This file contains scanned images of hardcopy reports/data submitted to the Northern Territory
Government under Petroleum Legislation.

Bringing
This information is made available to assist future petroleum explorers and may
be distributed freely.

Scanning information
The quality of the scan reflects the condition of the original hardcopy report/data.

NSHORE

Call: +61 8 8999 6443


Click: geoscience. info@nt. gov. au
www.minerals.nt.gov.au
Visit: floor
3rd
Centrepoint Building
Smith Street Mall
Darwin
Northern Territory 0800

A09-093.indd
CASING AND CEMENTING REPORT

KINGFISHER..1

i
!
l i •

I
I •

UE:P I Of MINE:S & Ef'.lf:r<nY

llllllillillll~rtli11111
P00743
TEIKOKU OIL (BONAPARTE GULF)CO. LTD.
CASING RUNNING LIST
PERMIT:.~.~.~~................................. DATE:.~,.!~!~~......... Rig: .'3!?-':!.!~PJ?.!!!!:Y.!:f. ............. .
Casing size (in) .?.Q::............ Wt(ppf) .~.t~:~Q ..... B Connection: .~...........................
Supervisor: .t':f..[i.~~g,:!!9.Y.>:!~!!.c!~· Measured by:........................................
Order IJtNo: !Length !Total !Depth comment Order IJt No: [Length_ ITOtal Depth vomment
•::··::.,.. .e:.i<· ['·•:' •.•.:,'':-> •. 93.61 BO.!;tofu of S~!>il 'i ,. . ·.· ..
1 Shoe A 11.84 :.~.Lh:a4 81.77
2
--- 1 11.62 23.46 70.15 -------~~~·:~:·.==>.f+----~-\~}c~>~·:.•~··l\._...._,
. , •.·. +1_.':•._··•·-·.:~·,r~ota~···~'f~ro~m-la~s~t•co~J._.~
3 HgrJt. 11.74 3520 58.41
4 2 11.63 46.83 46.78
~---5 3 11.63 58.46
-35.15
- t---------n----+----+-----+----+-----t-----------
6 5 11.64 70.10 23.51
7 4XIO 11.51 81.61 12.00
t--------U-·----t----- ---- - - - - - - - -----------
---~ PupJt. 5.74 87.35 6.26
+--------11------t-----r-----..... ---+------1 ..- - - - - - -
9 7 11.74 99.09 -5.48. .
- - - ---!----+---+---·-- ~----------tll-----l,-----+-----l----l-----l-·---------1

~--t----+---1---+---r--------ll.----+----4----+----t---+------------

Total 99.09 Total

r---~---;----+-----r----~-------_,l~--+---·-4----+-----+---t----------­
l - - - - ---~f---+-----+-----~------;t---~---,_---+-----i----+--------------­
~--r---t--_,~--~----~---------·~~---~---+---~--~~---------------
------f---4-----~--~-------·~--+----+---~-----+--~----------·
~-~l----------~---+----~--------11---~---t----+-----l----t----------
. (

t----t---+------lf--~--......---------11-----~---+----lf-----l---+----------

-------~----+-----~--~~------1~----r----r---~----*----r-------------

1----~----+-----lf---~----......--------------~~-----r------+-----~----~-----r----------------

