MOC Installation of Cable Tray and Trunking

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 23

MOC HQ IN DGDA

(KINGDOM OF SAUDI ARABIA)

Job Title: Risk Assessment for Installation of Cable Tray and Trunking for Ministry of Culture Head Quarter Design and Build
(Fit-out) Project.

Activity Prepared by: Amr Abouhashem (HSE Deputy Manager)

Reviewed by: Eng. Fetouh Reda (HSE Manager)

Approved by: Eng. Mohamed Fawzy (Project Manager)

Table 3: Risk Assessment Matrix


SEVERITY LIKELIHOOD OF RISK
OF RISK 1 2 3 4 5
1 1 2 3 4 5
2 2 4 6 8 10
3 3 6 9 12 15
4 4 8 12 16 20
5 5 10 15 20 25
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

INITIAL RESIDUA
Who might RISK L RISK
No ACTIVITY ASPECT/HAZARD PREVENTATIVE CONTROL MEASURES
be harmed
L S R L S R

• Lack of • Maintained coordination with construction team before


Supervision proceeding to work.
• Incompetent • Pre-inspection of the site condition to ensure if it’s ready to
workers commence work.
• No proper •Arrangement and provision for the required tools, equipment and
access working platform required for the job.
Involved
• Lack of • Obtain permit to work prior to the activity.
Preparation of the workers, and
1 information 2 5 10 • Toolbox Talk must be conducted before the activity starts. 1 2 2
activity other
regarding the • Designate workers according to their job description.
contractors
activity •Supervisors must be competent and experienced to the task
on site.
• No emergency assigned.

procedure •Supervisors should have valid third party training / trade test.

• Lack of • Isolate the area by providing barriers, signboards and warning

Communication lights

/Coordination • Safe means of access and egress must be provided and

• Improper maintained.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• manual • Supervisors/Engineers/Foreman must discuss the emergency


handling procedure in case of unwanted event.
• Provide welfare facilities and first aid kit in the area.
• Ensure proper postures are adopted in manual handling loads
through appropriate training and supervision.
• Split the load if practicable to make it lighter
• Asses the capabilities of the employees concerned and assign
suitable manual handling operations to them accordingly
• Appropriate, close supervision must be implanted and
monitoring carefully the progress
• Pre-construction meeting should be held and carried out,
attended by engineers, supervisors and safety officers.
•Established emergency preparedness procedure and ensure it is
well communicated and drills conducted as required.
• All drivers/ operators have valid Egyptian driving licenses
• Working near
Involved appropriate for type of vehicles/ equipment being driven.
form the
workers, • Daily Task briefing to the entire relevant work force and sign the
excavation edge.
Visitors and attendance sheet prior commencing the work.
2 Traffic Management • Struck by 3 5 15 1 2 2
other • Concrete truck mixers should not come closer than 2.0 meters
vehicles.
contractors from the edge of excavation.
• Falling inside
on site. • Excavation area should be properly barricaded and appropriate
excavation.
safety warning signs should be provided.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• Collision • Trained & Certified driver, Flag man & Banks man should be
between trucks used with equipment all the time to assist the drivers/operators
and when there is movement of mobile plants/machineries, especially
equipment’s. while reversing.
• Unskilled • Implement one-way at site suing delineating means such as
drivers. traffic cones or plastic barriers etc.
• Reversing • Control Enter and Egress by security guard all the time.
vehicles. • Ensure the flagger/spotter available all the time to guide trucks
• Enter and during entry and egress from the site.
Egress. • It is recommended to avoid entering and egress trucks during
rush hours.
• Incompetent •Driver must have a valid driving license and vehicle registration.
driver / •Driver should be fit to work and not under drowsy medication.
personnel •Pre-visual inspection of vehicle before driving.
Driver,
• Under •Always check all safety devices and warning systems are
Involved
medication functioning properly.
Transportation of workers, and
3 • Unfit driver 3 5 15 •Regular maintenance of the vehicle. 1 2 2
Materials / Equipment other
• Improper •Ensure driver are well brief with the destination location and its
contractors
posture while governing traffic and safety rules.
on site.
driving •Prohibition of using mobile phone while driving.

