Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming
that the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further
information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’
while completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the
relevant resources section for this qualification on the NEBOSH website.
Part 1: Background
The current project I have selected for risk assessment is a highway extension in
Kazhakuttom – Attingal. In this National Highway 66 Extension, many activities are
General description of the organisation
ongoing in the site such as Excavation work, Piling work, Construction of Service road,
Construction of fly over, Drainage works, Electrical work ... Etc. In this activity they are
used equipment like Road Roller, Loaders, MEWPs, Forklifts, Backhoe Loader, Mobile
Cranes, Semi Trucks, Excavators, Tower cranes, Concrete mixers, Power tools...Etc.
The work will normally shift bases, 2 shifts are in this project 8am to 6pm and 8pm to
6am, 9hrs duty and 1hr break, Weekly six days are working, Normally Sundays and
national Holidays are off duty for workers and staffs.
Then I visit the worksite and visually inspect the whole worksite. After my inspection,
some good practices and some unsafe actions were noticed. Then I have interviewed
with the Project Manager and after that, I interacted with the HSE Supervisor, Site
Supervisors and finally the Workers, then I understood they have only little knowledge
about health and safety in the worksite.
However, noticed some hazards and risks at the workplace, which need to immediate
action to avoid accidents and need to put control measures against those hazards& risk.
After that my inspection in the workplace, there are already some control measures are
provided to control the risk but I find some drawbacks of those control measures and I
have decide to provide future control measures to control the hazards in the workplace.
Who might be What are you already What further controls/actions Timescales Responsible
Hazard category harmed and how? doing? are required? for further person’s job title
and hazard actions to be
completed
(within …)
1. Movement of Drivers/Operators, Flag Man, Sign Construct Service roads 2 month Construction
People and pedestrian, board and and pedestrian walkways Manager
Vehicle visitors, and all barricades are for temporary public and
nearby worker provided for traffic vehicle movements.
Collisions with control but not
Pedestrians and There is a chance effectively Install pedestrian 2 week Construction
collision with of collision with barriers and separate Manager
other vehicles pedestrians and Regularly Tool box access ways for
collision with other talk are conduct by pedestrian and vehicles
vehicles because site manager in
movement of worksite Establish one way traffic 2 week Construction
people and system at the worksite Manager
vehicles in a same Regularly Safety
pathway.These training and Provide adequate
situation may leads Instructions are Illumination system in
to, major Injuries, 1 week Site Engineer
provided the worksite for night
head injuries, bone construction and clear
fractures, internal visibility for public,
injuries or It can Passengers...Etc
even leads to
fatalities...Etc Inform the public about 2 weeks Construction
the ongoing road Manager
3.Noise Operators, Nearby Isolate the work In rush traffic hours 1 week Construction
Workers and Public area from other sound activity works Manager
Excessive worker and public shall be avoided
noise(above 85 Exposure of
dB) from Piling excessive noise will
Provide sufficient Temporary noise barriers 1 week
activity affect the hearing Civil Engineer
capacity; It may break system during should be provided in
cause short time the work time to the particular area
hearing loss or involved workers
4. Vibration Operators Isolate the work Purchase Low level 3 Week Purchase Manager
area from other Vibration equipment it
When workers Exposure of worker and public can reduce transmission
using the Power excessive vibration
Provide adequate
training to operators 1 week HSE Officer
about risk of work and
how to work safe in the
work place
6.Electricity Portable tools Warning sign Provide double insulation 2 week Electrical Engineer
operators ,all boards are provided wires for hand-held
There are some nearby workers, in exact location electrical equipment and
temporary visitors and electrical lead cables
connections were pedestrians
Regularly Safety
at the worksite for
the construction These situation
training and Arrange a store room to
purpose, the leads to electrical Instructions are keep electrical 2 week Construction
cables are not shock can cause provided equipments safe Manager
adequately death or Cardiac
insulated and arrest, Muscle Supervisor and Implement PAT test for
some hand-held contractions, competent person all portable equipment 2 weeks plant engineer
