VETTING PENDING LIST

PROGR. N. /
DOC. TYPE

ONEDRIVE
PROJECT

RECEIPT
ASSIGNED STAFF (Head
DOC.

YEAR

DATE
LINK
TO
SN
SN DETAILS OF SUBJECT SN of Department or Senior DEADLINE
TYPE
Expert in-charge)

- - - - - - --- --- --- --- --- --- --- ---

1 139 KKRP TEAM DG 24 72 16-Feb-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK842+943.00 TC 866 E. SHERIF 8-Mar-24 53

2 140 KKRP TEAM DG 24 73 16-Feb-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK846+809.00 TC 867 E. SHERIF 8-Mar-24 53

3 141 KKRP TEAM DG 24 74 16-Feb-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK849+853.00 TC 868 E. SHERIF 8-Mar-24 53

4 148 KKRP TEAM DG 24 83 19-Feb-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK837+856.90 TC 869 E. SHERIF 11-Mar-24 50

5 171 KKRP TEAM DG 24 103 29-Feb-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT D1K823+217.90 TC 927 E. SHERIF 21-Mar-24 40

6 173 KKRP TEAM DG 24 105 4-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK829+650.00. TC 902 E. SHERIF 25-Mar-24 36

7 178 KKRP TEAM DG 24 111 8-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT D1K818+156.60 TC 903 E. SHERIF 29-Mar-24 32

8 179 KKRP TEAM DG 24 112 8-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK812+346.70 TC 904 E. SHERIF 29-Mar-24 32

9 180 KKRP TEAM DG 24 113 8-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK814+326.00 TC 927 E. SHERIF 29-Mar-24 32

10 181 KKRP TEAM DG 24 114 8-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK830+190.00 TC 927 E. SHERIF 29-Mar-24 32

11 189 KKRP TEAM DG 24 121 14-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK954+116.00 TC 905 E. SHERIF 4-Apr-24 26

12 190 KKRP TEAM DG 24 122 14-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK841+950.00 TC 906 E. SHERIF 4-Apr-24 26

13 191 KKRP TEAM DG 24 123 15-Mar-24 REVISED PRELIMINARY MASTER PLAN OF ZARIA STATION. TC 882 A. PREVITI 5-Apr-24 25

SUBMISSION OF THE REVISED HYDRAULIC CALCULATION OF DK767+230-


14 193 KKRP TEAM DG 24 125 18-Mar-24 TC 884 G. FESTA 8-Apr-24 22
DK788+000 SECTION (CULVERT)

15 197 KKRP TEAM DG 24 129 25-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT D1K819+591.00 TC 907 E. SHERIF 15-Apr-24 15

16 198 KKRP TEAM DG 24 130 25-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK801+464.00 TC 908 E. SHERIF 15-Apr-24 15

17 199 KKRP TEAM DG 24 131 25-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK802+235.00 TC 927 E. SHERIF 15-Apr-24 15

18 200 KKRP TEAM DG 24 132 25-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK807+998.00 TC 927 E. SHERIF 15-Apr-24 15

19 201 KKRP TEAM DG 24 133 25-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK832+160.00 TC 909 E. SHERIF 15-Apr-24 15

20 202 KKRP TEAM DG 24 134 25-Mar-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK866+220.0 TC 910 E. SHERIF 15-Apr-24 15

SUBMISSION OF REVISED CULVERT CONSTRUCTION DRAWINGS FOR CULVERT


21 203 KKRP TEAM DG 24 135 26-Mar-24 TC 888 S. ORIOLI 16-Apr-24 14
NO.157N (DK900+654.0)
SUBMISSION OF DESIGN DRAWINGS OF HIGHWAY BRIDGE ROAD DIVERSION AT
22 207 KKRP TEAM DG 24 139 27-Mar-24 TC 892 S. ORIOLI 17-Apr-24 13
DK848+059.28

23 211 KKRP TEAM DG 24 144 4-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK827+800.00 0 000 E. SHERIF 25-Apr-24 5

24 212 KKRP TEAM DG 24 145 2-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK837+342.70 0 000 E. SHERIF 23-Apr-24 7

SUBMISSION OF THE PRELIMINARY DESIGN DRAWINGS OF LOCOMOTIVES,


25 216 KKRP TEAM DG 24 146 3-Apr-24 TC 899 M. MALLARDO 24-Apr-24 6
ROLLING STOCK AND MACHINERY FACILITIES

26 217 KKRP TEAM DG 24 147 3-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK796+878.00 0 000 E. SHERIF 24-Apr-24 6
VETTING PENDING LIST

PROGR. N. /
DOC. TYPE

ONEDRIVE
PROJECT

RECEIPT
ASSIGNED STAFF (Head
DOC.

