the CD-R/RW drive or USB port.
4-26
9) Left click [Update from file] button after received answer file.
4-27
12) Confirm updated charts and Left-click [Close] button.
4-28
4.5 Reporting for Dynamic License
Attention:
・Customer have to send the reporting to Real Time Updating (RTU) service. The
reporting interval is set to maximum 2 weeks. If did not send the reporting until passing
over 2 weeks, C-Map Ed.3 charts is unable display charts.
2) Select [Dynamic Licensing] tab, and Confirm [Next Report Date] and [Non-reported datasets].
4-29
4.5.2 Report for Dynamic License
4-30
4.6 Confirming License
4.6.1 Case of Static License
1) Start [Chart Manager] from Startup menu.
4-31
4.6.2 Case of Dynamic License
4-32
4.7 Confirming Updates List
1) Start [Chart Manager] from Startup menu.
:Publisher
:Chart name
:Update unit
:Object
4-33
4) Left-click [Review updating log] button .
4-34
4.8 Deleting C-MAP Ed.3 Chart and License
In the case of a contract zone is changed when the license update at C-Map Ed.3,(Ex. The cases that it updates
for regular license registration from a trial license.) The expired license is also left on data, an expired message is
displayed at every Navigation & Planning start. In the following procedures, please delete a database for not to
display this message and delete and delete the license which expired, and register only a new license again.
4-35
4) Confirm deleting the database.
4-36
4.9 Confirming eToken Device
4.9.1 Confirming eToken Device
Remove
four screws.
4) When confirming eToken device, detach the cover by removing the screws fixed on the right and left of cover.
4-37
5) Dougle and eToken device are installed as follows.
eToken Device
Dongle
6) Confirm the eToken device is installed into the USB port, and also check the System ID of the installed
Key.
This is sample.
Do NOT remove the
eToken device.
4-38
4.9.2 Confirming System ID in Chart Manager
[User]
SystemID=JeT JRC 70005
UserKey=eToken *This is a sample data
4-39
5. Using ChartCo
5.1 ChartCo
By using ChartCo function, the following operation will be possible:
Importing and updating the chart data from Chart Manager PC to Navigation Workstation or Route Planning
System (connected with chart manager PC via LAN) and to ECDIS (connected with the Navigation Workstation or
Route Planning System via LAN)
NOTE:
For updating the chart data in the ChartCo, transfer the chart data to Navigation Workstation
from Chart Manager PC. For detail, refer to the Instruction Manual of ChartCo or “Reference
document 6 : ChartCo Operation Procedure” in this manual.
Flow
Step1: Downloading Chart Data in ChartCo and Sending Chart Data to Navigaition Workstation (or Route
Planning System)
(Refer to the Instruction Manual of ChartCo or “Reference document 6: ChartCo Operation
Procedure” in this manual.)
Step2: Getting Chart Data in Navigaition Workstation (or Route Planning System)
5-1
5.2 Getting Chart Data in ChartCo (Step1)
To download Chart Data in ChartCo and send Chart Data to Navigaition Workstation (or Route Planning
System), refer to the Instruction Manual of ChartCo or “Reference document 6 : ChartCo Operation
Procedure” in this manual.
5-2
5) Left-click the [Get New Data] button.
The following dialog box appears to indicate the charts are being gotten.
6) The following message appears when getting chart data is completed. Left-click the [OK] button.
7) Then the following dialog box appears to display the type and gotten date and time of the chart data.
Left-click the [Close] button.
5-3
5.3.2 Selecting Previous Chart Data
1) Start Chart Portfolio in Navigation Workstation (or Route Planning System).
2) Select [Chart]-[ChartCo].
Confirm a check mark is put in [ChartCo Online].
3) Select [Get chart from ChartCo].
Then, ChartCo Acquisition Application starts.
5-4
The list of chart data that was gotten in the past is displayed.
6) Select the chart to get and left-click the [OK] button. (Ex: 00004)
The following dialog appears to indicate the selected chart data is being gotten.
5-5
7) The following message appears when getting the chart data is completed.
Left-click the [OK] button.
8) Then the following dialog box appears to display the type and gotten date and time of the chart data.
Left-click the [Close] button.
5-6
5.4 Updating ENC Chart in NWS (RPS) (Step3)
5.4.1 Confirming NWS (RPS) Setting
1) Start Chart Portfolio in Navigation Workstation (or Route Planning System).
2) Select [Chart]-[ChartCo].