• Lack of •No smoking inside the vehicle or while driving.

Maintenance
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• Unfamiliar w/ •In case of transporting flammable hazardous substances,


construction transporting section in MSDS should be strictly followed.
site or route •Follow site and Egyptian traffic rules and regulation.
• Use of Mobile •Secure the material with correct and stable strap.
phones while •Ensure the materials to be transported is within the vehicle’s load
driving capacity.
• Flammable •Weather forecast and condition shall be take into consideration
substance when driving or transporting materials.
• Smoking •Ensure that trucks and vehicles don’t exude thick harmful smoke

• Poor behaviour than can result to health illness and air pollution.

• Over speeding •Maintaining thicker foam padding on the driver car seat to

• Overturning minimize the whole body vibration impact and sustaining car

• Unsecured maintenance.

materials •Following the mandatory PPE inside the site destination.

• Overloading of
materials
• Inclement
weather
• Vibration
• Smoke belching
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• Driving license • Always check that all safety devices and warning systems are
• Improper functioning properly.
manual • Do not operate pick up if any safety devices and warning system
handling is faulty.
• Limited • Barricade the area and use tag line
manpower • Ensure competent pickup driver
• Movement of Involved • Ensure proper manual lifting techniques to be carried out.
vehicle workers, and •Use of mechanical aid.
Loading /
4 • Fall of loads other 2 5 10 • Route of load transfer to be free of personnel from below. 1 2 2
unloading of materials
/materials contractors • Only competent rigger/signalman to give the signal to the driver.

• Struck by load/ on site. • Ensure driver and signal man has clear communication.

vehicle • Ensure that materials to be unload / load are stacked in even

• Obstructed ground or level.

access •Clear access from any obstruction.

• Heavy materials •Unload /load materials only in designated area.

• Sharp Edges •Use of safety gloves.

• Uneven ground
Involved •A competent and knowledgeable storekeeper (s) should be
• Lack of
Storage of Materials/ workers, and designated.
knowledge
5 Equipment on site other 2 5 10 •Systematic material / equipment arrangement must be in place. 1 2 2
• Incompetent
contractors •Quantities and elevation of materials on site shall be kept to an
person
on site. absolute minimum and secure all loose materials.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• Improper • Safe storage of plant, materials and equipment should be stored


storage in designated location only.
• Over stacking of • Palletised loads should not exceed two pallets.
materials • Storage of cable trunks and trays should be barricaded.
• Loose material • Practice safe manual handling techniques.
• No stopper •Use of mechanical aid as necessary.
/wedge • Keep the combustible materials to minimum quantities to

• Sharp edges prevent fire hazards.

• Accumulation of •Strictly implement and adhere no smoking policy.

Combustible / •All flammable materials storage areas will be located at least 20m

Flammable away from other structures, areas where combustible materials

materials are stored and areas where sources of ignition are found.

• Source of •Updated register and inventory of chemicals and other hazardous

ignition substance and its MSDS / COSHH assessment should be readily

• Heavy materials available in the store and job location.

• Sharp edges •Content of MSDS shall be effectively communicated to all

• Loose materials personnel.

• Congested area •Strictly adheres MSDS requirement.

• Obstructed •Suitable and adequate fire fighting equipment must be in place

access and keep visible and unobstructed.


•Emergency contact numbers and procedure should be posted
inside the store.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• Obstructed fire •Emergency drills to be conducted quarterly or as required by .


fighting •Storekeeper (s) must be trained to use fire extinguishers.
equipment •Fire fighting safety refresher training should be given to all
• Poor personnel periodically.
housekeeping •Fire hazards and risk associated to store management shall be
• Poor communicated to all personnel.
illumination & •Provision of sufficient lighting and ventilation.
Ventilation •Ensure no materials / equipment will obstruct the access and
• No Emergency egress.
Procedure •Removal of redundant material / equipment at site to prevent
Arrangement congestion.