YEAR

DATE
LINK
TO
SN
SN DETAILS OF SUBJECT SN of Department or Senior DEADLINE
TYPE
Expert in-charge)

27 218 KKRP TEAM DG 24 148 3-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK860+502.80 0 000 E. SHERIF 24-Apr-24 6

SUBMISSION OF THE REVISED VERSION OF THE CONSTRUCTION DRAWING OF


28 221 KKRP TEAM DG 24 153 3-Apr-24 CULVERTS NO. 228 DK942+388.5, NO. 229 DK942+889.1, NO. 231 DK943+508.6, AND TC 911 S. ORIOLI 24-Apr-24 6
NO. 250 DK955+040.5
SUBMISSION OF 3 NOS. REVISED CULVERT CONSTRUCTION DRAWINGS OF
29 222 KKRP TEAM DG 24 155 5-Apr-24 TC 912 S. ORIOLI 26-Apr-24 4
KADUNA-KANO SECTION (CULVERT NO. 212, 223, 238)

SUBMISSION OF 1 NO. REVISED CULVERT CONSTRUCTION DRAWINGS OF DK910-


30 223 KKRP TEAM DG 24 156 5-Apr-24 TC 913 S. ORIOLI 26-Apr-24 4
DK922 OF KADUNA-KANO SECTION (CULVERT NO. 183)

SUBMISSION OF 2 NOS. REVISED CULVERT CONSTRUCTION DRAWINGS OF DK910-


31 224 KKRP TEAM DG 24 157 5-Apr-24 TC 914 S. ORIOLI 26-Apr-24 4
DK922 OF KADUNA-KANO SECTION (CULVERT NO. 178 & 181)

SUBMISSION OF THE REVISED VERSION OF THE CONSTRUCTION DRAWINGS OF


32 226 KKRP TEAM DG 24 159 5-Apr-24 TC 916 S. ORIOLI 26-Apr-24 4
CULVERT NO. 271 (DK964+769.2)

SUBMISSION OF COMPLETE CULVERT CONSTRUCTION DRAWINGS OF DK841+800-


33 227 KKRP TEAM DG 24 160 7-Apr-24 TC 917 S. ORIOLI 28-Apr-24 2
DK854+000 OF KADUNA- KANO SECTION (CULVERT NO. 093)

SUBMISSION OF COMPLETE CULVERT CONSTRUCTION DRAWINGS OF DK829+000-


34 228 KKRP TEAM DG 24 162 8-Apr-24 TC 918 S. ORIOLI 29-Apr-24 1
DK841+800 OF KADUNA-KANO SECTION (CULVERT NO. 87N)

SUBMISSION OF SUBGRADE ENGINEERING DESIGN DRAWING AND


35 230 KKRP TEAM DG 24 143 2-Apr-24 TC 920 C. GULLINI 23-Apr-24 7
GEOTECHNICAL ANALYSIS (DK768++200- DK771+800, DK781+800- DK788+000)

SUBMISSION OF 1 NO. REVISED FRAME BRIDGE CONSTRUCTION DRAWINGS OF


36 231 KKRP TEAM DG 24 161 7-Apr-24 TC 921 S. ORIOLI 28-Apr-24 2
DK841-DK854 OF KADUNA-KANO SECTION (FRAME BRIDGE NO. 21N)

37 232 KKRP TEAM DG 24 164 12-Apr-24 SUBMISSION OF CONSTRUCTION DRAWINGS OF RIGASA STATION TC 922 B. TONINI 3-May-24 -3

SUBMISSION OF DESIGN DRAWINGS FOR HIGHWAY BRIDGE ROAD DIVERSION AT


38 233 KKRP TEAM DG 24 165 15-Apr-24 TC 923 S. ORIOLI 6-May-24 -6
DK809+665.00

SUBMISSION OF A REVISED CULVERT CONSTRUCTION DRAWINGS OF


39 235 KKRP TEAM DG 24 167 15-Apr-24 TC 925 S. ORIOLI 6-May-24 -6
D1K817+000- DK829+000 OF KADUNA-KANO SECTION (CULVERT NO. 067)

SUBMISSION OF 1 NO. COMPLETE FRAME BRIDGE CONSTRUCTION DRAWING OF


40 236 KKRP TEAM DG 24 168 18-Apr-24 TC 926 S. ORIOLI 9-May-24 -9
DK841- DK854 OF KADUNA-KANO SECTION (FRAME BRIDGE NO. 19N)

SUBMISSION OF 1 NO. COMPLETE FRAME BRIDGE CONSTRUCTION DRAWINGS OF


41 237 KKRP TEAM DG 24 169 19-Apr-24 TC 928 S. ORIOLI 10-May-24 -10
DK829- DK841 OF KADUNA-KANO SECTION (FRAME BRIDGE NO. 019)

42 238 KKRP TEAM DG 24 170 22-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK797+866.00 0 000 E. SHERIF 13-May-24 -13

43 239 KKRP TEAM DG 24 171 22-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK798+723.60 0 000 E. SHERIF 13-May-24 -13

44 240 KKRP TEAM DG 24 172 23-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK958+608.30 0 000 E. SHERIF 14-May-24 -14

45 241 KKRP TEAM DG 24 173 22-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK844+225.50 0 000 E. SHERIF 13-May-24 -13

46 242 KKRP TEAM DG 24 174 22-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK856+800.00 0 000 E. SHERIF 13-May-24 -13
VETTING PENDING LIST

PROGR. N. /
DOC. TYPE

ONEDRIVE
PROJECT

RECEIPT
ASSIGNED STAFF (Head
DOC.