equipment external Respiratory failures, are available to give
covers and wires severe burn...Etc instructions
are damaged Arrange third party
inspection for all new
1 week Construction
electrical equipment use
manager
in worksite
7.Confined Space Workers who work Warning Sign Marked and fix around 1 week Civil engineer
in Confined space boards are provided the confined space use
Workers can fall and nearby during the work rigid barricades
into uncovered workers, engineers,
Manhole or supervisors,
Maintain the Gas monitoring test are
Unstable ground managers 1 week Plant Engineer
can leads to
Communication taken before entering the
collapse or In Confined space between worker Manhole
trapping workers there might be inside and outside
inside confined presence of toxic person Must need to Implement 1 week Site engineer
space gases, it may leads Permit to work system
to death, Chances of Adequate
falling it may leads supervision is Appoint Competent
major injury or provided person as hole watcher 1 week Construction
fractures, Chances of to watch the activities in manager
fire and explosion, confined space
Poor ventilation,
Oxygen deficiency
its leads to health
Emergency rescue plan 2 week Construction
injuries. are need to implement manager
and arrange rescue
equipment like hardness,
Tripods and Self
9.Fire Workers, Nearby Emergency fire exist Conduct regularly 1 week Plant Engineer
workers, Visitors, and fire Assembly inspection and
Rough use of and Public point are provided maintenance of all
Electrical electrical equipment to
equipment, Hot Hot work such as
work, ignition from welding, grinding, Appropriate fire prevent sparks, heats,
nearby vehicles, cutting metals and extinguisher are other mechanical issues
Cigarette Smoking Steel pipes, and provided leads to fire
in the worksite rough uses of the
electrical equipment, No smoking sign Arrange Flammable 1 week Site Engineer
Smoking in worksite boards are materials are stored
may cause fire in the displayed in securely under
construction site it worksite responsible person
leads to death or
burn injuries can
Provide fire emergency
effect muscles, 1 week Site Engineer
. escape routes,
nerves, blood
vessels and Emergency contact
Respiratory number at worksite
issues...Etc
Conduct annual
10.Hazardes Operators, Nearby Regularly Sprayed Isolated the area from 1 week Civil engineer
Substance workers and public water on the ground public and other workers
by using Barricades
Dust releasing Releasing of fine
Job rotation are
from during particle of dust from
excavation, the worksite leads to
provided Arrange vacuum or 1 week Construction
demolition of respiratory issues, , water trucks to clean the Manager
existing road, skin irritation, lung PPEs are provided road surface regularly
during sub base cancer, eye irritations but not effectively
Arrange Supervision
when the weather 1 week Site Supervisor
condition is bad (Rainy
season)
12.Load Handling Workers moving Barricades are used Use rigid barricades 2 week Civil engineer
Equipments under the boom but not effectively around the boom radius
radius, nearby (tape barricade) of mobile crane to avoid
Lifting and moving workers, visitors entry of unauthorized
heavy materials in
13. Health, All workers in the Toilet facilities are Shall be provide an 1 month Electrical Engineer
Welfare and Work worksite and staffs provided but not adequate illumination on
Environment enough for as per welfare areas
Insufficient welfare the requirement
Insufficient First- facilities in the
Aid facilities, worksite will affect Shall be provide 1 month Project Manger
Lighting facilities, the behaviour of the Provided job shifts adequate ventilation rest
Toilet facilities and workers also in the worksite room and dining areas
Drinking water insufficient drinking
facilities water may cause PPEs are provided Shall be provide 1 month Project Manager
dehydration and poor separate toilet facilities
illumination on the like (gents and ladies
site may leads to separate)
accidents on
worksite. Shall be provide
2 months Project Manager
sufficient and clean
drinking water with water
sampling lab certification
Shall be provide
adequate First-Aid 1 week Project Manager
facilities and first aid
equipment.
Specific legal arguments According to ILO convention C167- Occupational Safety and Health
Convention,1981(No.167) article 26 mentioned on electricity are:-
All electrical equipment and installations shall be constructed, installed and
maintained by a competent person, and so used to guard against danger.
Before construction is commenced and during the progress thereof adequate steps
shall be taken to ascertain the presence of and guard against danger to workers
from any live electrical cable or apparatus, which is under, over or on the site.
The laying and maintenance of electrical cables and apparatus on construction sites
shall be governed by the technical rules and standards applied at the national level.