• No PPE •Regular housekeeping should be carried out to maintain the


orderliness of the store.
•Regular and random inspection shall be carried out in
collaboration with store manager /keeper and safety personnel.
•Correct labelling materials and warning / caution signage.
• Demarcation of access and egress routes by posting arrow
signage.
•Use of mandatory and additional personal protective equipment.
Lifting Operations - Involved • Crane has valid 3rd party certificate.
• Incompetent
6 using workers, and 4 5 20 • Qualified, competent, and authorised crane operator. 1 3 3
person
other • Qualified, competent, and authorised Rigger.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

cranes • No maintenance contractors • Valid 3rd party lifting certificate for all lifting equipment / gears.
/inspection on site. • Valid 3rd party certificate for crane lifting supervisor.
• Incorrect use • Valid 3rd party certificate for crane operator and Egyptian’s
• Lack of accurate driving license.
information • Valid 3rd party certificate for rigger.
about the load • Approved lifting plan in place prior to works commencing as
characteristics. required.
• Unstable • Appropriate permits in place (where required) prior to works
ground where commencing.
mobile cranes • The crane shall have a fully operational automatic safe working
are used. load • indicator, and over wind protection.

• Poor weather • Trained, competent and authorised flagman to be used where

conditions. loads are to be moved by mobile cranes

• Poor slinging of • Ensure STARRT and/or task briefing are discussed with the work

the load group prior to works commencing.

• Fall of materials. • Qualified, Competent and Authorised Lifting Coordinator present

• Electrical shock during lifting activity.

or electrocution. • Clear means of communication to be always provided during

• Poor lifting activities, i.e. two-way radio if required.

communication • Area around the lifting operation/activity is barricaded from

s with crane unauthorized entry and sign posted.


MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

operator and • Daily inspections of Crane and lifting equipment by qualified,


rigger(s). competent, and authorised persons. Any faults identified are to be
• Production immediately resolved prior to works commencing.
pressure to get • Ensure that the crane is located on solid level ground and that
the job done on the outriggers and spreader plates are fully deployed.
time. • Loads never to be lifted over persons.
• Trapped • Tag line to be always used with loads.
between the • Provide alternative safe access if pedestrian access routes are
crane and fixed within the lifting activities area.
structures. • Crane shall be positioned so that there is a min of 600mm
distance between it and any fixed structure to prevent any person
becoming trapped.
• Overhead power lines - maintain a safe clearance between
energized power lines and the crane and its load. Where
avoidance of working next to power lines cannot occur de-
energize and visibly ground electrical distribution and
transmission lines prior to works commencing.
• No overloading and overriding of Safety Alarm devices
• Lifting equipment and gear shall only be used for its intended
purpose.
• Crane operators, riggers, lifting supervisors and helpers shall
work at a pace that is suited to their skills and capabilities, there
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

shall be no interference from any party and in no way shall they be


placed under any undue pressure to complete the task within an
unreasonable time frame.
• Lifting operation shall be suspended if wind speed reach 25
Knots.
• No supervision • Toolbox talks and training should be conducted to the operatives
• Lack of training prior to start the task.
• Limited •Supervision is required.
manpower • Adopt appropriate posture when handling and carrying
• Improper equipment and materials.
Involved
Posture • Alternating the use of hands - Picking up left-then right handed.
workers, and
Manual handling of • Unfit workers • Designating adequate number of manpower to do the manual
7 other 2 5 10 1 2 2
materials • Heavy load handling. Use of team-lift technique if applicable.
contractors
• Improper lifting •Select worker who is fit to do the task.
on site.
of load •Rotation of work.

• Sharp edges • Use of mechanical aid if possible.

• Obstructed • Use of suitable hand gloves.

access •Provision of adequate lighting.

• Insufficient light •Clear access and walkways.

Erection and • Incompetent Scaffold •Any person erecting a mobile tower must be competent, having
8 Dismantling of mobile personnel Erector, 3 5 15 received adequate training or, if not fully competent, be under the 1 2 2
scaffolding • Lack of training Scaffold supervision of an experienced and competent person.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• Unauthorised Inspector •Scaffold inspector should possess valid third party training
modification and other certificate from approved training provider.
/erection contractors •Scaffolding components must be checked if free from any defects
/dismantling on site. and ensure that they are all from the same manufacturer/supplier
• Substandard or the same type of tower before erection.
scaffolding •The tower must never be moved by:
components (a) towing it with a vehicle
• Damage (b) a person who is on the platform pulling the scaffold along
scaffolding parts using an adjacent structure.
• Loose / falling •Stabilisers is required if an aluminium tower is to have a working
objects platform higher than 3 metres above ground level.