Total Total
~~~~=*==*==*======~
-----+-----~----~----~-------------il-------------+------r-----r------t-------------~
------- -----1---t----+-------~·-----j,-----t-----+---+----+-----------
~-- ~----r------~----~----+--------------i~----~----+------~----~----t--------------

l---~~-1-----r----~----+-----------~~-----r----,~---+--~~----l~-----------
~--+---4-----+----+---~~-------~~-~------+-----~----~----t-----------~

Total Total
Total Casing: Remarks: I
Casing Used: Jts Layed down Pup joint A and joint No. 7 after cementing.
Casing Left: 0 Jts Not used :lntjt No. &,Hanger jt A, Float shoe jt B,Pu"'-p,..jt."'B:---- _________.. _______ _
--
TEIKOKU OIL (BONAPARTE GULF)CO. LTD.
CASING RUNNING LIST

WELL : .~.i.m!~:!.~.~f:.L......... PERMIT: -~-~-~L ............................. . DATE:.~'!¥.~~~......... Rig: .~~!!.!.!'!P.P.!!!!'!Y.~f. ............ ..


Casing size (in) .~Q::............ Wt(ppf) -~~:.9.9........ X 56 ................. Connection:.~.~~.........................
Measured by:....................................... .
ora er IJt fllo: !Length_ !Total Depth comment 10raer IJtfllo: Length Total Depth Comment
< .- •. _. / >.
· ~·-· .•... > <12.33 LL12.33
·...L . •.• ....... ,· . •. <I > ' >
1 ·ShoeA
I 338.57 ~ttom <:!fSh(!• ·• ··· I j< •. -.·
I 326.24 i .•. < I •· > <I< I>>· <· > >< ..
I : 2 1 11.82 24.15 314.42 i> - ._. ·••••
· ·-·-· <I>•··········
-··-·········<········ Total from lal!fc<:!l/
-- ····- .. , 11 ·.· -· · '/>
3 2 11.82 35.97 302.60
4 __1 11.82 47.79 290.78
5 4 11.82 59.61 278.96
-- 6 5 11.82 71.43 267.14
-· ·--
7 6 11.83 83.26 255.31
8 7 11.82 95.08 243.49
9 -a· ~------- - - - c - - - -
11.83 106.91 ~1.6~-
------- ----- - - - - - -------- - - - - - - - - -
10- 9 11.83 118.74 219.83
-----------
11 10 11.83 130.57 208.00 --
12 11 11.83 142.40 196.17
Total 142.40 Total
13 12 11.83 154.23 184.34
14 13 11.82 166.05 172.52
15 f - - - - -14 11.82 177.87 160.70
-- -- ---
--16 - - - - - - - - - r--- -- -
15 f---;11.83 189.70 148.87
,-----
17 16 I----T1.82 201.52 137.05
18 17 11.83
-- r--------
213.35 125.22
19 18 11.83 225.18 113.39
--
20 19 11.83 237.01 101.56
21 20 11.82 248.83 89.74
22 21 11.83
---
260.66 77.91
total 118.26 total

23 22 11.82 272.48 66.09


24 Hgr(lwr) 4.68 4.68 61.41
--
25 ~upr 0.33 0.33 61.08
--- -- --
26 R/T 4.82 5.15 56.26 -
27 23 11.83 16.98 44.43
28 24 11.83 28.81 32.60
29 25 11.82 40.63 20.78
---
-- --
30 26 r--ff:83 52.46 8.95
27 11.83 64.29 ·2.88
-- --- -----------
--
Total 80.79 Total

---
--- --
I---- --- - - - 1----------
- ---
---- --
--
Total Total

---- ----·- ---


f----- -------

Total Total
Total Casing: Remarks: I
Casing Used: Jts
Casing Left: 0 Jts ---
-

I I
TEIKOKU OIL (BONAPARTE GULF)CO. LTD.
CASING RUNNING LIST
PERMIT: .~.e~.?................................. DATE: .~Qt~t!:L ...... Rig: .~.9-!!.!~P.P.!!!!:Y.!:L .......... .
Casing size (in) .t~.~!~:: ...... Wt(ppf) .~!!:.~.9.... .... Grade: ........!5.~. Connection: .~.~!.!~§~.................
Supervisor: .':!:f..~!~.~Q:~!?.w..~DS Measured bY:..~!~............................. ..
l()rder JtNo: ILength Total !Depth Comment Order ·JtNo: !Length ITotal Depth lvomment
I )> -.--•·•·- - ..... > <•·•-<> .;.;..12:3'3 1083.12 130ttom ()t $hi:!~>· • ·-. .. . .. '
>· '

SHOE A 12.33 1070.79 Centraliser


•••• :: > i>< ·--··- I<·-·
·-. -.. >><·•>•··-···········•<•.
INTERM. 1 11.69 24.02 1o59.10 Centraliser '
i . 1 ~1\)-~1 41~.•2} jT()ti;\1 MOl····· 1<\S~ C()l> ·.·.
F/COL. A 12.32 36.34 1046.78 Centraliser/piptag 53 51 11.90 622.81 460.31
4 2 11.34 47.68 1035.44 Centraliser 54 52 11.84 634.65 448.47
5 3 11.94 59.62 1023.50 I 55 53 11.69 646.34 436.78
6 4 11.59 7121 1011.91 56 54 11.67 658.01 425.11
7 5 11.67 82.88 1000.24 57 55 11.78 669.79 413.33
8
-- 11.82 681.61 - 401.~!
--
[ 6 11.68 94.56 988.56 58
-~ r-------
9 7 11.91 106.47 976.65 59 57 11.72 693.33 389.79
I ! --
10 8 11.69 118.16 964.96 60 58 11.75 705.08 378.04
---
11 9 11.79 129.95 953.17 61 59 11.64 716.72 366.40
12 10 11.97 141.92 941.20 Centraliser 62 60 11.55 728.27 354.85
Total 141.92 Total 117.36
13 11 11.53 153.45 929.67 Centraliser 63 61 11.83 740.10 343.02
14 12 11.34 164.79 918.33 Centraliser 64 62 11.91 752.01 331.11
15 13 11.61 176.40 906.72
----
65 63 11.74 763.75 319.37
--
--1-6 - - 14 -64 --
11.80 188.20 894.92 66 11.66 775.41 307.71
17 15 11.76 199.96 883.16 67 65 11.90 787.31 295.81
I 18 16 11.71 211.67 871.45 68 66 11.75 799.06 284.06
19 17 11.57 223.24 859.88 69 67 11.78 810.84 272.28
20 18 11.72 234.96 848.16 70 68 11.86 822.70 260.42
21 19 11.60 246.56 836.56 71 69 11.85 834.55 248.57
22 20 11.86 258.42 824.70 72 70 11.76 846.31 236.81
---
116.50 1ota1 118.04
23 21 11.12 269.54 813.58 73 71 11.77 858.08 225.04
24 22 11.79 281.33 801.79 74 72 11.73 869.81 213.31
25 23 11.61 292.94 790.18 75 73 11.78 881.59 201.53
26 24 11.92 304.86 778.26 76 74 11.62 893.21 189.91
----
27 25 11.87 316.73 766.39 77 75 11.71 904.92 178.20
28 26 11.53 32826 754.86 78 76 11.87 916.79 166.33
29 27 11.75 340.01 743.11 79 77 11.92 928.71 154.41
---30 --
28 11.73 351.74 731.38 80 78 11.68 940.39 142.73
31 29 11.79 363.53 719.59 81 79 11.85 952.24 130.88
32 30 11.79 375.32 707.80 82 80 11.78 964.02 119.10
116.90 Total 117.71
33 31 11.75 387.07 696.05 83 81 11.56 975.58 107.54
34 32 11.86 398.93 684.19 84 82 11.88 987.46 95.66
35 33 12.03 410.96 672.16 85 83 11.82 999.28 83.84
36 34 11.82 422.78 660.34 86 84 11.73 1011.01 72.11
--
-
37 35 11.48 434.26 648.86 87 PUP 3 5.63 1016.64 66.48
--- --
38 36 11.78 446.04 637.08 88 HGR A 5.04 1021.68 61.44
- - 3 9 ~=-
37 11.66 457.70 625.42 89 RITA 5.12 1026.80 56.32
40 38 11.76 469.46 613.66 90 85 11.74 1038.54 44.58
41 39 11.98 481.44 601.68 91 86 11.81 1050.35 32.77
42 40 11.67 493.11 590.01 92 87 11.76 1062.11 21.01
Total 117.79 Total 98.09
43 41 11.65 504.76 578.36 93 88 11.64 1073.75 9.37 Centraliser
44 42 11.75 516.51 566.61 94 90 11.55 1085.30 -2.18
- - 4 5 ------;j3 --------------
11.85 528.36 554.76
--
46 44 11.73 540.09 543.03
- - 47 45 11.74 551.83 531.29
-- - - - - --
48 46 11.89 563.72 519.40
49 47 11.74 575.46 507.66
50 48 11.83 587.29 495.83
-51 r------ 49 11.88 599.17 483.95
-- --
52 50 11.74 610.91 472.21
Total 117.80 Total 23.19
Total Casing: 117 Jts Remarks: 1 Leftover Make-up torque-7000ffllbs
Casing Used: 91 Jts Joint 89+ 91 to 113. + shoe bfloatb
Casing Left: 26 Jts Total= 26joints
Pup 1+2 hgr b +r/t b
9 518 Casing Running l)lly CA§ Runl