As per the ILO Code of practice, Safety and Health in construction (revised edition) 21.1.2.
mentioned on general description about electricity:-
All electrical equipments and installation should be constructed, installed and
maintained on construction sites by a competent person and compliance with
national laws and regulations and so used as to guard against danger, such as
electrical shock and fire and explosion.
In case, the company violates some of the above-mentioned arguments. It may cause any
harm like electrical shock to workers and its legally affect the organisation like prosecution,
fines, stop memo...Etc.
In the case of electrical shock occurs severity is depends upon the amount of current and
time of exposure, most of the case severity is very high because high voltage of electricity
are using for construction in the worksite also the weather condition like in rainy season the
risk is very high. It leads to severe burn, breathing issues, direct cardiac arrest, Muscle
contraction and may cause death.
How effective the action is likely to be in In the worksite, workers use electrical equipment very carelessly and cables are damage
controlling the risk. This should include: due to friction. Provide double insulation wires for hand-held electrical equipment and
the intended impact of the action; electrical lead cables, it can prevent the damage from friction and reduce risk from
justification for the timescale that electricity. Therefore, the risk of electrical shock can control to some extent.
you indicated in your risk
assessment; and I have allowed 2-week time to complete this task. I think it is the realistic time scale
whether you think the action will because the Electrical engineer needs time for set up and install the material. I hope it will
fully control the risk complete before the dead line I allowed.
With this, way to provide double insulation wires for hand-held electrical equipment and
electrical lead cables, we cannot control the risk completely. In addition to implement
further control measures from the above risk assessment table such as arrange a
Specific legal arguments According to ILO convention C167 article 15 (lifting appliance and gear) explains:
Every lifting appliance and item of lifting gear, including their constituent elements.
Attachments, anchorages and supports, shall -
Be of good design and construction ,sound material and adequate strength for the
purpose for which they are used;
Be properly installed and used;
Be maintained in good working order;
Be operated by workers who have received appropriate training in accordance with
national laws and regulations.
According to ILO recommendation R175 explain:
National laws or regulations should prescribe the lifting appliances and items of lifting gear
should be examined and tested by a competent person-
Before being taken into use for the first time;
After erection on a site;
Subsequently at intervals prescribe by such national law and regulations;
After any substantial alternation or repair
In case, the company violates some of the above-mentioned arguments. will leads to
accidents and they will face the legal actions from the legal authorities like Huge fines,
blacklisting, Imprisonments...Etc.
Consideration of likelihood AND severity Likelihood is categorised into Low, Medium, High and Very high, Here likelihood of the
risk is very high.
types of injury or ill health
The Mobile crane using at the worksite to lift heavy materials from ground to top of the fly
Low : no injury
Medium: minor injuries required first aid treatment or damaged
High: Injury requiring hospital treatment or damaged material/vehicles
Very high: catastrophic or death or irreparable damage
Everyday lifting work is done at the worksite, therefore If any heavy material falls from the
mobile crane, This can have a major impact on workers, property and vehicles operating
within the cranes boom radius and it will leads to property damage, vehicle damage, head
injuries, bone fractures, and even leads to death. The severity of this case it depends upon
the material size and the height from which it falls. Therefore, the severity of the accident is
very high.
How effective the action is likely to be in In the worksite, due to lack of adequate barricading in the place where is lifted by mobile
controlling the risk. This should include: crane, the risk of falling heavy materials over workers, public or vehicles is high. Provide
the intended impact of the action; rigid barricades around the boom radius of mobile crane to avoid entry of unauthorized
justification for the timescale that personnel. Hence, likelihood of the hazard can reduce.
you indicated in your risk
assessment; and I have allowed 2-week time to complete this task. I think it is the realistic time because the
whether you think the action will civil engineer needs time for arrange the rigid barricades from the store and fix it in exact
fully control the risk location. I hope it will complete before the deadline I allowed.
This action cannot control the risk completely. In addition to implement further control
measures from the above risk assessment table such as Install anemometer to identify the
wind speed, prepare a safe lifting plan, implement PTW in all high risk work in
worksite...Etc can control risk to an acceptable level.