• Use of •Mobile scaffolding shall be inspected by scaffolding inspector and

incomplete tagged (green) prior to use.

scaffolding •Incomplete scaffolds will be tagged red and will be forbidden to

• High wind be used.

• Uneven ground •Weekly scaffolding inspection shall be carried out by inspector.

• Contact with •Scaff tag must be completely filled with its required information.

electricity •Load capacity of scaffold shall be clearly marked in the scaffolds.

• No PPE • Scaffolding components must be from approved vendor list with


valid third party certificate.
•Removal of damage components from the site.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

•Components should be free from any weld defects, bends,


distortion or corrosion that may affect the safe functioning of the
items.
•Mobile scaffold must be suitable for the job in hand and properly
maintained.
•Cease external mobile scaffold works, if the wind reaches a speed
of 17 miles per hour.
•If the wind speed is likely to reach 40.23 km/h, the tower should
be tied-in to a rigid structure.
•If there is a possibility of the wind reaching speeds approaching
or in excess of 64.37 km/h, the tower should be dismantled.
•Provision of Tool bags or belts while erecting the scaffolding.
•Alteration of scaffolds must be in line with supplier’s specification
/ manual.
•Erect and position the scaffolds in level surface / ground
•Mobile scaffold which is made from aluminium material must be
keep distance of minimum 1.5 meter away from any electrical
source such as distribution panel board.
•Cables should not be in direct contact with the aluminium
scaffold or used cable hangers.
•Castor wheel must be always on lock mode.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

•Use of mandatory and additional required PPE such as helmet


gloves and full body harness.
•Wearing of full body harness within / minimum of 2 meter height.
•The wearer must be trained in fitting and adjusting the harness
and selecting the appropriate lanyard and a positive anchorage.
•Warning and caution signage of ongoing erection / dismantling
works should be in place.
•Barricades must be in place and access of personnel should be
prohibited during erection and dismantling works.
•Approved should be discussed through a pre-construction
meeting with the presence of construction team and safety
• Lack of training
department.
• Lack of
•Established a working at height rescue procedure and availability
Supervision
Involved of rescue equipment.
• No Ladder /
workers, and •Emergency response team shall be trained to use the working at
Working at height using Scaffolds
9 other 4 5 20 height rescue equipment. 1 3 3
ladder and scaffolding inspection
contractors •Supervisors shall possess a valid third party training in working at
• Loose materials /
on site. height.
debris
•Close supervision is highly required.
• Falling objects
•Job performers must receive a formal training in working at
• Using
height and complete instruction and information for the task to
incomplete or
be carried out.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

damage ladder / •A prestart briefing / tool box talk should be imparted to the
scaffolding operatives prior to commence work on a daily basis.
• Unauthorised •Ensure that the working platform to be used is complete, safe to
modification of use and intended for the job.
scaffolds •Ensure the competency of scaffolding erector / inspector
• Uneven surface /supervisor.
• No PPE •Only trained operatives will erect, alter or dismantle Scaffold.
•Scaffolding should be inspected weekly by a competent
inspector.
•Only green tagged scaffolding is allowed to use at site.
•Incomplete scaffolding will be tagged red and prohibited to use.
•Inspection shall be recorded and readily available upon request.
•Tools and equipment to be use shall be kept minimum 1.5 meter
away from the edge of the scaffolding.
•Loose materials should be secured and protected by means of toe
boards and safety nets as required.
•SWL / capacity of scaffolding should not be exceeded and will be
clearly visible.
•Cables will be hang and suspended by using cable hanger and
stands and avoid direct contact with the scaffolding.
•Scaffolding shall not be move while in use or there is a worker on
top of the platform.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

•Provide barriers and warning signage around work area.


