Week 24-2023 JDL Activity Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Initial JDL

Week No. 24
DAILY ACTIVITY REPORT Date Cut-In 12-Jun-23

WEEK 24 - 2023 Date Cut-Off 11-Jun-23


Date Prepared 18-Jun-23
ENGINEERING DEPARTMENT JHUN MICHAEL D. LOCUS Checked by ASS
CAVITE PHILIPPINES OFFICE PROJECT ENGINEER Submitted To RDE
Date Project Specific Job Worked Time Notes & Remarks

12-Jun-23 22024 Finalizing PM4 Stock Chest Machine Chest Area Civil Guide and Sectional details 8:00 AM - 5:00 PM Start

Finalizing PM4 Stock Chest Machine Chest Area Civil Guide and Sectional details Finished

13-Jun-23 22024 Accumulating Reference for PM4 Stock Prep. Equipment & Civil Layout 8:00 AM - 5:00 PM Start

Accumulating Reference for PM4 Stock Prep. Equipment & Civil Layout Done

14-Jun-23 22024 Update on Revision 1 of PM4 Stock Prepr Machine Chest Area 8:00 AM - 5:00 PM Start

Confimartion on Equipment Foundation Sizes Draft Done

15-Jun-23 22024 PM 4 Stock Prepr Equipment Layout ELE. +6 and +7.5 8:00 AM - 5:00 PM Start

PM 4 Stock Prepr Equipment Layout ELE. +6 and +7.5 Draft Done

16-Jun-23 22024 PM 4 Stock Prepr Equipment Layout ELE. +6 and +7.5 8:00 AM - 5:00 PM Draft Done

PPI-OFFICE General Meeting Finished

PM 4 Soleplate General Layout @ Lev. +6.0M Draft Done

17-Jun-23 - Rest Day

18-Jun-23 - Rest Day

Prepared By: Jhun Michael D. Locus Submitted To: PPI Office


Date: June 16, 2023 Date: June 16, 2023
Evaluation and Remarks:
Checked By: Arnold S. Sapanta 1-
Date: June 16, 2023 2-

Week 24-2023 JDL Activity Report Page 1 of 1