Confirm a check mark is put in [ChartCo Online].
NOTE:
Not select Q drive (CD/DVD-ROM drive).It is necesarry to import and select each data
server (PRIMAR STAVENGER、UKHO、Japan Hydrographic and Oceanographic
Department…etc).
ECDIS has a function that it can use the charts issued by more than two data servers.
Before importing the charts, it is necessary to import and select “SA Certificate file” which
is received from chart manager, because of authentication and certification for ENC.
5-7
3) Left-click the [S-63] tab, and then, the [Import of Certificate...] button.
The “Find file” panel opens.
4) Select [E:](E drive) from the “Drive” combo box (a) as shown below.
(When use Route Planning System, select [D:] (D drive).)
(b)
(c)
(a)
NOTE:
Not select Q drive (CD/DVD-ROM drive).
5-8
7) Check the file name, and left-click the [OK] button.
The “Import of SA Certificate” panel opens.
5-9
9) As the message box appears, left-click the [OK] button to close the box.
Import procedure is completed.
5-10
5.4.4 Updating ENC Chart
1) Start Chart Portfolio in Navigation Workstation (or Route Planning System).
2) Select [Sort] - [S-63(Offline)] in that order.
S-63 chart list will appear in several minutes.
Note:
• Decoding of chart and checking of permission start.
This processing takes several minutes or more (30 minutes, for example) depending on the
number of chart license.
[Import/Update] button
5-11
4) After the following dialog box appears, left-click the [OK] button.
5-12
Left-clicking the [Log] button will show the update result.
[Log]button
Update result
5-13
5) Check that the update process is completed, and then, left-click the [Exit] button to exit Chart Portfolio.
Note:
• If the Cell permit is expired, Charts are not able to update with “Error: Subscription license
has expired” message on Log window. Please register the valid Cell permit referring to
“2.1.2 Importing Cell Permit (Only S-63)”.
• Please contact purchasing contractor or chart distributor to confirm the license agreement.
5-14
5.5 Updating ENC Chart in ECDIS (Step4)
Before updating ENC Chart in ECDIS, get new Chart Data in Navigation Workstation (or Route Planning
System).
5-15
3) Left-click the [S-63] tab, and then, the [Import of Certificate...] button.
The “Find file” panel opens.
4) Select Navigation Workstation (ex. NavWS) from the “Drive” combo box (a) as shown below.
(When use Route Planning System, select RPS.)
(b)
(c)
(a)
NOTE:
Not select Q drive (CD/DVD-ROM drive).
5-16
7) Check the file name, and left-click the [OK] button.
The “Import of SA Certificate” panel opens.
5-17
9) As the message box appears, left-click the [OK] button to close the box.
Import procedure is completed.
5-18
5.5.4 Updating ENC Chart
1) Start Chart Portfolio in ECDIS.
2) Select [Sort] - [S-63(Offline)] in that order.
S-63 chart list will appear in several minutes.
Note:
• Decoding of chart and checking of permission start.
This processing takes several minutes or more (30 minutes, for example) depending on the
number of chart license.
3) Left-click the [Import/Update] button.
5-19
4) After the following dialog box appears, left-click the [OK] button.
5-20
Left-clicking the [Log] button will show the update result.
[Log]button
Update result
5-21
5) Check that the update process is completed, and then, left-click the [Exit] button to exit Chart Portfolio.
Note:
• If the Cell permit is expired, Charts are not able to update with “Error: Subscription license
has expired” message on Log window. Please register the valid Cell permit referring to
“2.1.2 Importing Cell Permit (Only S-63)”.
• Please contact purchasing contractor or chart distributor to confirm the license agreement.
5-22
6. Troubleshooting
Attention:
The symptoms mentioned in the section ‘Symptom/Cause/Countermeasure’ may occur in connection
with chart importing/updating. The symptoms are NOT ECDIS malfunctions.
1. Symptom/Cause/Countermeasure (common)
Symptom Cause Countermeasure
6-1
2. Symptom/Cause/Countermeasure (S-57/63)
Symptom Cause Countermeasure
Select S-57/S-63 chart (Select [Menu] -
[Chart] - [Option] -
S-57/S-63 chart is not displayed. S-57/S-63 chart is not selected. [S-57/C-MAP/ARCS]).
Refer to “Reference Document 5:
Method for Selecting Chart”.