• Persons not to lean over handrails.
• Access points such as trap doors will be kept shut while workers
are on the platform. Access will be by a fixed internal ladder.
• Ensure that full body harness is provided and proper usage is
communicated to the operatives.
•Wearing of full body harness within / minimum of 2 meter height.
•The wearer must be trained in fitting and adjusting the harness
and selecting the appropriate lanyard and a positive anchorage.
•Full body harness must be inspected and color coded on a
monthly basis by a competent person and pre-visual inspection
before use.
• Ladder must extend 1m beyond platform, at 75° degree angle or
4:1 height to base ratio.
•Always maintain three points of contact. That means two hands
and one foot or two feet and one hand on the ladder at all times.
Put both hands firmly on the rungs before stepping onto a ladder.
• All ladders must be properly tied (not by stiles) to a fixed sound
structure.
• Ladders must be inspected prior to use, and ladders must only
be used for short duration light work and inspection, with one
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

hand on the ladder as a minimum at all times. If this cannot be


done another work platform is required.
•Ladders shall be inspected and color coded, deficient ladders
should be confiscated and destroyed.
• Only one person on ladder at one time.
•A type ladder should be supported or handheld by another
worker (Buddy-buddy system)
•Use of mandatory personal protective equipment such as safety
helmet, vest, gloves, glass.
•Provision of suitable footwear that will give a satisfactory grip and
prevent slipping.
•Ensure all workers are trained and received relevant training for
Involved
• Unauthorized or the task to be carried out.
workers, and
untrained •Risk and hazards associated with this work should be clearly
other
employee doing imparted to the job performer.
Hot works contractors
task. •Close supervision is highly required.
10 using cutting & grinder on site. 4 5 20 1 3 3
• No Fire warden •Pre-inspections of all materials and equipment to be used prior to
machine
• No Supervision commence. Ensure that machine / power tools to be use are in
• Contact with hot good condition, routed and color coded.
material. •Designate a competent fire warden.

• Traces of slags •Work supervision is required.


MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• No Signage / •Remove all combustible and flammable materials or any possible


Barricades source of ignition.
• Damage power •Provide suitable fire extinguisher and fire blanket.
tools / •Ensure the work is fully coordinated to SIMOPS.
equipment •Provision of caution signage and barricades to inform that works
• Work area not is on-going.
well ventilated. •Regular removal of cable tray / trunk scrap.
• No Fire Fighting •Provision of personal protective equipment such as face shield,
equipment mask, earplugs, and safety glass.

• No coordination •Area must be inspected after work completion to ensure no trace

to SIMOPS or remaining slags in the workplace.

• NO PPE
• Lack of training • Safe usage of hand tools training should be given to the
• Damaged and operatives.
Poor Condition • Provision of Tool bags or belts while working. Inspecting tools for
Installation of Cable tray Involved
of the Hand loose and deficient parts. Report and replace immediately.
and Trunking workers, and
Tools • If using tools at height, secure tool to you or scaffold.
11 other 2 5 10 1 2 2
• Incorrect • Toe-boards and brick guards/netting in place to prevent
Use of hand tools contractors
selection of tools accidental dropping of tools or materials.
on site.
• Motion • Monitored job rotation of workforce.
repetition •Hand tools should be placed away from the walkways to avoid

• Fragments slip and trip.


MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• Noise •Wear appropriate and mandatory PPE such as safety glass,


• No PPE gloves, mask and hearing protection
•Ensure that personnel will receive relevant training for the power
tools to be operated.
•Supervision is highly required.
•Only competent electrician to repair the tools and extension
cables.
• Lack of training
•All power tools and extension cables should be color coded and
• No Supervision
inspected in a monthly basis.
• Use of electricity
Installation of Cable Tray Involved •Inspect the power tools and extension cables for any defects prior
• Damage cable /
and Trunking workers, and to use.
wiring, power
12 other 3 5 15 •Ensure that sage guards are properly fixed and shall not be 1 2 2
tools
Use of power tools contractors remove.
• Vibration
and on site. •Use the power tools as per manufacturer instruction.
• Noise
electrical extension •Safe and under rating supply of electricity.
• Dust
cables •Double insulated tools/ equipment.
•No loose joints/connections.
•Cables must be properly routed.
•Use of approved/ industrial fittings.
•All power tools must be routed through a safe electrical
distribution board equipped with an ELCB.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

