(a) Traffic Section. This section is responsible for initial receipt of items,
checking and inspection of documents. It is also responsible to carry out quality
inspection of the items / stores and endorsing the Certificate of Conformance.
Endorsing the Certificate of Conformance means that item has passed all the
quality checks and is now ready to be shipped to end user or to be stored in
warehouse as serviceable balance.
3. The process starts with physical receipt of items in the traffic section. Once an
item is received, the packing is opened and item is matched and inspected with the
sources documents (documents provided by OEM) as highlighted at step 3 of process
Page 1 of 4
map. This usually takes about an average of 2 hours. After thorough scrutiny of the
documents, the item is then placed at quality inspection bay for quality inspectors to
check the items.
4. The quality inspectors carry out functional check of the items usually on test
benches and testers. This step (step 5) is carefully carried out to ensure that items
conform as per the OEM standards. An average of 2 hours are required to perform the
functional check of each item. If the items conform to the OEM standards then
Certificate of Conformance is endorsed by quality inspectors (step 6), otherwise, the
item is dispatched back to OEM and warranty claim is initiated.
5. After the quality inspector has endorsed the item, the quantity of item as per
documents is added to the overall serviceable balance on ERP and temporary
warehouse location on ERP is allocated by Traffic Section staff (step 7). The item is
then transported to the warehouse to be handed over to the warehouse staff (step 8).
(a) The 2 activities of inspecting sources documents and carrying out quality
inspection have been combined (to be performed simultaneously). This not only
eliminates the delay previously being observed at Quality Inspection Bay but also
reduces the overall average time from 5 hours to 2 hours (an improvement of 3
hours).
9. Overall, an improvement of 3.5 hours has been made in the complete business