Method of Statement for L i f t i n g DG-301

Substation-2

PREPARED BY: TAMIMI Global Co. Ltd

Page 1 of 4
Contents:
Purpose................................................................................................

Location Of Site....................................................................................

Scope Of Work......................................................................................

Tools, Equipment & Machinery to be Deployed.....................................

Responsible Persons on Site..................................................................

Operators certification…………………………………………………………………………

Time line Schedule................................................................................

Page 2 of 4
Purpose:
The purpose of generating this method of statements is to define the procedure step by step to implement the correct
practices for Lifting the generator set (DG301) in switchgear-2

Location of Site
Substation-2 Saudi Aramco Jazan Camp

Scope of Work:
Electrical Side
 Rack out the DG301 incomer circuit breaker.
 Turn off all control supply in DG301 incomer switchgear panel.
 Turn off all control supply in generator controller panel.
 Disconnect all external control cables from the generator.
 Disconnect power cables from the generator.
 Remove grounding cables at the generator body.
Mechanical Side
 Disconnect battery connection inside the generator.
 Disconnect Diesel inlet valve from the generator.
 Ensure the good condition of lifting hooks.
 Lifting the generator set using crane.
Note: -
 Check area is clean for the positioning of lifting crane and generating set.
 Extra precaution to be taken before lifting generating set.
 Guide ropes shall be used to prevent the twisting or swinging of the set once it has been lifted clear of the
ground.
 Don’t attempt to lift the diesel generator set in the high wind.
 Placing of generator set shall be offered for inspection after all related work is completed.
 Ensure that the crane operating area is able to support the mass of the crane and the generator set .

Tools, Equipment & Machinery to be Employed:

Sr. No. Tools & Equipment/ Machinery Specification/Info Scope


1 Crane, Sling Belt, loader truck, All machines must have TAMIMI
Rigging shackles updated maintenance log
sheet and Saudi Aramco
approved
2 Lift operator Saudi Aramco Approved TAMIMI

3 Electrical Hand tools, TAMIMI


Equipment and Material Mechanical Hand tools,
Ladder
4 Safety items Safety Shoes, safety
helmets, gloves, fire
blanket, warning tape,
face Mask, Fire
Extinguisher

Page 3 of 4
Responsible Persons on Site:

Sr. No Job Title Qty Scope

1 General Supervisor 1 TAMIMI

2 Electrical Engineer 2 TAMIMI

3 Safety Officer 1 TAMIMI

4 Technician 4

5 Aramco approved and Certified Permit 1 TAMIMI


Receiver

Safety introduction: -
(All the necessary PPE’s used as Saudi Aramco Standards requirements)
1. Ensure adequate PPE for all personnel.
2. Ensure work area shall be free from debris and obstruction free.
3. Ensure all involved persons are aware of the same through tool box briefings
4. Ensure that tradesman will keep their working places clean, tidy and free from rubbish
5. Uniform, Vest, Shoes, Insulated gloves, Helmet
Note: -
Observed the safety practices as per the Saudi Aramco Safety Guidelines
Maintain proper housekeeping surrounding area of work place.
Fill all job safety analysis for the above tasks per SA procedures & permit system.

Time Schedule:
After approval

Page 4 of 4