YEAR

DATE
LINK
TO
SN
SN DETAILS OF SUBJECT SN of Department or Senior DEADLINE
TYPE
Expert in-charge)

47 243 KKRP TEAM DG 24 176 29-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT D1K822+927.00 0 000 E. SHERIF 20-May-24 -20

48 244 KKRP TEAM DG 24 177 29-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK847+279.00 0 000 E. SHERIF 20-May-24 -20

SUBMISSION OF SUBGRADE ENGINEERING DESIGN DRAWING AND MAP OF


49 245 KKRP TEAM DG 24 178 29-Apr-24 DRAINAGE SYSTEM WITHIN THE RIGHT-OF-WAY (ROAD DIVERSION AT TC 929 C. GULLINI 20-May-24 -20
DK791+713.20)
SUBMISSION OF SUBGRADE ENGINEERING DESIGN DRAWING AND MAP OF
50 246 KKRP TEAM DG 24 179 29-Apr-24 DRAINAGE SYSTEM WITHIN THE RIGHT-OF-WAY (ROAD DIVERSION AT TC 930 C. GULLINI 20-May-24 -20
D1K824+086.00)

51 247 KKRP TEAM DG 24 181 29-Apr-24 SUBMISSION OF DESIGN DRAWINGS FOR ROAD DIVERSION AT DK806+620.18 0 000 E. SHERIF 20-May-24 -20

52 - - - - - - - - - - - - x

53 - - - - - - - - - - - - x

54 - - - - - - - - - - - - x

55 - - - - - - - - - - - - x

56 - - - - - - - - - - - - x

57 - - - - - - - - - - - - x

58 - - - - - - - - - - - - x

59 - - - - - - - - - - - - x

60 - - - - - - - - - - - - x

61 - - - - - - - - - - - - x

62 - - - - - - - - - - - - x

63 - - - - - - - - - - - - x

64 - - - - - - - - - - - - x

65 - - - - - - - - - - - - x

66 - - - - - - - - - - - - x

67 - - - - - - - - - - - - x

68 - - - - - - - - - - - - x

69 - - - - - - - - - - - - x

70 - - - - - - - - - - - - x

71 - - - - - - - - - - - - x

72 - - - - - - - - - - - - x
VETTING PENDING LIST

PROGR. N. /
DOC. TYPE

ONEDRIVE
PROJECT

RECEIPT
ASSIGNED STAFF (Head
DOC.

YEAR

DATE
LINK
TO
SN
SN DETAILS OF SUBJECT SN of Department or Senior DEADLINE
TYPE
Expert in-charge)

73 - - - - - - - - - - - - x

74 - - - - - - - - - - - - x

75 - - - - - - - - - - - - x

76 - - - - - - - - - - - - x

77 - - - - - - - - - - - - x

78 - - - - - - - - - - - - x

79 - - - - - - - - - - - - x

80 - - - - - - - - - - - - x

81 - - - - - - - - - - - - x

82 - - - - - - - - - - - - x

83 - - - - - - - - - - - - x

84 - - - - - - - - - - - - x

85 - - - - - - - - - - - - x

86 - - - - - - - - - - - - x

87 - - - - - - - - - - - - x

88 - - - - - - - - - - - - x

89 - - - - - - - - - - - - x

90 - - - - - - - - - - - - x

91 - - - - - - - - - - - - x

92 - - - - - - - - - - - - x

93 - - - - - - - - - - - - x

94 - - - - - - - - - - - - x

95 - - - - - - - - - - - - x

96 - - - - - - - - - - - - x

97 - - - - - - - - - - - - x

98 - - - - - - - - - - - - x

99 - - - - - - - - - - - - x
VETTING PENDING LIST

PROGR. N. /
DOC. TYPE

ONEDRIVE
PROJECT

RECEIPT
ASSIGNED STAFF (Head
DOC.

YEAR

DATE
LINK
TO
SN
SN DETAILS OF SUBJECT SN of Department or Senior DEADLINE
TYPE
Expert in-charge)

100 - - - - - - - - - - - - x
866
867
868
869 836
927 837
902 840
903 888
904 892
927 912
927 913
905 914
906 916
882 917
884 918
907 921
908 923
927 925
927 826
909 928
910
888
892
0
0
899
0
0
911
912
913
914
916
917
918
920
921
922
923
925
926
928
0
0
0
0
0
0
0
929
930
0