Even if the latest Cell permit is Register the latest Cell permit after
registered, “Error: Subscription license Expired Cell permits are remaindered. deleting Cell permit. See “2.7 Deleting
has expired.” message is appeared. Cell Permit (Only S-63)”.
6-2
3. Symptom/Cause/Countermeasure (ARCS)
Symptom Cause Countermeasure
Chart is imported when the term of
validity of ARCS has expired. Register the latest Chart Permit within the
expiration date, and then import ARCS chart.
Expired Permit has been registered.
ECDIS has detected the alarm Check the details of the alarm.
Alarm occurs frequently while ARCS
information regarding ARCS chart See “Reference Document 2: Alarm
chart is displayed.
itself and displayed the alarm. Information of ARCS Chart” .
File name of Chart permit is wrong. Import the Chart permit after renaming to
E.g. Backup gb.lcn / Backup gb.ncp gb.lcn / gb.ncp. (*1)
Even if the latest permit is registered, Previous licensed charts are within a
Register the latest Chart permit again.
expired license message is appeared. month after expired date.
(*1): File name of Chart permits are gb.lcn / gb.ncp (for Navigation Service) or gb.lcn / gb.scp (for Skipper Service).
6-3
4. Symptom/Cause/Countermeasure (C-MAP Ed.3)
Symptom Cause Countermeasure
6-4
Symptom Cause Countermeasure
Connect chart distributor to request computerized
The license is send by FAX.
license.
C-MAP Ed.3: No license License has not yet been Register the license in Chart Portfolio.
installed. installed. Refer to “4.2.2 Importing License”
6-5
5. Symptom/Cause/Countermeasure (ChartCo)
現象 原因 対策
Get Chart from ChartCo is inactive Chart Data is not sended from
Send Chart Data from Chart Manager PC to Navigation
in Chart Portfolio of Navigation Chart Manager PC to
Workstation or Route Planning System.
Workstation or Route Planning Navigation Workstation or
Refer to ChartCo Instruction manual.
System. Route Planning System.
6-6
Reference Document 1: Alarm Information of S-57/S63 Chart
This section explains the details of the alarm information that may appear inside the log window of Chart Portfolio while
S-57/S-63 chart is imported/updated on ECDIS.
error(0x00000003)
File extension of Chart CD is
3 error:File
abnormality.
extension
error(0x00000005)
5 error:Data not There is not specification data. It is a fatal error for Chart CD. Neither import nor
found update is possible for this Chart CD.
Clean the CD-ROM, and then, perform import
error(0x00000006) File data structure of Chart CD procedure again. If the error persists, contact the
6 distributor of the chart for the measures to take.
error:Data error is abnormal.
error(0x00000009)
File structure in Chart CD is
9 error: Data
abnormal.
structure
6-7
When Base CD is used - continued:
No. Error message Cause Countermeasure
error(0x0000000B) Internal memory address
11 error:Instruction (instruction section) is
Address abnormal.
error(0x0000000C) Internal memory offset
12 error:Instruction (instruction section) is
offset abnormal. Contact the retailer of the chart for the measures to
error(0x0000000D) take.
Memory allocation is faulty
13 error:PL Rule
(PL rule section).
Memory
error(0x0000000E)
Data acquisition is faulty (PL
14 error:PL Rule
rule section).
Information
error(0x0000000F)
Acquisition of attribute data of Contact the retailer of the chart for the measures to
15 error:Attribute
chart object is faulty. take.
Information
error(0x00000011)
Acquisition of chart object
17 error:Object Class
information is faulty.
get
Contact the retailer of the chart for the measures to
error(0x00000012) take.
18 error: Directory File path is abnormal.
create
error(0x00000014)
Link of chart area object in
20 error:Area Object It is a fatal error for Chart CD. Neither import nor
Chart CD is abnormal.
Link update is possible for this Chart CD.
Clean the CD-ROM, and then, perform import
error(0x00000015)
Link of line object in Chart procedure again. If the error persists, contact the
21 error: Line Object
CD is abnormal. distributor of the chart for the measures to take.
Link
error(0x00000016)
Chart object in Chart CD is
22 error: Object
out of boundary.
outside range
6-8
When Update CD is used:
No. Error message Cause Countermeasure
error(0x0000000C)
Acquisition of warning file of
12 error:Warning Cell
SENC is faulty.
data
6-9
When Update CD is used - continued:
No. Error message Cause Countermeasure
error(0x0000000D)
Sequence of update number of
13 error:Sequential
Update CD is abnormal.
number error
error(0x00000013)
Memory allocation is faulty
19 error:PL Rule
(PL rule section). Contact the retailer of the chart for the measures to
Memory
take.
error(0x00000014)
Data acquisition is faulty (PL
20 error:PL Rule
rule section).