Joints #29, #71, #74, #2, #3 to be run out of sequence. Marked**

N° In Depth Depth to top


Hole Length Run Landed Comments
(m) (mRT) (mRT)

1814.30 <------------Bottom of shoe


Shoe 0.49 0.49 1813.81
Shoe joint 12.00 12.49 1801.81 Cent 3m above shoe. Thread-lock
156 11.77 24.26 1790.04 Centralizer at 1796m.Thread-lock
Float Collar 0.39 24.65 1789.65
Float joint 12.00 36.65 1777.65 Thread-lock
155 12.03 48.68 1765.62 Centralizer at 1771m
154 11.94 60.62 1753.68 Centralizer at 1760m
153 11.96 72.58 1741.72
152 11.78 84.36 1729.94
151 11.95 96.31 1717.99
150 11.83 108.14 1706.16
PUP#1 5.66 113.80 1700.50 Pip tag installed @ 1700.5m
149 11.98 125.78 1688.52
148 11.96 137.74 1676.56
147 11.95 149.69 1664.61
146 11.98 161.67 1652.63
145 11.95 173.62 1640.68
144 11.94 185.56 1628.74
'143 11.88 197.44 1616.86
142 11.97 209.41 1604.89
141 11.88 221.29 1593.01
140 11.93 233.22 1581.08
139 11.94 245.16 1569.14
138 11.93 257.09 1557.21
137 11.91 269.00 1545.30
136 11.92 280.92 1533.38
135 11.94 292.86 1521.44
134 11.94 304.80 1509.50
133 11.95 316.75 1497.55
132 12.01 328.76 1485.54
131 11.94 340.70 1473.60
130 11.97 352.67 1461.63
129 11.96 364.63 1449.67
128 11.96 376.59 1437.71
127 11.98 388.57 1425.73
126 11.97 400.54 1413.76
125 11.96 412.50 1401.80
124 11.92 424.42 1389.88
123 11.95 436.37 1377.93
122 12.03 448.40 1365.90
121 11.94 460.34 1353.96
120 11.92 472.26 1342.04
119 11.98 484.24 1330.06
118 11.98 496.22 1318.08
117 11.96 508.18 1306.12
116 11.94 520.12 1294.18
9 5/8 Casing Runnigg Tally (As Run)

Joints #29, #71, #74, #2, #3 to be run out of sequence. Marked**

N° In Depth Depth to top


Hole Length Run Landed Comments
(m) (mRT) (mRT)
115 11.91 532.03 1282.27
114 11.96 543.99 1270.31
113 11.94 555.93 1258.37
112 11.89 567.82 1246.48
111 11.96 579.78 1234.52
110 11.96 591.74 1222.56
109 11.95 603.69 1210.61
108 11.97 615.66 1198.64
107 12.01 627.67 1186.63
106 11.90 639.57 1174.73
105 11.96 651.53 1162.77
104 11.97 663.50 1150.80
103 11.97 675.47 1138.83
102 11.94 687.41 1126.89
101 11.93 699.34 1114.96 Change over to SOOT A/0 Elevators
100 11.92 711.26 1103.04
99 11.93 723.19 1091.11
98 12.03 735.22 1079.08
97 11.82 747.04 1067.26
96 11.98 759.02 1055.28
. 95 11.96 770.98 1043.32
94 11.93 782.91 1031.39
93 11.82 794.73 1019.57
92 11.77 806.50 1007.80
91 11.95 818.45 995.85
90 11.94 830.39 983.91
89 11.88 842.27 972.03
88 11.94 854.21 960.09
87 11.94 866.15 948.15
86 11.93 878.08 936.22
85 11.82 889.90 924.40
84 11.95 901.85 912.45
83 11.98 913.83 900.47
82 11.93 925.76 888.54
81 11.90 937.66 876.64
80 11.93 949.59 864.71
79 11.96 961.55 852.75
78 11.83 973.38 840.92
77 11.95 985.33 828.97
76 11.90 997.23 817.07
75 11.95 1009.18 805.12
73 ** 11.88 1021.06 793.24 #74 out
72 11.97 1033.03 781.27
70 ** 11.89 1044.92 769.38 #71 out
69 11.94 1056.86 757.44
68 11.97 1068.83 745.47
67 11.91 1080.74 733.56
66 11.93 1092.67 721.63
9 5/8 Casing Running Tally CAs Run)

Joints #29, #71, #74, #2, #3 to be run out of sequence. Marked**

N° In Depth Depth to top


Hole Length Run Landed Comments
(m) (mRT) (mRT)
65 11.87 1104.54 709.76
64 11.99 1116.53 697.77
63 11.96 1128.49 685.81
62 11.98 1140.47 673.83
61 11.96 1152.43 661.87
60 11.97 1164.40 649.90
59 11.93 1176.33 637.97
58 11.92 1188.25 626.05
57 11.94 1200.19 614.11
56 11.85 1212.04 602.26
55 11.87 1223.91 590.39
54 11.90 1235.81 578.49
53 11.88 1247.69 566.61
52 11.97 1259.66 554.64
51 11.96 1271.62 542.68
50 11.94 1283.56 530.74
49 11.91 1295.47 518.83
48 11.93 1307.40 506.90
47 12.05 1319.45 494.85
46 11.81 1331.26 483.04
'45 11.79 1343.05 471.25
44 11.95 1355.00 459.30
43 11.94 1366.94 447.36
42 11.98 1378.92 435.38
41 11.68 1390.60 423.70
40 11.78 1402.38 411.92
39 11.98 1414.36 399.94
38 11.95 1426.31 387.99
37 11.76 1438.07 376.23
36 11.93 1450.00 364.30
I
I ' 35 11.92 1461.92 352.38
34 11.93 1473.85 340.45
33 11.95 1485.80 328.50
32 11.78 1497.58 316.72
31 11.96 1509.54 304.76
30 11.93 1521.47 292.83
28 11.91 1533.38 280.92 #29 out
27 11.94 1545.32 268.98
26 11.92 1557.24 257.06
25 11.93 1569.17 245.13
24 11.60 1580.77 233.53
23 11.96 1592.73 221.57
22 11.98 1604.71 209.59
21 11.98 1616.69 197.61
20 11.95 1628.64 185.66
19 11.86 1640.50 173.80
18 11.98 1652.48 161.82
17 11.97 1664.45 149.85
Total of 151 full joints plus 1 x pup jnt 9 5/8" casing run. Joint No 29 recovered.
Average make-up torque - 7000 ft-lbs. (1 0000 ft-lbs on thread-lock joints )
Casing specifications- 9 5/8", 47 lb/ft, N-80, Buttress
Burst - 6870 psi
Collapse- 4750 psi
TEIKOKU OIL (Bonaparte Gulf) Co. Ltd.
CEMENTING REPORT

GENERAL
Well Name: Kingfisher-1 Cement Job: 30" Conductor Date: 21/05/94
Rig: RON T APPMEYER Supervisor: H . Flink Engineer: G. Rowlands Cement Co. DOWELL

Hole Size: 36" Depth (m): 95 ML Hanger Depth: 61.41 m Top of Liner Hanger:
Last Casing:- Size: Wt. kg/mm: Grade: Thread: Set at:
This Casing:- Size: 30" Wt. kg/mm: 310 lb/ft Grade: B Thread: ABB Vetco RL-4 Set at: 93.6m

Mud:- Type: sea water Weight: Viscosity:


Preflush:- Type: sea water Weight: Viscosity: Length in Annulus:

Temperature: 1st Stage:- BHST BHCT 2nd Stage: BHST BHCT


Thick/Time: 1st Stage:- Lead Tail 2nd Stage: Lead Tail

VOLUME CALCULATIONS
I 1st Stage 2nd Stage
Method: Lead Tail Lead
(cal/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume: 272 cu.ft 816 cu.ft
Excess: 200% 200%

r(
CEMENT CALCULATIONS
Volume Yield Bulk Dry Additives Depth: from to
1st Stage: Lead 816 cu.ft 1 .15cu.ft/s 700 sx 93.6 m 55.2 m
Tail
2nd Stage: Lead
Tail

I MIX WATER CALCULATIONS


Bulk Wtr.Req. Volume Type Mixed Used Additives Used
1st Stage: Lead 700 SX 5.16 gps 86 bbls s/w 130 bbls 86 bbls 1% Calcium Chloride BWOC = 9001b
Tail
2nd Stage: Lead
l Tail

I DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
1st Stage: Pump Preflush 10 bbls s/w 6 bpm 100 psi 13:02 13:04
Pump Lead 144 bbls 1.9 SG 8 bpm 500 psi 13:04 13:27
Pump Tail
/( Displace 4 bbls s/w 4 bpm 100 psi 13:29 13:31
2nd Stage: Pump Preflush
Pump Lead
Pump Tail
I
IPiug Bumped
Displace
Y/N Floats Held Y/N ---~_!';__ Annulus circulated above ML hanger Y/N no
----~~--- -~-------

:REMARKS: Unable to observe returns due to sea conditions

l-------------==~~~~=~=-=-====--_:-=·====-~-======-=-==:==-=~==:=~====--======--==:--

--------------------------------- -----------------------------------------------------------------------------------------------------------------1
---------------------------------------------------------------------------------------------------------1
