SEN and DCC Ka INDEX and CERT

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Date Date

Assess Dated
Sr. of of
Practical Outcome ment sign. of
No perfor submi
marks teacher
mance ssion
Configure Peer-to-Peer Network atleast
1
three Host.
Create desired standard network cable
2 including Cross cable and test it by
using cable tester.
Connect computer using given
3
topology with wired media.
Connect Computers Using Wireless
4
Media.
Write a C Program for CRC Error
5
Detection.
6 Create a Network Using Bluetooth.
7 Share a Printer and Folder in Network.
Install Operating System Windows
8 Server
2008.
9 Configure File Server.
Configure client to file server and use
10 file
Services.
Configure static and dynamic IP
11
addresses.
12 Configure DHCP server.
Run basic utilities and network
13 commands: ipconfig, ping, tracert,
netstat, pathping, route.
Create two subnets and implement it
14 with
calculated subnet masking.
Set access rights and security
15 permissions
for user.
Create IPv6 environment in a small
16
network using simulator.
17 Setting up wireless network.
Data Communication and Computer Network 4)
Date Date
Assess Dated
Sr. of of
Practical Outcome ment sign. of
No perfor submi
marks teacher
mance ssion
Write problem statement to define the
1 project title with bounded scope of the
project.
Select relevant process model to define
2 activities and related tasks set for assigned
project.
Gather application specific requirements
3 for assimilate into RE (Requirements
engineering) model.
Prepare broad SRS (software requirement
4
software) for the above selected project.
Prepare use-cases and draw use - case
5
diagram using Software Modeling Tool.
Develop the activity diagram to represent
6 flow from one activity to another for
software development
Develop data designs using DFDs (data
7 flow diagram), Decision tables and E-R
(entity-relationship) diagram.
Draw class diagram, Sequence diagram,
8 Collaboration diagram, State Transition
Diagram for the assigned project.
Write test cases to validate requirements
9
of assigned project from SRS document.
Identify risks involved in the project and
prepare RMMM (RMMM-Risk
10
Management, Mitigation and Monitoring)
plan.
Evaluate size of the project using Function
11
point metric for the assigned project.
Estimate cost of the project using
COCOMO (Constructive Cost
12
Model)/COCOMO II approach for the
assigned project.
Use CPM (Critical Path Method)/PERT
(Programme Evaluation and Review
13
Technique) for scheduling the assigned
project.
Use Timeline charts/Gantt charts to track
14
progress of the assigned project.
Prepare SQA plan that facilitates various
15
attributes of quality of process.
Prepare SQA plan that facilitates
16
various attributes of quality of product.
Software Engineering 3)

You might also like