Information
error(0x00000015)
21 error:Enc File Writing of SENC file is faulty.
write
error(0x00000016)
Acquisition of chart object
22 error:Object Class
information is faulty.
get
6-10
When Update CD is used - continued:
No. Error message Cause Countermeasure
error(0x00000017)
Data structure of Update CD is
23 error:Data
abnormal.
structure
Data structure of Update CD
error(0x00000018)
24 (deletion of FFPC field) is
error:FFPC delete
abnormal.
Data structure of Update CD
error(0x00000019)
25 (modification of FFPC field) is
error:FFPC edit
abnormal.
Data structure of Update CD
error(0x0000001A)
26 (deletion of FSPC field) is
error:FSPC delete
abnormal.
Data structure of Update CD
error(0x0000001B)
27 (modification of FSPC field) is
error:FSPC edit
abnormal. It is a fatal error for Update CD. This chart cannot be
Data structure of Update CD updated.
error(0x0000001C) Clean the CD-ROM, and then, perform import
28 (deletion of VRPC field) is
error:VRPC delete procedure again. If the error persists, contact the
abnormal.
distributor of the chart for the measures to take.
Data structure of Update CD
error(0x0000001D)
29 (modification of VRPC field)
error:VRPC edit
is abnormal.
Data structure of Update CD
error(0x0000001E)
30 (deletion of SGCC field) is
error:SGCC delete
abnormal.
Data structure of Update CD
error(0x0000001F)
31 (modification of SGCC field)
error:SGCC edit
is abnormal.
error(0x00000020)
Data structure of Update CD
32 error:Coordinate
(coordinate type) is abnormal.
Type
error(0x00000021)
Contact the retailer of the chart for the measures to
33 error:Directory File path is abnormal.
take.
create
6-11
When Update CD is used - continued:
No. Error message Cause Countermeasure
error(0x00000022) Topology of chart object in It is a fatal error for Update CD. This chart cannot be
34
error:Topology Update CD is abnormal. updated.
Clean the CD-ROM, and then, perform import
error(0x00000023) Link of chart area object in procedure again. If the error persists, contact the
35 distributor of the chart for the measures to take.
Area Object Link Update CD is abnormal.
6-12
Reference Document 2: Alarm Information of ARCS Chart
This document provides a notice about alarm messages displayed on ECDIS when opening ARCS chart.
When ARCS chart is displayed on ECDIS, chart-related alarms may occur frequently. It is obligated to display
these alarms on ECDIS, and such frequent occurrence of the alarms is not the result of a malfunction of ECDIS.
JRC’s ECDIS is designed to read the chart and permit information of ARCS and display such alarm information.
ARCS03 Chart Chart#. Update information Import the latest Chart CD and Update
relates to a newer version of the chart. CD. The chart version of Update CD is When importing chart
3
Please load the chart CD that contains different from the version of imported /Chart Portfolio.
Chart# with an issue date of RCID. chart.
ARCS04 Chart Chart#. The chart data Import the latest Chart CD and Update
already incorporates this update CD. The data contained in the Update When importing chart
4
information. Please load the latest update CD inserted have already been /Chart Portfolio.
CD. imported.
6-13
Alarms that appear when displaying ARCS chart - continued
Timing of
No. Error Message Countermeasure occurrence/Display
position
When displaying
ARCS08 Warning - License expired in less Contact your ARCS agent to renew the chart
8 than one month. Please contact your ARCS license, as it will expire in less than one (Navigator Service
agent for a license renewal. month. chart only) / Dialog
box.
When displaying
ARCS09 Chart Chart#. Warning - License
Contact your ARCS agent to renew the chart
expired. The displayed chart may not be up
9 license. The license (Chart Permit) (Navigator Service
to date. Contact your Agent to arrange for a
expired within the past month. chart only) / Dialog
license renewal.
box.
ARCS11 Chart Chart#. The loaded version Import the latest version of Chart When displaying
of this chart is too old to be used with the Permit and Chart CD. ARCS charts chart
11 license. Please load a more recent version cannot be displayed because the (Navigator Service
of the chart. Chart version is Enc#, Permit Encryption Number of chart is different chart only) / Dialog
version is Penc#. from the Permitted Encryption Number. box.