•Electrical extension cables should be inspected for any damage or


worn out parts such as plugs, wires and the cable itself prior to
use.
•Damage power tools and extension cables will be remove from
site.
•The practice of twisting and taping electrical components
together to create a connection is prohibited.
•Electrical extension cables must be suspended and protected at
site by means of cable hangers /stands.
•Wear appropriate PPE (Gloves/Goggles/Hearing protection)
• Lack of •Ensure that the MSDS effectively communicated to the
information / operatives prior to use the chemical.
training •All substances must have accompanied Material Safety Data
• No Supervision Sheet.
Involved
• Long exposure • Method Statement produced with safest possible system of work
workers, and
to chemicals introduced.
13 Chemical Handling other 3 5 15 1 2 2
• Substandard • Ensure adequate ventilation to move or extract fumes, and
contractors
Secondary respiratory equipment is worn.
on site.
Containment • Substances being used at height must be secured to fixed

• Improper structure to prevent tipping or falling of substance.

storage • Storage of substances must be secure and of good ventilation,

And disposal placed in cool and shaded area and out of direct sunlight.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• No drip trays • Ensure substance and protective equipment is disposed of in


• no fire accordance with Material safety data Sheet.
extinguisher •Use of approved and properly labelled secondary containment.
• No PPE • Always clean hands and face thoroughly before eating, drinking
or smoking.
• Suitable firefighting equipment to be in place.
•Provision of drip trays and spill kits.
• Adequate warning signs to be clearly displayed
• PPE must be worn as required in MSDS.
•Necessary arrangement and coordination with should be carried
• Insufficient out before commencement of work at night.
illumination • Obtain working permit prior to start the job.
• No supervision Involved • Adequate lighting shall be provided.
• Unfit workers workers, and • Worker must wear reflective vest.
14 Working at Night • Floor openings other 2 5 10 • Flashing lights shall be provided on all exit routes. 1 2 2
and contractors • Ensure adequate supervision to be deployed especially during
unprotected on site. the night shift.
edges. • Do the lightest/easiest tasks between 4-6am
• Employer concerned of his/her opinion as to whether the
employee is fit or unfit to perform the night work.
• Lack of training / Involved • Provision of relevant training to the personnel specific to the task
15 Lone Working 3 5 H 1 2 L
information workers, and to be carried out and emergency preparedness / awareness.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• Lack of other • An effective communication must be given and readily available


communication contractors with the worker.
• No emergency on site. • Work must be monitored by his superior through constant
preparedness communication.
procedure • Lone work must be fully coordinated to the security staff for his
• No security further monitoring and rounds in the site.
procedure • Ensure that the assigned worker is physically and mentally fit to
• Unfit workers perform the task.

• No PPE • Equipped the workers with mandatory and additional personal


protective equipment required for his job.

• Working under • Tool box Talk must be conducted before the work started.
direct sunlight Involved • Communicate an effective awareness to bad weather conditions
• Working in workers, and and emergency procedure.
excessive cold / other • Health surveillance should be done to determine who is unfit to
Working in Bad weather hot temperature contractors work and who have a pre-existing health condition that can be
conditions • Insufficient on site. exacerbate by prolong exposure to extreme weather or
16 2 5 10 1 2 2
(Hot & Cold) ventilation temperature.
• No supervision • Supervision is a must.
and training •Provision and availability of rest areas, safe drinking water and

• No welfare first aid room / Clinic.

facilities • Adequate ventilation should be provided.

• Unfit workers
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)

• No PPE • Wear suitable Personal Protective Equipment (PPE) like gloves,


safety footwear, and dust mask.
• For cold conditions, proper jackets should be provided.
• construction • Manual lifting/handling techniques.
waste Involved • Proper waste disposal and segregation system.
• Occupational workers, and • Use of appropriate PPE.
Removal of waste /
17 health problem. other 2 5 10 • Authorized personnel only. 1 2 2
Housekeeping
• Pinch point. contractors • Use of appropriate garbage bins.
• Fall of waste. on site. • Disposal of waste must be in accordance with local authority’s
regulation.