Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

ASUMBI GIRLS HIGH SCHOOL

TERM 2 – DECEMBER 2021


FORM 4 - MATHEMATICS PAPER 1

MARKING SCHEME

NO. WORKING MARKS COMMENTS


1 5 x6 +(-76) ÷ 4 +27÷ 3
-15÷ 3x (-4)
= 30 + (-19) + 9 M1 For numerator
-5 x-4 M1 For denominator
20
= 20 = 1 A1 3
2 2268= 22 x 34 x 7 B1

X = 22 x34 x 72 = 7 M1 A1
22 x34 x7 3
3 Amt in Ksh = 5000 x 114.2 M1
= 571000
Remainder = 571000-276100
= 303900
Amt in Euros = 303900
101.30 M1
= 3000 Euros A1
3
2
4 2x + 3x -2 = (2x -1)( x+ 2) M1 Factorizing numerator
X3-4x x( x2 -4)

= (2x -1)( x+ 2)
x( x -2)( x + 2)
M1 Factorizing denominator
= 2x - 1
X( x- 2) A1 Simplified expression
3
5 179 - 3 = 176
234 – 3 = 231
176 = 24 x 11
234 = 3 x 7 x 11 B1 For GCD
GCD = 11
176 231 M1
Number of pieces = +
11 11
= 16 + 21 A1
= 37 3
6
1 - 3 (1) n 242
= 243

( 13 ) n
=1-
242
243
M1

1
= 243
M1

( 13 ) = ( 13 )
n 5

A1
3
∴ n =5

7 4− y 9−2 y 1
4
- 3
=
2
3(4-y) – 4(9-2y) =6 M1 For removal of denom.
M1  Opening of
12-3y -36 +8y = 6 brackets
5y =30
Y=6 A1 3 c.a.o.
8 B1 For locus (i)
B1 For locus (ii)
B1 For locus (iii)
B1 4 For the region

9 1 1
=
0.325 3.25× 10−1
= 0.3077×10 1 B1 For reciprocal with
= 3.077 evidence of working
M1
√ 0.25 = 0.5×3.077
0.325 A1 3
= 1.5385
= 1.5
10 External area = 20.1 × 2.2 = 44.22
Internal area = 19.1 × 1.2 = 22.92 0.5
Area of path = 44.22 – 22.92 M1 0.5
= 21.3 m 2 A1
2
11 ×+× +60 = 180° M1
2X = 120˚
X = 60˚
Exterior =60
M1
360 A1 3
No. of sides =
60
= 6 sides

12
B1 Sides
B1 Broken lines
B1 Shape of solid

13 Total = 42×24 = 1008 M1


Total with abs = 1008-65
= 943
943 M1 A1
Average = =41
23 3

14 2x 2
γ= +
3 3 B1
−3
Gradient = M1
2
γ−2 −3
=
x−−3 2
2(γ -2) = -3(x+3) A1 3
2γ – 4 = -3x – 9
3x + 2γ = -5
15 B = A2 + C−1
For c−1
( )( ) ( )
4 3 4 3 −2 −7 B1
= +
−1 2 −1 2 1 3
M1 M1 - Squaring A
= (
13 18
−6 1 )( + )−2 −7
1 3
A1
- Addition

4
= (
11 11
−5 4 )
16
B1 For B

B1 For C

(i) AC = 7.2km B1
(ii) Bearing 273˚ B1
4
17a X = 100-78 M1
= 22 A1

b Modal class 35-44 B1

c x f cf d fd
15-24 19.5 6 6 -40 -240 B1 For vcf
25-34 29.5 14 20 -30 -420
35-44 39.5 24 44 -20 -480 B1 For fd
45-54 49.5 14 58 -10 -140
55-64 59.5 22 80 0 0
65-74 69.5 10 90 10 100
75-84 79.5 6 96 20 120
85-94 89.5 4 100 30 120 ❑
B1
100 -940 For ∑ fd = -940

50−44
Median = 44.5 + × 10 M1
14
6
= 44.5 + × 10
14 A1
= 44.5 + 4.29
d = 48.79

∑ fd M1
Mean = +A
Σf A1
940 10
= 59.5 -
100
= 50.1

18a AC = √ 242 +182 M1


= 30cm

1
AO = × 30 = 15
2
M1
H = √ 362−15 2
= √ 1071
A1
= 32.73
b M1 -For volume of big
M1 M1 pyramid
1 1 32.73 -For volume of small
V=( × 24 × 18 × 32.73) – ( × 8 × 6 × )
3 3 3 A1 pyramid
= 4713.12 – 174.56 -For difference
c = 790.68
=790.7

