WxW STUB SECTION

H L 130 X 130 X 10
HC
50

300
MC

GROUND LEVEL
1 1
BARS MKD C C
Ø STIRRIUPS `C & C1' Ø C1 BARS MKD 'E'
MKD. E , E1 BARS MKD `G'
0.3 @200mm c/c 9 Nos Ø12 @ 123mm C1 C1
W

X X1 c/c both ways


B2 BARS MKD 'E1'
H

Y Y1 0.3
C1
SB2

B1 C C
50
50

C.G 35.80 mm
SB1

100

HO

BARS MKD. `B' WORKING POINT


11 Nos Ø12 @ 279mm HO = 75 mm.
c/c both ways BARS MKD. `A'
MC = 300 mm.
BLOCK / TILES 26 Nos Ø12 @ 112mm
0.3 200 X 200 X 100 c/c both ways 0.3
LEAN CONCRETE BxB
W
HC
50
BARS MKD. `G'

350

300
MC

GROUND LEVEL
BARS MKD. `B'

C.G.
BARS MKD. `G'
9 Nos Ø12 @ 123mm
c/c both ways
BARS MKD. `B'
11 Nos Ø12 @ 279mm
c/c both ways
8 Dia 200
Rebar

52
CONCRETE VOLUME (m3) 12.314
LEAN CONCRETE VOL.(m3) 2.523 20 0
200
NEAT EXCAVATION VOL(m3) 126.2
BARS MKD. `A'

REINFORCEMENT STEEL (kg) 1160


1. ALL DIMENSIONS ARE IN mm. UNLESS OTHERWISE SPECIFIED.
0.3
2. DO NOT SCALE THE DRAWING.
3. FOUNDATION DESIGN IS AS PER BS 8110 PART - 1
4. GRADE OF CONCRETE : CUBE STRENGTH 25 Mpa AT 28 DAYS. ENGINEERING MANAGEMENT PROFESSIONAL ENGINEER
ENDORSEMENT: ENDORSEMENT:
5. GRADE OF REINFORCEMENT : Fe460, HAVING MINIMUM YIELD STRENGTH
= 460 N/mm^2 AS PER BS 4449
6. CONCRETE COVER FOR PROTECTION OF TOWER STEEL INCLUDING STUBS (MIN = 100MM);
COVER FOR REINFORCEMENT (MIN = 50mm TO TOP OR SIDE SURFACES,
BARS MKD. `A' MIN = 100mm TO BOTTOM SURFACES.
STUB DEPTH BELOW GROUND LEVEL = 3575 mm
26 Nos Ø12 @ 112mm
c/c both ways 7. NO LAPPING IS ALLOWED UNLESS OTHERWISE APPROVED BY EMPLOYER REPRESENTATIVES. MINIMUM LAPPING
FOR REINFORCEMENT SHALL BE 55 TIMES BAR DIAMETER. 0.3
8. SHORING SHALL BE PROVIDED AS PER THE APPROVED METHOD STATEMENT. 0.3 2
MAIN CONTRACTOR: CLIENT: Sarawak Energy Berhad PROJECT TITLE:
Project Execution, 6th Floor, DESIGNED BY : APPROVED BY : VS
Menara Sarawak Energy,
No. 1, The Isthmus, 93050 Kuching,
BUNUT TO MEDAMIT
REVISED AS PER COMMENTS SPP
Sarawak.
275kV TRANSMISSION LINE PROJECT DRAWN BY : CHKD. BY : SPP
FROM SEB DATED 06-09-2019
REVISED AS PER COMMENTS SPP
FROM SEB DATED 09-08-2019 DWG. TITLE: SCALE : NTS DATE : 27-06-2019
ISSUED FOR REVIEW SPP
KEC GHCS (MALAYSIA) SDN.BHD. HEAVY CONCRETE FOUNDATION FOR '2NS'
-3M BE TO +15M BE JOB NO.: SHEET NO. REV.
DESCRIPTION BY 1ST FLOOR, LOT 8663, NG JOO YAN, JALAN SIMPANG TIGA, KUCHING - 93200, SARAWAK, MALAYSIA
PLS160216-C-U-FN-0002 28 OF 29 0.3
E1
HOLE TO CENTER
LINE OF TOWER
C.L.
G.L.
CONCRETE LEVEL
GROUND LEVEL

H
WORKING
POINT
M1
HOLE TO CENTERLINE
OF TOWER

HOLE TO CENTER LINE


OF TOWER
M1
NE
LI
ER
NT R
CE W E
TO TO
L E OF
HO
ENGINEERING MANAGEMENT PROFESSIONAL ENGINEER
ENDORSEMENT: ENDORSEMENT:
MAIN CONTRACTOR: CLIENT: Sarawak Energy Berhad PROJECT TITLE:
Project Execution, 6th Floor, DESIGNED BY : APPROVED BY : VS
Menara Sarawak Energy,
No. 1, The Isthmus, 93050 Kuching,
BUNUT TO MEDAMIT
REVISED AS PER COMMENTS SPP
Sarawak.
275kV TRANSMISSION LINE PROJECT DRAWN BY : CHKD. BY : SPP
FROM SEB DATED 06-09-2019
REVISED AS PER COMMENTS SPP
FROM SEB DATED 09-08-2019 DWG. TITLE: SCALE : NTS DATE : 27-06-2019
ISSUED FOR REVIEW SPP
KEC GHCS (MALAYSIA) SDN.BHD. HEAVY CONCRETE FOUNDATION FOR '2NS'
-3M BE TO +15M BE JOB NO.: SHEET NO. REV.
DESCRIPTION BY 1ST FLOOR, LOT 8663, NG JOO YAN, JALAN SIMPANG TIGA, KUCHING - 93200, SARAWAK, MALAYSIA
PLS160216-C-U-FN-0002 29 OF 29 0.3