-------------------------------------------------------------------------------------------------------1

----------------------------------------------------------------------------------------1
------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
----------------- -- -------- ------- ------------------------------------------- ---------------------------------------------------------
TEIKOKU OIL (Bonaparte Gulf) Co. Ltd.
CEMENTING REPORT

GENERAL
Well Name: Kingfisher-1 Cement Job: 20" casing Date: 24/05/94
Rig: RON TAPPMEYER Supervisor: H.Fiink Engineer: G.Rowlands. Cement Co. DOWELL

Hole Size: 26" Depth (m): 339m ML Hanger Depth: 61.41 m Top of Liner Hanger:
Last Casing:- Size: 30" Wt. kg/mm: 0.462 Grade: B Thread: Vetco RL4 Set at: 93.6m
This Casing:- Size: 20" Wt. kg/rnrn: 0.14 Grade: X 56 Thread: Vetco RL4S Set at: 338.57rn

Mud:- Type: Sea-water Weight: Viscosity:

r Preflush:- Type: Sea-water Weight: Viscosity: Length in Annulus: 24(20bbls)

ernperature: 1st Stage:- BHST 40 dog C BHCT 2nd Stage: BHST BHCT
Thick/Time: 1st Stage:- Lead 6hrs 32 mi Tail 2 hrs 2 min 2 nd Stage: Lead Tail

VOLUME CALCULATIONS
l 1st Stage 2nd Stage
'Method: Lead Tail Lead
'(cal!gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume: 2056cu.ft 2056cu.ft 395cu.ft 395cu.ft
Excess: 100% 100% 100% 100%

r{ ! CEMENT CALCULATIONS
Volume Yield Bulk Dry Additives Depth: from to
1st Stage: Lead 2056cu.ft 2.1 6cu .ft/ft 952 sx 299rn 73m
Tail 395 cu.ft 1.19cu.ft/ft 332 SX 339m 299m
2nd Stage: Lead
Tail

MIX WATER CALCULATIONS


Bulk Wtr.Req. Volume Type Mixed Used Additives Used
11 st Stage: Lead 952sx 12.5 gps 300bbls sw/dw mix 300bbls 3% Bentonite BWOC +0.01 gps D-47
Tail 332sx 5.17nps 30bbls sea water 30bbls 1% calcium chloride.
!2nd Stage: Lead
i Tail
I

DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
1st Stage: Pump Preflush 10 bbls s/w 6 bpm 100 psi 9:43 9:46 Nil
Pump Lead 367 bbls 1 .46 s.g 5 bpm 200 psi 9:46 10:53 Nil
Pump Ta"tl 70.5 bbls 1.89 s.g 8 bpm 600 psi 10:53 11:02 Nil
:\ Displace 13 bbls s/w 7 bpm 250 psi 11:02 11:08 Nil
2nd Stage: Pump Preflush
Pump Lead
Pump Tail
I Displace
y
IPiug Bumped Y/N Floats Held Y/N Annulus circulated above ML hanger Y/N No
-·---------· ~----- ----·---

______. _-====--==~-==------~:---
:REMARKS:

1------===~==~==---==---=

COMME_N_T_S_:_ __.]____________________________________________________________.. _ _ _ ,

! - - - - - - - -..----------· ..··-------- - - - - - - - · - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -
TEII<OKU OIL (Bonaparte Gulf) Co. Ltd.
CEMENTING REPORT

GENERAL
Well Name: Kingfisher-1 Cement Job: 13 3/8" Casing Date: 31/05/94
Rig: RON T APPMEYER Supervisor: H . Flink Engineer: G. Rowlands Cement Co. DOWELL

Hole Size: 17 1/2" Depth (m): 1090 ML Hanger Depth: 61.41 m Top of Liner Hanger:
Last Casing:- Size: 20" Wt. kg/mm: 0.14 Grade: X 56 Thread: Vetco RL4S Set at: 338.57 m
This Casing:- Size: 13 3/8" Wt. kg/mm: 0.101 Grade: K 55 Thread: Buttress Setat: 1083.12m

Mud:- Type: Gel/Polymer Weight: 1.1 SG Viscosity: 52

r
;preflush:-
I

emperature: 1st Stage:-


Thick/Time: 1st Stage:-
Type: sea water

BHST 60 Deg C
Lead 4 hrs 13 mi
Weight:

BHCT 39 Deg C 2nd Stage:


Tail 3 hrs 29 m 2 nd Stage:
Viscosity:

BHST
Lead
Length in Annulus: 49 m

BHCT
Tail
I

VOLUME CALCULATIONS
1st Stage 2nd Stage
iMethod: Lead Tail Lead
(cal/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume: 1696 cu. ft 1696 cu.ft 316 cu.ft 316 cu.ft
Excess: 10% on ea 10% 10% on ea 10%
i

r-( CEMENT CALCULATIONS


I '

r
!
st Stage: Lead
Tail
Volume Yield Bulk
1696 cu.ft 2.12 cu.ft/s 800 SX
316 cu.ft 1.15 cu.ft/s 275 sx
Dry Additives Depth: from
983 m
1083 m
to
239 m
983 m
1
2nd Stage: Lead
i
Tail

. Bulk Wtr.Req. Volume


MIX WATER CALCULATIONS
Type Mixed Used Additives Used
I, 1st Stage: Lead 800 sx 12.17 gps 231 .8 bbls Drill water 231.8 bbls 3% Bent. BWOC + 0.01 gps D- 47
·.Tail 275 SX 5.04 gps 33 bbls Drill water 33' bbls 0.01 gps D- 47
[2nd Stage: Lead
J Tail

DISPLACEMENT DATA
i OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
j1 st Stage: Pump Preflush 20 bbls s/w 5 bpm 210 psi 7:45 7:51 Full
Pump Lead 302 bbls 1.5 SG 6.5 bpm 210 psi 7:51 8:47 Full
Pump Tail 65 bbls 1.89 SG 5 bpm 410 psi 8:47 8:55 Full

~; Displace 10 bbls s/w 4 bpm 250 psi 8:57 9:03 Full


. nd Stage: Pump Preflush
Pump Lead
Pump Tail
I Displace
)Plug Bumped Y/N Yes - 2400 psi Floats Held Y/N -- Yes Annulus circulated above ML hanger Y/N Yes
--------

:REMARKS: Pressure tested cement lines to 3000 psi


I Used top and bottom plugs
1. Actual tail slurry pumped - 31 7 sx

,----·--·---
----------------....- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1
.. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

I i
I TEIKOKU OIL (Bonaparte Gulf) Co. Ltd.
I j
CEMENTING REPORT
GENERAL
Well Name: Kingfisher - 1 Cement Job: Cement Squeeze /11 Date: 02/06/94
Rig: RON TAPPMEYER Supervisor: H. Flink Engineer: G. Rowlands Cement Co. DOWELL

Hole Size: 12 1/4" Depth (m): 1127 ML Hanger Depth: Top of Liner Hanger:
Last Casing:- Size: 13 3/8" Wt. kg/mm: 101.4 Grade: K-55 Thread: BTC Set at: 1083.1 m
This Casing:- Size: Wt. kg/mm: Grade: Thread: Set at:

, Mud:- Type: KCI/PHPA Weight: 1.06 SG Viscosity: 51 s


Preflush:- Type: Seawater Weight: 1.02 SG Viscosity: Length in Annulus:

Temperature: 1st Stage:- BHST BHCT 2nd Stage: BHST BHCT


Thick/Time: 1st Stage:- Lead Tail 2nd Stage: Lead Tail

VOLUME CALCULATIONS
1st Stage 2nd Stage
Method: Lead Tail Lead
(cal/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume:
Excess: 38 bbl 38 bbl

(
CEMENT CALCULATIONS
Volume Yield Bulk Dry Additives Depth: from to
1st Stage: Lead
Tail 38 bbl 1 .15 cu ft/s 168 sx Neat 1127 m 1063 m
2nd Stage: Lead
Tail

'
MIX WATER CALCULATIONS
Bulk Wtr.Req. Volume Type Mixed Used Additives Used
1st Stage: Lead
Tail 168 sx 5.17 gal/sx 20 bbl D/W 20 bbl 20 bbl None
2nd Stage: Lead
Tail

DISPLACEMENT OATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
1st Stage: Pump Preflush 50 bbl 1.02 SG 6.7 bpm 1657 hrs 1719 hrs
Pump Lead
( Pump Tail 38 bbl 1.89 SG 8 bpm 1721 hrs 1726 hrs
\ Displace 7/57 bbl 1.02/1.06 6/6 bpm 1735 hrs 1746 hrs
2nd Stage: Pump Preflush
Pump Lead
Pump Tail
Displace
Plug Bumped Y/N N/A Floats Held Y/N Annulus circulated above ML hanger Y/N
----- ------ -----

REMARKS:
--~---------------

