1 EARTHWORK IN
EXCAVATION
(a) for foundation
trenches
(A) by centre line 1 43.32 .92 .75 29.89
method (B) by long
&short wall method
Back and front of
rooms &verandah
front as long
walls...... 3 10.67 .92 .75
Partition and side of
rooms short........... 3 3.05 .92 .75
verandah sides, ------ T.L= ------ -------- 28.89
short........... 43.32 43.32 .75 .13
2. EARTHWORK IN
FILLING ---
(a) FOUNDATION 1/5TH OF THE (APPROX) = 6.00
EXCAVATIO
TRENCHES...... (b) N
PLINTH OF
ROOMS..... 2 .45 13.65
4.37
PLINTH OF 3.47
VERANDAH..... 1 .45 6.20
1.49 25.85
9.25 Cu m