Job Title: Risk Assessment for Installation of Cable Tray and Trunking for Ministry of Culture Head Quarter Design and Build
(Fit-out) Project.
INITIAL RESIDUA
Who might RISK L RISK
No ACTIVITY ASPECT/HAZARD PREVENTATIVE CONTROL MEASURES
be harmed
L S R L S R
procedure •Supervisors should have valid third party training / trade test.
Communication lights
• Improper maintained.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)
• Collision • Trained & Certified driver, Flag man & Banks man should be
between trucks used with equipment all the time to assist the drivers/operators
and when there is movement of mobile plants/machineries, especially
equipment’s. while reversing.
• Unskilled • Implement one-way at site suing delineating means such as
drivers. traffic cones or plastic barriers etc.
• Reversing • Control Enter and Egress by security guard all the time.
vehicles. • Ensure the flagger/spotter available all the time to guide trucks
• Enter and during entry and egress from the site.
Egress. • It is recommended to avoid entering and egress trucks during
rush hours.
• Incompetent •Driver must have a valid driving license and vehicle registration.
driver / •Driver should be fit to work and not under drowsy medication.
personnel •Pre-visual inspection of vehicle before driving.
Driver,
• Under •Always check all safety devices and warning systems are
Involved
medication functioning properly.
Transportation of workers, and
3 • Unfit driver 3 5 15 •Regular maintenance of the vehicle. 1 2 2
Materials / Equipment other
• Improper •Ensure driver are well brief with the destination location and its
contractors
posture while governing traffic and safety rules.
on site.
driving •Prohibition of using mobile phone while driving.
Maintenance
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)
• Poor behaviour than can result to health illness and air pollution.
• Over speeding •Maintaining thicker foam padding on the driver car seat to
• Overturning minimize the whole body vibration impact and sustaining car
• Unsecured maintenance.
• Overloading of
materials
• Inclement
weather
• Vibration
• Smoke belching
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)
• Driving license • Always check that all safety devices and warning systems are
• Improper functioning properly.
manual • Do not operate pick up if any safety devices and warning system
handling is faulty.
• Limited • Barricade the area and use tag line
manpower • Ensure competent pickup driver
• Movement of Involved • Ensure proper manual lifting techniques to be carried out.
vehicle workers, and •Use of mechanical aid.
Loading /
4 • Fall of loads other 2 5 10 • Route of load transfer to be free of personnel from below. 1 2 2
unloading of materials
/materials contractors • Only competent rigger/signalman to give the signal to the driver.
• Struck by load/ on site. • Ensure driver and signal man has clear communication.
• Uneven ground
Involved •A competent and knowledgeable storekeeper (s) should be
• Lack of
Storage of Materials/ workers, and designated.
knowledge
5 Equipment on site other 2 5 10 •Systematic material / equipment arrangement must be in place. 1 2 2
• Incompetent
contractors •Quantities and elevation of materials on site shall be kept to an
person
on site. absolute minimum and secure all loose materials.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)
Combustible / •All flammable materials storage areas will be located at least 20m
materials are stored and areas where sources of ignition are found.
cranes • No maintenance contractors • Valid 3rd party lifting certificate for all lifting equipment / gears.
/inspection on site. • Valid 3rd party certificate for crane lifting supervisor.
• Incorrect use • Valid 3rd party certificate for crane operator and Egyptian’s
• Lack of accurate driving license.
information • Valid 3rd party certificate for rigger.
about the load • Approved lifting plan in place prior to works commencing as
characteristics. required.
• Unstable • Appropriate permits in place (where required) prior to works
ground where commencing.
mobile cranes • The crane shall have a fully operational automatic safe working
are used. load • indicator, and over wind protection.
• Poor slinging of • Ensure STARRT and/or task briefing are discussed with the work
Erection and • Incompetent Scaffold •Any person erecting a mobile tower must be competent, having
8 Dismantling of mobile personnel Erector, 3 5 15 received adequate training or, if not fully competent, be under the 1 2 2
scaffolding • Lack of training Scaffold supervision of an experienced and competent person.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)
• Unauthorised Inspector •Scaffold inspector should possess valid third party training
modification and other certificate from approved training provider.
/erection contractors •Scaffolding components must be checked if free from any defects
/dismantling on site. and ensure that they are all from the same manufacturer/supplier
• Substandard or the same type of tower before erection.
scaffolding •The tower must never be moved by:
components (a) towing it with a vehicle
• Damage (b) a person who is on the platform pulling the scaffold along
scaffolding parts using an adjacent structure.
• Loose / falling •Stabilisers is required if an aluminium tower is to have a working
objects platform higher than 3 metres above ground level.
• Contact with •Scaff tag must be completely filled with its required information.
damage ladder / •A prestart briefing / tool box talk should be imparted to the
scaffolding operatives prior to commence work on a daily basis.
• Unauthorised •Ensure that the working platform to be used is complete, safe to
modification of use and intended for the job.
scaffolds •Ensure the competency of scaffolding erector / inspector
• Uneven surface /supervisor.
• No PPE •Only trained operatives will erect, alter or dismantle Scaffold.
•Scaffolding should be inspected weekly by a competent
inspector.
•Only green tagged scaffolding is allowed to use at site.
•Incomplete scaffolding will be tagged red and prohibited to use.
•Inspection shall be recorded and readily available upon request.
•Tools and equipment to be use shall be kept minimum 1.5 meter
away from the edge of the scaffolding.
•Loose materials should be secured and protected by means of toe
boards and safety nets as required.
•SWL / capacity of scaffolding should not be exceeded and will be
clearly visible.
•Cables will be hang and suspended by using cable hanger and
stands and avoid direct contact with the scaffolding.
•Scaffolding shall not be move while in use or there is a worker on
top of the platform.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)
• NO PPE
• Lack of training • Safe usage of hand tools training should be given to the
• Damaged and operatives.
Poor Condition • Provision of Tool bags or belts while working. Inspecting tools for
Installation of Cable tray Involved
of the Hand loose and deficient parts. Report and replace immediately.
and Trunking workers, and
Tools • If using tools at height, secure tool to you or scaffold.
11 other 2 5 10 1 2 2
• Incorrect • Toe-boards and brick guards/netting in place to prevent
Use of hand tools contractors
selection of tools accidental dropping of tools or materials.
on site.
• Motion • Monitored job rotation of workforce.
repetition •Hand tools should be placed away from the walkways to avoid
And disposal placed in cool and shaded area and out of direct sunlight.
MOC HQ IN DGDA
(KINGDOM OF SAUDI ARABIA)
• Working under • Tool box Talk must be conducted before the work started.
direct sunlight Involved • Communicate an effective awareness to bad weather conditions
• Working in workers, and and emergency procedure.
excessive cold / other • Health surveillance should be done to determine who is unfit to
Working in Bad weather hot temperature contractors work and who have a pre-existing health condition that can be
conditions • Insufficient on site. exacerbate by prolong exposure to extreme weather or
16 2 5 10 1 2 2
(Hot & Cold) ventilation temperature.
• No supervision • Supervision is a must.
and training •Provision and availability of rest areas, safe drinking water and
• Unfit workers