COMMENTS: 1 Cement plug squeezed in attempt to improve low FLOT_below 13 3/8" casing shoe. Plug balanced 11~7- 1063m w/

OEDP. Pipe pulled up to 1 040m and reverse circulated clean. Upper pipe rams closed and hesitation squeeze performed to maximum surface
pressure of 280 Ji:;~.z4-SG--EMW at sho~!otal of 8 bbls cement squeezed. TOC tagged11t1093::!_1_:___ - ------------
-------------------------------------------------------------------------

1------------------------------------------ ------------------------------------1
-------------------------------------------------------------------------------------------------------------------------------------------
TEII<OKU OIL (Bonaparte Gulf) Cq. Ltd.
CEMENTING REPORT

GENERAL
I Well Name: Kingfisher - 1 Cement Job: Cement Squeeze #2 Date: 03/06/94
' Rig: RON TAPPMEYER Supervisor: H. Flink Engineer: V. Tilley Cement Co. DOWELL

: Hole Size: 12 1/4" Depth (m): 1093 ML Hanger Depth: Top of Liner Hanger:
'i Last Casing:- Size: 13 3/8" Wt. kg/mm: 101.4 Grade: 1<-55 Thread: BTC Set at: 1083.1 m
i This Casing:- Size: Wt. kg/mm: Grade: Thread: Set at:
Mud:- Type: I<CI/PHPA Weight: 1.06 SG Viscosity: 51 s
j Preflush:- Type: Seawater Weight: 1 .02 SG Viscosity: Length in Annulus:

I Temperature: 1st Stage:- BHST BHCT 2nd Stage: BHST BHCT


Thick/Time: 1st Stage:- Lead Tail 2nd Stage: Lead Tail
[

VOLUME CALCULATIONS
1st Stage 2nd Stage
Method: Lead Tail Lead
(cal/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume:
Excess: 23.8 bbl 2.3.8 bbl

-( CEMENT CALCULATIONS
'
Volume Yield Bulk Dry Additives Depth: from to
1st Stage: Lead
Tail 23.8 bbl 1.15 cu ft/s 116 sx Neat 1093 m 1053 m
2nd Stage: Lead
Tail

MIX WATER CALCULATIONS


Bulk Wtr.Req. Volume Type Mixed Used Additives Used
1st Stage: Lead
Tail 116 sx 5.17 gal/sx 13 bbl D/W 13 bbl 13 bbl None
2nd Stage: Lead
Tail

DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
1st Stage: Pump Preflush 20 bbl 1.02 SG 5 bpm 0614 hrs 0618 hrs
Pump Lead
Pump Tail 23.8 bbl 1.89 SG 7 bpm 0633 hrs 0637 hrs
I '
Displace 3/57 bbl 1.02/1 .06 4/6.3 bprn 0646 hrs 0657 hrs
2nd Stage: Pump Preflush
Pump Lead
Pump Tail
Displace
Plug Bumped Y/N N/A Floats Held Y/N - - - - - - - Annulus circulated above ML hanger Y/N
------~-
----
REMARKS: -----------------------~----

---------~----~~------------·------- -·

COMMENTS: I Cement plug #2 balanced 1093 - 1053m w/OEDP. Pipe pulled up to 1015m and reverse circulated clean. Upper pipe
rams closed and 1.5 bbls cement squeezed-at maximum pressure of 570 psi (1.43 SG EMW at shoe). Pressure held on cement fo~ approximately
30iilinCIUrii19whiCh-!_~me pressure _l?_l~~w;:;gradually to 360 psi (1.29SGEiii1v\Tatsllo8)-:--roeta;)ged_ at 1055m. __-_ _ _ __
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------1
-------------------------------------------------------------------------1

-------------------------------------------------------------·----------1
TEIKOKU OIL (Bonaparte Gulf) Co. Ltd.
CEMENTING REPORT

GENERAL
Well Name: Kingfisher - 1 Cement Job: Cement Squeeze #3 Date: 04/06/94
Rig: RON T APPMEYER Supervisor: S. Nowe Engineer: V. Tilley Cement Co. DOWELL

Hole Size: 12 1 /4" Depth (m): 1093 ML Hanger Depth: Top of Liner Hanger:
Last Casing:- Size: 13 3/8" Wt. kg/mm: 101.4 Grade: K-55 Thread: BTC Set at: 1083.1 m
This Casing:- Size: Wt. kg/mm: Grade: Thread: Set at:

Mud:- Type: KCI/PHPA Weight: 1.08 SG Viscosity: 40 s


Preflush:- Type: Seawater Weight: 1.02 SG Viscosity: length in Annulus:
I
remperature: 1st Stage:- BHST BHCT 2nd Stage: BHST BHCT
Thick/Time: 1st Stage:- Lead Tail 2nd Stage: Lead Tail

I
i
I VOLUME CALCULATIONS
I 1st Stage 2nd Stage
,Method: lead Tail Lead
real/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume:
Excess: 23.7 bbl 23.7 bbl
I

i ' CEMENT CALCULATIONS


! Volume Yield Bulk Dry Additives Depth: from to
1st Stage: Lead
Tail 23.7 bbl 1 .15 cu ft/s 116 sx Neat 1093 m 1053 m
2nd Stage: Lead
Tail

MIX WATER CALCULATIONS


Bulk Wtr.Req. Volume Type Mixed Used Additives Used
1st Stage: Lead
Tail 116 SX 5.17 gal/sx 13 bbl D/W 13 bbl 13 bbl None
!2nd Stage: Lead
I
l Tail

i
i DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish % Returns
1st Stage: Pump Preflush 20 bbl 1.02 SG 5 bpm 0428 hrs 0432 hrs
Pump Lead
Pump Tail 23.7 bbl 1.89 SG 7 bpm 0433 l1rs 0437 hrs

~d
Displace 3/5 7 bbl 1.02/1.06 5/5.7 bpm 0446 hrs 0457 hrs
Stage: Pump Preflush
Pump lead
Pump Tail
l Displace
IP!ug Bumped Y/N N/A Floats Held Y/N Annulus circulated above ML hanger Y/N
.~----------
------ ~---------

iREMARKS: ------------------------ ------


----------

I -. -- ------------------ --------

----------------------------- ----------------·

I !
TEIKOKU OIL (Bonaparte Gulf) Co. Ltd.
CEMENTING REPORT

GENERAL
Well Name: Kingfisher - 1 Cement Job: Lost Circulation Cement Plug 1 -Top Tanmurra Date: 08/06/94
Rig: RON TAPPMEYER Supervisor: S. Nowe Engineer: V. Tilley Cement Co. DOWELL

Hole Size: 12 1/4" Depth (m): 1580 ML Hanger Depth: 61.41 Top of Liner Hanger: 61.4
Last Casing:- Size: 13 3/8" Wt. kg/mm: 101.4 Grade: K-55 Thread: BTC Set at: 1083.1 m
This Casing:- Size: Wt. kg/mm: Grade: Thread: Set at:

Mud:- Type: KCI/PHPA Weight: 1.09 Viscosity: 40 s


Preflush:- Type: Inhibited Seawater Weight: 1.02 SG Viscosity: Length in Annulus: 71 m

Temperature: 1st Stage:- BHST BHCT 2nd Stage: BHST BHCT


Thick/Time: 1st Stage:- Lead Tail 2nd Stage: Lead Tail

VOLUME CALCULATIONS
1st Stage 2nd Stage
Method: Lead Tail Lead
{cal/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume:
Excess: 23 bbls 23 bbls

CEMENT CALCULATIONS
) Volume Yield Bulk Dry Additives Depth: from to
1st Stage: Lead
Tail 23 bbls 1.15 cuft/s 110 Neat 1580 1530
2nd Stage: Lead
Tail

MIX WATER CALCULATIONS


Bulk Wtr.Req. Volume Type Mixed Used Additives Used
1st Stage; Lead
Tail 110 sx 5.17 gal/sx 13 bbl D/W 13 bbl 13 bbl None
2nd Stage: Lead
Tail

DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
1st Stage: Pump Seawater ahead 28 bbls 1.02 6 bpm 210 psi 9:30 9:43 100%(Est)
Pump Lead 23 bbls 1.9 8.3 bpm 550 psi 10:11 10:14 100%(Est)
Pump Seawater Behind 4 bbls 1.02 6 bpm 190 psi 10:18 10:19 100%{Est)
Displace 82 bbls 1.09/1.02 4.7 bpm N/A 10:30 10:48 100%{Est)
2nd Stage: Pump Preflush
Pump Lead
Pump Tail
Displace
Plug Bumped Y/N N/A Floats Held Y/N Annulus circulated above ML hanger Y/N
~~~------ ----· -----
REMARKS: Disj.no"~" ''"" fluid consisted of 42 bbls of treated sea water and 40 bbls of mud
·--··---··--------- -----· -----

