Professional Documents
Culture Documents
Feedback On Model V2
Feedback On Model V2
Railing to be Deleted
Lift machine room to
be deleted
Service floor to be
aligned with the balcony
above. Terrace to be
part of service floor
Delete the projection above
the service floor all around.
Please review the retail
profile line at the rear of the
building. Its not matching
with plans.
There will be false ceiling with
bulkhead aligned with the edge of
metal screen.
There will be false ceiling with
bulkhead aligned with the edge of
metal screen. Model false ceiling in
the corridors
There are some screens left in the
modelling, may be modelling issue,
please review and correct
Sitting to be arranged near to the
railing in between the façade
columns
Delete this column. It stops at
lower level
The façade band can be considered
at the floor above as its falling on
the refuge area
Please review the retail
profile line at the rear of the
building. Its not matching
with plans.