X = √ 362−122 M1 M1
= √ 1152
= 33.94 A1 10 -Area of Δ
1 -Sum of areas
S.A = × 24 × 33.94 × 4 + 24×16
2
= 2061 cm2

19a FH = √ 102 +102 M1


= √ 200 = 14.14 A1

HM = √ 52 +14.142 M1
A1
= √ 225 = 15 cm
b
˂ between HM & ABCD
= ˂ between HM & EFGH
5
tanθ = M1
14.14 A1
θ = 19.47˚
c
M1
5 A1
sin α =
15
α = 19.47˚ M1
¿ between HM & MC A1 10
= 2 × 19.47
= 38.94˚
20a x 1.0 1.5 2.0 2.5 3 3.5 4.0 4.5 5.0 5.5 6.0 B1 for any 5 correct
.
0 B1
y 13 18.75 26 34.7 4 56.75 7 84.75 101 118.75 138
5 5 0

b 1 M1
Area = × 1 × [ 13+138+2 ( 26+70+ 45+101 ) ] A1
2
c = 317.5 sq. units
M1
A1
d Area = 1[ 18.75+34.75+56.75+ 84.75+118.75 ]

= 313.75 sq. units


M1
A1
6
e Exact area =∫ 3 X + 4 X + 6 dx M1
2

1 A1
10

6
=[ X 3 +2 X 2 +6 X +c ] 1

= 315 sq. units

317.5−315
% error = × 100
315
= 0.7935%

21a
A
−1
= ( 3 −4
−2 3 ) B1

b M1
( 90 120
200 300 )( ) (
X
Y
=
36000
850000 )
Δ = 27000-24000=3000
B1 M1
1
3000 (−200
300
)(
−120 90 120 X
90 200 300 Y
= )( )
1
3000 (−200
300
)(
−120 36000
90 850000 ) M1
A1

( YX )= 3000
1 6000000
( 4500000) B1

=(
1500 )
2000
c

Cost of 1 bag of beans sh. 2000


Cost of 1 bag of rice sh. 1500 M1

4
Cost of 1 bag of beans =2000 × M1
5
= 1600 A1
120 10
Cost of 1 bag of rice = 1500 ×
100
= 1800
He 2
1600 × 20 + 1800 × 30
= sh. 86000
22a 1
Distance travelled = 48 ×
4
= 12km M1
B to C =70-12 A1
= 58 km
b M1
30
Time taken between C and D = A1
45
2
= hrs
3
c = 40mins M1

88+12 M1
Total time = M1
50
= 2Hrs
Distance between C and D = 58Km
A1
Time = ( 2 hrs−55 mins )+ 7mins
= 1hr 12mins
d
1
Speed = 48 Km/h M1
3 A1 10
100
Time = ×1
54
23
=1 hrs
27
23a i) PQ = q – p B1
ii) PM = PO + OM
1 B1
= -P + Q
2
iii) ON = OP + PN
2
=P+ PQ
3
2
= P + ( q− p )
3
2 2 B1
=P+ q- p
3 3
b
1 2
= p + q B1
3 3

i) OX = m ON
B1
1 2
= mP+ mq
3 3
c ii) OX = OP + PX M1
= p + n PM
1
= p + n(-P + q)
2 M1

1 2 1
mP + mq = (1-n)p + nq
3 3 2
1 A1
m = 1-n
3
2 1 4
m= n . n= m
3 2 3 B1
1 4 B1 10
m=1- m
3 3
5
m=1
3
3
m=
5
4 3
n= .
3 5
4
=
5
3
Ratio : 1 = 3:5
5
24a 28 B1 For 28
w= 28
X B1
For
b X
M1 M1
Area = ( x−1 ) ( 28
x
−1 =)3600
200
For
3600
200
and area

( x−1 ) ( 28x −1) = 18


28 M1
28 – x - + 1 – 18 = 0
x
28
-x - + 11 = 0
x M1
2
x + 28 - 11 x = 0
2
x - 11 x + 28 = 0 A1
2
x - 7 x - 4 x + 28 = 0
x ( x −7 ) - 4( x−7 ) = 0 M1
( x−7 ) ( x−4 ) = 0
x = 7 or x = 4 M1 Accept alt
Length = 7m
A1 10
Area not previously covered = 28 – 18 m 2
= 10 m 2
Cost = 10 × ( 200+150 )
= 10 × 350
= sh. 3500

You might also like