COMME~N~T~S~:____JI_G~oo_d___
m_~u~d_r~et~ur_n_s,_u__ ~p~an_n~l_llu~s_t~hro~ug~ho_utc_e_m_e_n_t_at_io_n_.______.______________________________
1

- - - - - - - - - - - · - - - - - - - - - · - · - - - - - - - · - · - - - - - - - - - - - - - - - - - - - - -------------------------
-----··-----·-··-----·-----·--------------------------·---- - - - - - - - - - - - - - - - - -

1---------------------------- ----·------·-----------------·--- ----·--------------- - - - - 1


···----·-------·--·--··---------·--··--------------·---·-·------------------------·----------·-·--
--------------·-···-----·--·--------------------·- -----------------------------1
TEII<OKU OIL (Bonaparte Gulf) Co. Ltd.
CEMENTING REPORT

I GENERAL
I ~.--------------------------------------------~~~--------------------------------------------4
I Well Name: Kingfisher - 1 Cement Job: Plug 112 - Lost circulation Date: 11/06/94
\ I Rig: RON TAPPMEYER Supervisor: S. Nowe Engineer: V. Tilley Cement Co. DOWELL

!Hole Size: 12 1/4" Depth (m): 1633 ML Hanger Depth: 61.41 Top of Liner Hanger: 61.4
[ ;Last Casing:- Size: 13 3/8" Wt. kg/mm: 101.4 Grade: K-55 Thread: BTC Set at: 1083.1 m
[ ~his Casing:- Size: Wt. kg/mm: Grade: Thread: Set at:

IMud:- Type: KCI/PHPA Weight: 1.09 SG Viscosity: 40 s


1 Preflush:- Type: Seawater Weight: 1.02 SG Viscosity: Length in Annulus: 50 m
'
i ,_Temperature: 1st Stage:- BHST BHCT 2nd Stage: BHST BHCT
Thick/Time: 1st Stage:- Lead Tail 2nd Stage: Lead Tail

I
I I

I VOLUME CALCULATIONS
I, 1st Stage 2nd Stage
Method: Lead Tail Lead
(cal/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume: 48 bbls 48 bbls
1Excess:
!

n· CEMENT CALCULATIONS

f st Stage: Lead
Tail
Volume Yield

48 2.12cu ft/s 127 sx


Bulk Dry Additives

3% PHG, 0.02 gal/sx D80 + 0.01 gal/sx D47


Depth:

1633m
from to

1530m
1 Lead
·2nd Stage:
' Tail

MIX WATER CALCULATIONS

r .
st Stage:
'
Lead
Tail
Bulk

127sx
Wtr.Req. Volume

1 2.19 galls 37 bbls


Type

D/W
Mixed

50 bbls
Used

37 bbls
Additives Used

D80 3.5 gal, D47 2 gal, Gel 4 sx


:Znd Stage: Lead
Tail
,'
DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
1_1 st Stage: Pump Preflush 20bbl 1.02 SG 6bpm 120psi 15:25 15:30 Nil
Pump Lead
Pump Tail
r--- 48bbl 1.50 SG 8.3bpm 160psi 15:40 16:10 Nil
:( ' Displace 80bbl 1.02 SG 8.5bpm 120psi 16:15 16:28 Nil
pnd ~tage:
Pump Preflush
Pump Load
Pump Tail
I Displace
jPiug Bumped Y/N N/A Floats Held Y/N --·-·--------- Annulus circulated above ML hanger Y/N
-----------~-~
---·-

>iEMARKS: - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
, _ .- - - - - - - - - - - - - - -

I COMMENTS: IPressure test surface line to _1 000 prior to cementing. woe 4 hrs. Fill annulus after pumping 120 bbls seawater.
· Losses at 200 gpm. Static fluid level in annulus at sealevel. RIH and tag TOC at 1587m. ----
---···-----

I
I
-------~--------- -
---------------- ----
I
TEII<OKU OIL (Bonaparte Gulf) Go. Ltd.
CEMENTING REPORT

GENERAL
Well Name: Kingfisher - 1 Cement Job: Plug #3 - Lost circulation Date: 11/06/94
Rig: RON TAPPMEYER Supervisor: S. Nowe Engineer: V. Tilley Cement Co. DOWELL

Hole Size: 12 1/4" Depth (m): 1633 ML Hanger Depth: 61.41 Top of Liner Hanger: 61.4
Last Casing:- Size: 13 3/8" Wt. kg/mm: 101.4 Grade: 1<-55 Thread: BTC Set at: 1083.1 m
This Casing:- Size: Wt. kg/mm: Grade: Thread: Set at:

Mud:- Type: KCI/PHPA Weight: 1 .09 SG Viscosity: 40 s


Preflush:- Type: Seawater Weight: 1 .02 SG Viscosity: Length in Annulus: 50m

Temperature: 1st Stage:- BHST BHCT 2nd Stage: BHST BHCT


Thick/Time: 1st Stage:- Lead Tail 2nd Stage: Lead Tail

I VOLUME CALCULATIONS
1st Stage 2nd Stage
]Method: Lead Tail Lead
'
real/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume: 48 bbls 48 bbls
!Excess:
'

r: Volume Yield Bulk


CEMENT CALCULATIONS
Dry Additives Depth:
f st Stage: Lead
Tail 48 2.12cu ft/s 127 sx 3% PHG, 0.02 gal/sx D80 + 0.01 gal/sx D47
from

1587 m
to

1484 m
12nd Stage: Lead
Tail

' MIX WATER CALCULATIONS


Bulk Wtr.Req. Volume Type Mixed Used Additives Used
Lead
-
11 st Stage:
Tail 127 SX 3.43 gal/sx 37 bbls D/W 50 bbls 37 bbls D80 3.5 gal, D47 2 gal, Gel 4 sx
12nd Stage: Lead
I
Tail

'
: DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
'1st Stage: Pump Preflush 20 bbls 1.02 SG 6bpm 120 psi 23:00 23:05 Nil
Pump Lead 48 bbls 1.50 SG 8.3bpm 160 psi 23:17 23:35 Nil
Pump Tail

~d
Displace 80 bbls 1.02 SG 8.5 bpm 120 psi 23:40 23:52 Nil
Stage: Pump Preflush
Pump Lead
Pump Tail
r' Displace
1:1ug Bumped Y/N N/A l'loats Held Y/N Annulus circulated above ML hanger Y/N
-~------------·--- -·-------- -------
'lEMARKS: --~----------~---~------ ----------------·--- --
I
I

,--------------------------------------------------------------------------------------1
;--------------------------------------------------- ---------------- -------------------- - - - - - - - - - - - - - - - - - - - - -

------------------------------------ -------------------------------------
--------------------------------------------------- -----
r-----------------
TEIKOKU OIL (Bonaparte Gulf) Co. Ltd.
CEMENTING REPORT

GENERAL
i Well Name: Kingfisher - 1 Cement Job: Plug #4 - Lost circulation Date: 12/06/94
t Rig: RON T APPMEYER Supervisor: S. Nowe Engineer: V. Tilley Cement Co. DOWELL

Hole Size: 12 1/4" Depth (m): 1633 ML Hanger Depth: 61.41 Top of Liner Hanger: 61.4
j Last Casing:- Size: 13 3/8" Wt. kg/mm: 101.4 Grade: K-55 Thread: BTC Set at: 1083.1 m
j This Casing:- Size: Wt. kg/mm: Grade: Thread: Set at:

Mud:- Type: KCI/PHPA Weight: 1.09 SG Viscosity: 40 s


Preflush:- Type: LCM Pill Weight: 1 .1 SG Viscosity: 75 Length in Annulus: 250m

Temperature: 1st Stage:- BHST BHCT 2nd Stage: BHST BHCT


Thick/Time: 1st Stage:- Lead Tail 2nd Stage: Lead Tail

VOLUME CALCULATIONS
1st Stage 2nd Stage
Method: Lead Tail Lead
(cal/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume: 48 bbls 48 bbls
Excess:

7
~
i CEMENT CALCULATIONS
Volume Yield Bulk Dry Additives Depth: from to
1st Stage: Lead
Tail 48 2.12cu ft/s 127 SX 3% PHG, 0.02 gal/sx D80 + 0.01 gal/sx D4 7 1583m 1483m
2nd Stage: Lead
Tail

MIX WATER CALCULATIONS


Bulk Wtr.Req. Volume Type Mixed Used Additives Used
1st Stage: Lead
Tail 127sx 12.19 galls 37 bbls D/W 50 bbls 37 bbls D80 3.5 gal, D47 2 gal, Gel 4 sx
2nd Stage: Lead
Tail

DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
1st Stage: Pump Preflush LCM 100 bbl 1.1 SG 8 bpm 120psi 5:30 6:00 50% (approx)
Pump Lead
Pump Tail 48bbl 1.50 SG 5 bpm 160psi 6:20 6:52 10% (approx)
( Displace 80bbl 1.02 SG 8.5bpm 120psi 6:55 6:05 50% (approx)
2,,J Stage: Pump Preflush
Pump Lead
Pump Tail
Displace
Plug Bumped Y/N N/A Floats Held Y/N - Annulus circulated above ML hanger Y/N
·-------- --- ----
REMARKS: -----------------··--
--··---------------------
-------·----- ·-- ·---------- -------

COMMENTS: IPump 100 bbls LCM pill ahead prior to cementing. Approximately 50% returns during displacement. WOC 4 hrs.
Fluid in annulus at sea levei-:-L.ossesat125gf)n;R1Halidta9 TOC at i 583m. · ·
--------------------------·------------------------------------------------------·------------
-----------------------------------------------------------------------
------·--·-···----------·---------·----------------------------
--------------------·--·-----····----·-·------------------------------------------------
1-------··-·---------·-----·-------------·--·-·----·--·-------------------------------·-------
-------·-------- ..... ······--·-····· ······-----····- ·········-··- -----------------------------------·--------···---------------------------1
TEIKOKU OIL (Bonaparte Gulf) Co. Ltd.
CEMENTING REPORT

GENERAL
Well Name: · Kingfisher-1 Cement Job: 9 5/8" Date: 19/06/94
Rig: RON TAPPMEYER Supervisor: S.Nowe Engineer: G.Rowlands. Cement Co. DOWELL

Hole Size: 12 1/4" Depth (m): 1817 ML Hanger Depth: 61.35m Top of Liner Hanger:
Last Casing:- Size: 13 3/8" Wt. kg/mm: 101 Grade: K-55 Thread: Buttress Set at: 1083.12m
This Casing:- Size: 9 5/8" Wt. kg/mm: 70 Grade: N-80 Thread: Buttress Set at: 1814.30m

Mud:- Type: Seawater Weight: 1.03 SG Viscosity:


Preflush:- Type: Seawater Weight: 1.03 SG Viscosity: Length in Annulus:

Temperature: 1st Stage:- BHST 70 deg C BHCT 49 deg C 2nd Stage:- BHST BHCT
Thick/Time: 1st Stage:- Lead Tail 3 hr, 12 mit 2nd Stage:- Lead Tail

VOLUME CALCULATIONS
1st Stage 2nd Stage
Method: Lead Tail Lead
(cal/gauge) OH ANN TOTAL OH ANN TOTAL OH ANN TOTAL
Volume: 990 cu. ft 990 cu.ft.
Excess: 15% calipe

CEMENT CALCULATIONS
Volume Yield Bulk Dry Additives Depth: from to
1st Stage: Lead
Tail 990 cu.ft. 1.15 CLLft/s 860 sx 1814 m 1525 m
2nd Stage: Lead
Tail

MIX WATER CALCULATIONS


Bulk Wtr.Req. Volume Type Mixed Used Additives Used
1st Stage: Lead
Tail 860 sx 5.0 gal/sk 102 bbls DMJ 110 bbls 102 bbls 0.05 gallsk D-81 + 0.01 gal!sk D-47
2nd Stage: Lead
Tail

DISPLACEMENT DATA
OPERATION Strokes Volume Density Rate Pressure Start Finish %Returns
1st Stage: Pump Preflush 10 bbls SM/ 6 bpm 100 psi 16:02 16:04 70%
;/ Pump Lead
1--·
Pump Tail 176 bbls 1.89 SG 8bpm 500 psi 16:17 16:41 70%
Displace 432 bbls SM/ 11.8bpm 500 psi 16:43 17:30 70%
2nd Stage: Pump Preflush
Pump Lead
Pump Tail
Displace
Y/N Yes-2000psi Floats Held Y/N Annulus circulated above ML hanger Y/N
Plug Bumped Yes
- -No
--
REMARKS: Pressure tested cement lines to 3000 psi. ----·
LJsed-Halliburton non-rotating top and bottom plugs.

