Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

ICSS Software FAT

12th Dec – 28th Dec 2022

Emerson Classification:
Emerson Internal
Confidential 1
Safety Moments
Know Limitations
Take Health Breaks
“Have I been sitting for too long?”

Prolonged sitting can lead to many health


issues, so it is important to engage your leg
muscles frequently throughout the day

Encourage your coworkers to take quick


health breaks as well

A quick walk break improves your energy


level to fuel a productive day

Remember to follow Emerson’s 12 Lifesaving Behaviors

Emerson Classification:
Emerson Internal
Confidential 2
Emergency Evacuation Exits….
EMERGENCY EXIT DOOR

FAT Area

Warehouse/Plant Personnel
Assembly Area - 1

Secondary
Assembly

Assembly Area-2

If the fire alarm sounds, immediately leave the building


through the nearest exit as marked and proceed to the fire assembly area in the
warehouse parking lot as noted on the adjacent map. Do not return to the building until
the Fire Marshall has given the clearance.
Emerson Classification:
Emerson Internal
Confidential 3
Software Factory Acceptance Test Setup

Look for sign →

Lane – E, F
Emerson Classification:
Emerson Internal
Confidential 4
Software Factory Acceptance Plan

Emerson Classification:
Emerson Internal
Confidential 5
Emerson Team

DCS : Pavan Athare


SIS : Sonali Sahoo
Support : Sabir

Overall : Hemang Mehta


PM : Atul Nyayadhish

Support Technicians

Emerson Classification:
Emerson Internal
Confidential 6
FAT Daily Plan

UAE Time Zone (GMT + 4)

09.00 AM : Daily Meeting – Discussion on Progress


and Plan
09.15 AM : FAT (Respective Team Members)
12.30 PM : Lunch Time
01.15 PM : FAT (Respective Team Members)
04.30 PM : Day Closure

Emerson Classification:
Emerson Internal
Confidential 7
FAT Documentation

⚫ Emerson Test team member will have FAT MASTER copy. This will be marked up
with colors during FAT
– Green Highlight – Found OK
– Red – Correction in Document / Actual Hardware Update
⚫ The FAT procedure checklist will be signed by all members of Emerson, KBR,
TUV post completion of test
⚫ The Punch points will be recorded on Emerson’s Deviation Tracking App / Excel
Sheet.
⚫ FAT BASIS documentation will be agreed by all individual teams

Emerson Classification:
Emerson Internal
Confidential 8
Emerson Classification:
Emerson Internal
Confidential 9

You might also like