6-14
Alarms that appear when displaying ARCS chart - continued
Timing of
No. Error Message Countermeasure occurrence/Display
position
6-15
Alarms that appear when displaying ARCS chart - continued
Timing of
No. Error Message Countermeasure occurrence/Display
position
6-16
Reference Document 3: Method for Confirming Path
1) Click the [Chart Portfolio] button on the [Startup] menu to start the Chart Portfolio.
2) Select [Tool] – [Option] in that order to display the [Option] dialog box.
3) Click the [Advanced] tab and then the [Advanced Option] button to display the [Advanced Option] dialog box.
4) Confirm the each chart Path destination in [Source Chart Path] is “Q:”.
If it is not “Q:”, click the […] button to change it into “Q.”
(Only importing/updating Chart from CD/DVD)
6-17
When update chart from ChartCo, comfirm the following path
Navigation Workstation
Path
S-57/S-63 (Offline) E:/ECDIS_Chart/S57
ARCS E:/ECDIS_Chart/ARCS
ChartCo Online E:/ECDIS_Chart
Path
S-57/S-63(Offline) D:/ECDIS_Chart/S57
ARCS D:/ECDIS_Chart/ARCS
ChartCo Online D:/ECDIS_Chart
6-18
ECDIS
Path
S-57/S-63(Offline) //192.168.60.156/ECDIS_Chart/S57
ARCS //192.168.60.156:/ECDIS_Chart/ARCS
ChartCo Online //192.168.60.156/ECDIS_Chart
6-19
Reference Document 4: Method for Cleaning by the lens
This is sample.
2) After the [Startup] menu is displayed, move the cursor onto it and right-click to display the [Password] dialog box.
Enter the four digits password “0000” and click the [OK] button to display the [User Maintenance Menu].
6-20
3) Click the [CD Cleaner] button. Then, the dialog box is displayed and the cleaning starts.
To stop cleaning, click the [OK] button. Perform the cleaning for a few minutes.
6-21
Reference Document 5: Method for Selecting Chart
6-22
5) Click the [View1] tab, and put a check mark in using chart.
6-23
Attention:
If the ARCS PIN is not inputted on the [ARCS PIN] panel and the [Cancel] is selected, the “ARCS” in
the [Chart Option] will be invalid and cannot be selected. Make sure to input the ARCS PIN on the
[ARCS PIN] panel to display the ARCS Charts.
6-24
Reference Document 6: ChartCo Operation Procedure
This document describes the procedure for getting the chart data from Chart Manger PC.
6-25
3) Select “Navigation.”
6-26
5) Left-click “New Updates.”
6-27
8) Select “Main ECDIS” and then left-click “Edit.”
6-28
10) Select ‘f’ as the Path. (“f” is assigned to the ‘ChartCo’ Folder in JRC Navigation Workstation.)
6-29
12) Left-click the [Close] button. Then, left-click the [Transfer To ECDIS] button.
6-30
Reference Document 7: About Chart Manager for C-Map
This document describes functions included in Chart Manager for C-Map.
Databases Tab
(2)
(3)
(4)
(5)
(6) (1)
(7)
(8)
(1) All registered databases are displayed in the Registered databases list. Columns in the list are:
• Default –
• Database – The database name.
• # – The database issue number. The higher the database issue number, the later is its release date and
more up-to-date data it contains.
• Release – Release date of the database.
• Path – Path to the database location.
Besides changing a database priority and adding databases to the view or deleting them from the view, the
following operations with databases are possible:
6-31
(6) Check signature
This operation checks integrity of a selected database (all data are correct).
Licenses Tab
(1)
(3)
(4)
(5)
(2)
(6)
6-32
Updates Tab
(1)
(3)
(4)
(5)
(2)
(6)
(7)
:Publisher
:Chart name
:Update unit
:Object
6-33
Apply update file that recieved via E-mail.
Apply dynamic license that recieved via E-mail.
6-34
Dynamic Licensing Tab
(1)
(2)
(6)
(3)
(7)
(4)
(5)
(8) (9)
(5) Refresh
Refresh Next Report / Confirmation Date.
The list of datasets that were viewed but are not reported yet (names and date of first use).
6-35
Network Config Tab
(2)
6-36
System Info Tab
(1)
(2)
(3)
(1) System ID
Show eToken ID.
6-37
For further information, contact:
アスベストは使用しておりません
Not use the asbestos Since 1915
URL http://www.jrc.co.jp/