COMMENTS: I _ ------,-~--,--------------------- -------------- _____ 1


_____________________Disp_l_~il_9__"YJ~~!l~JlUm~ 4~~~~~s_________________________________________________
Actual cement used:__,(.:.::ta::..:nc:.:k...::d:.:ripe<.)_-.::.9-=-00::...::.s.x"---------------- ________________
===::~:==~--Bumped pl~jo 1~00 psi__ove_r_!inal circ~lating pressure ------------------------•
----------------- ----------------------------------------------------------------------------------------
----------------------------·-·------------------ --------------· ----------------------
CEMENT JOB RIG: Tappmeyer DATE: 9/08/94
Plug Back cement plug #1 WELL: Kingfisher # 1

Previous Depth AH: 1814.00 m


Casing: ID: 8.68 in Capacity 0.2402 Bbls/m

HOLE: DIA: 8.50 in Capacity 0.2303 Bbls/m


Caliper: 11.46 in Capacity 0.4186 Bbls/m
Open hole volume oversize 81 . 77 percent

STINGER Mule shoe@ 2330.00 m


OD: 3.50 in Displacement 0.0147 Bbls/m
ID: 2.76 in Capacity 0.0243 Bbls/m
Length: 115.00 m
/
l

ANN.CAP Hole/Stinger: Capacity 0.3795 Bbls/m


Csg/Stinger: Capacity 0.2011 Bbls/m

DRILL OD 5.00 in ANN CAP Hole/DP (Call 0.34 Bbls/m


PIPE ID 4.28 in Csg/DP 0.16 Bbls/m
Capacity: 0.0583 Bbls/m

SLURRY: Results:
Density: 1.90 sg Mix Water: 18.3 Bbls
Top Cement: 2270.00 m Cement: 153.3 sx
Excess: 25.00% Gradient: 0.82 psi/ft
Spacer ahead: 10.00 Bbls Yield: 1.150 cuft/sx
Spacer behind: 0.64 Bbls
M/Water Density: 1.00 SG Slurry Vol: 31.39 Bbls

CHASE:
Under displace Vol: 2.00 Bbls Pump Output: 0.1190 Bbls/stk
Under displaced: 34.32 m Displace with: 123.17 Bbls
Height of balanced plug Strokes: 1035
with stinger in: 77.90 m
y
Using HWDP Y /NI I Length: 141 m

ADDITIVES
D-80 0.06 GPS Drill water 4.93 GPS
D-81 0.01 GPS
D-47 0.01 GPS Class G cement
CEMENT JOB RIG: Tappmeyer DATE: 10/08/94
Plug Back plug #2 WELL: Kingfisher #1

Previous Depth AH: 1814.00 m


Casing: ID: 8.68 in Capacity 0.2402 Bbls/m

HOLE: DIA: 8.50 in Capacity 0.2303 Bbls/m


Caliper: 9.07 in Capacity 0.2622 Bbls/m
Open hole volume oversize 13.86 percent

STINGER Mule shoe@ 1844.00 m


OD: 3.50 in Displacement 0.0147 Bbls/m
ID: 2.76 in Capacity 0.0243 Bbls/m
Length: 115.00 m

~NN.CAP Hole/Stinger: Capacity 0.2232 Bbls/m


Csg/Stinger: Capacity 0.2011 Bbls/m

DRILL OD 5.00 in ANN CAP Hole/DP (Cal) 0.1825 Bbls/m


PIPE ID 4.28 in Csg/DP 0.1605 Bbls/m
Capacity: 0.0583 Bbls/m

SLUBRY: Results:
Density: 1.90 sg Mix Water: 10.55 Bbls
Top Cement: 1784.00 m Cement: 88.20 sx
Excess: 20.00% Gradient: 0.82 psi/ft
Spacer ahead: 10.00 Bbls Yield: 1 .1 5 cuft/sx
Spacer behind: 1.09 Bbls W/C Ratio: 4.62
M/Water Density: 1.00 SG Slurry Vol: 18.09 Bbls

tHASE:
Under displace Vol: 5.00 Bbls Pump Output: 0.1190 Bbls/stk
Under displaced: 85.80 m Displace with: 91.74 Bbls
Height of balanced plug Strokes: 771
with stinger in: 76.69 m
Using HWDP Y /N y Length: 141 m

ADDITIVES
D-80 0.00 GPS Drill water 4.97 GPS
D-81 0.04 GPS
D-47 0.01 GPS Class G cement
CEMENT.JOB RIG: Tappmeyer DATE: 11/08/94
Plug Back plug #3 WELL: Kingfisher # 1

~reviQU1'2 Depth AH: 1086.00 m


Casing: ID: 12.42 in Capacity 0.4913 Bbls/m

HOLE: DIA: 12.42 in Capacity 0.4912 Bbls/m


Caliper: 12.42 in Capacity 0.4912 Bbls/m
Open hole volume oversize 0.00 percent

STINGER Mule shoe@ 109.00 m


OD: 5.00 in Displacement 0.0214 Bbls/m
ID: 4.28 in Capacity 0.0583 Bbls/m
Length: 115.00 m

'\NN.CAP Hole/Stinger: Capacity 0.4116 Bbls/m


Csg/Stinger: Capacity 0.4116 Bbls/m

DRILL OD 5.00 in ANN CAP Hole/DP (Cal) 0.4116 Bbls/m


PIPE ID 4.28 in Csg/DP 0.4116 Bbls/m
Capacity: 0.0583 Bbls/m

SLURRY: Results:
Density: 1.90 sg Mix Water: 13.12 Bbls
i Top Cement: 64.00 m Cement: 105.17 sx
I
I
I , Excess: 0.00% Gradient: 0.82 psi/ft
Spacer ahead: 0.00 Bbls Yield: 1 . 1 80 cuft/sx
Spacer behind: 0.00 Bbls
M/Water Density: 1.04 SG Slurry Vol: 22.11 Bbls

QHASE:
I {
Under displace Vol: 2.00 Bbls Pump Output: 0.1190 Bbls/stk
Under displaced: 34.32 m Displace with: 1.61 Bbls
Height of balanced plug Strokes: 14
with stinger in: 47.05 m
Using HWDP Y /N n Length: 141 m

ADDITIVES
D-80 0.00 GPS Sea water 5.23 GPS
D-81 0.00 GPS With 2% CaCI2 to give 1% BWOC
D-47 0.01 GPS Class G cement