Amendments in Technical Specification No.

- GETCO/E/4TS – SHR02/R7Jun’22 for 420kV, 50/63/80/125 MVAr Shunt Reactor, NGR & Surge arrester.

Sr Clause No. Instead of Read as


01 SECTION: I (iv) System fault level – 40 KA OPTION 1:
Cl. 1.6 (Shunt (v) Duration of Short circuit current – 03 second (iv) System fault level – 40 KA
Reactor) (v) Duration of Short circuit current – 03 second
Cl. 1.6.1 (iv & v)
OPTION 2:

The transformer and all its accessories including bushing /built in CTs etc. shall
be designed to withstand the thermal and mechanical effects of any external
short circuit to earth and of short circuits at the terminals of any winding without
damage. The transformer shall be designed to withstand the thermal
stress due to short circuit for a duration of 2 seconds and the same shall
be verified during design review. However, generator transformer and
associated auxiliary transformer shall be designed to withstand the
thermal stress due to short circuit for a duration of 3 seconds.

The following short circuit level shall be considered for the HV & IV System to
which the transformers will be connected:

765kV system - 63 kA for 1 sec (sym, rms, 3 phase fault)


400kV system - 63 kA for 1 sec (sym, rms, 3 phase fault
220kV system - 50 kA for 1 sec (sym, rms, 3 phase fault)
132kV system - 40 kA for 1 sec (sym, rms, 3 phase fault)
66kV system - 31.5 kA for 1 sec (sym, rms, 3 phase fault)

However, for transformer design purpose, the through fault current shall be
considered limited by the transformer self-impedance only (i.e. Zs = 0).

02 SECTION: I
Cl. 1.6 (Shunt Reactor rating in MVAr kW Reactor rating in MVAr kW
Reactor) 50 85 50 85
Cl. 1.6.1 (x) 63 117 63 100
80 135 80 115
125 185 125 160

03 SECTION: I Noise level at rated voltage and frequency – As per Maximum Noise level at rated voltage and frequency – 80 dB.
Cl. 1.6 (Shunt NEMA—TR-1
Reactor)
Cl. 1.6.1 (xix)
Sr Clause No. Instead of Read as
04 SECTION: I The bidder shall clearly guarantee in his bid that the OPTION 1:
Cl. 1.7 (Other equipment offered shall perform satisfactorily under both
requirements) the power frequency and switching such over voltages The bidder shall clearly guarantee in his bid that the equipment offered shall
Cl. 1.7.5 shall not cause any damage to the winding or perform satisfactorily under both the power frequency and switching such over
withstanding Thermal and mechanical effects of short voltages shall not cause any damage to the winding or withstanding Thermal
circuit at the terminals for a duration of 3 seconds without and mechanical effects of short circuit at the terminals for a duration of 3
any damage of distortion seconds without any damage of distortion.

OPTION 2:

The transformer and all its accessories including bushing /built in CTs etc. shall
be designed to withstand the thermal and mechanical effects of any external
short circuit to earth and of short circuits at the terminals of any winding without
damage. The transformer shall be designed to withstand the thermal
stress due to short circuit for a duration of 2 seconds and the same shall
be verified during design review. However, generator transformer and
associated auxiliary transformer shall be designed to withstand the
thermal stress due to short circuit for a duration of 3 seconds.

The following short circuit level shall be considered for the HV & IV System to
which the transformers will be connected:

765kV system - 63 kA for 1 sec (sym, rms, 3 phase fault)


400kV system - 63 kA for 1 sec (sym, rms, 3 phase fault
220kV system - 50 kA for 1 sec (sym, rms, 3 phase fault)
132kV system - 40 kA for 1 sec (sym, rms, 3 phase fault)
66kV system - 31.5 kA for 1 sec (sym, rms, 3 phase fault)

However, for transformer design purpose, the through fault current shall be
considered limited by the transformer self-impedance only (i.e. Zs = 0).
05 SECTION: II --- To be add: (vi) Conservator with air cell shall be provided with Air Cell Rupture
Cl. 2.4.5 (Oil preserving Relay. Suitable arrangement to be made to extend alarm signal to control
Equipment) / cl. (a) room.
06 SECTION: II The shunt reactor shall be designed with maximum The shunt reactor shall be designed with maximum permissible losses as
Cl. 2.29 (Reactor permissible losses as indicated below. indicated below.
losses & evaluation
of bids) Reactor rating in MVAr kW Reactor rating in MVAr kW
50 85 50 85
63 117 63 100
80 135 80 115
125 185 125 160

As we have specified fixed loss figures of total maximum As we have specified fixed loss figures of total maximum losses,
losses, manufacturers have to adhere to these figures by manufacturers have to adhere to these figures by designing shunt reactor
designing shunt reactor suitably. Bidder will not be asked suitably. Bidder will not be asked to give any loss figure in GTP. Therefore,
to give any loss figure in GTP. Therefore, there will be no there will be no capitalization at tender stage.
capitalization at tender stage.
The order will be placed to lowest price bidder as per The order will be placed to lowest price bidder as per GETCO policy and actual
GETCO policy and actual losses measured during losses measured during acceptance. It will be at discretion of GETCO to
acceptance. It will be at discretion of GETCO to accept/reject the unit whenever there is positive variation in the losses
accept/reject the unit whenever there is positive variation measured at actual.
in the losses measured at actual.
However, the unit shall not be accepted in the event However, the unit shall not be accepted in the event measured losses are
measured losses are beyond 5% of fixed loss figures beyond 2% of fixed loss figures specified above.
specified above.
Penalty towards the higher losses within above limits Penalty towards the higher losses within above limits shall be recovered
shall be recovered at a rate of 3 times capitalization at a rate of Rs.10,00,000/- per kW
cost of Rs. 3,33,000/- per kW

It is also proposed that testing of unit will be carried out It is also proposed that testing of unit will be carried out in presence and
in presence and witness of third party selected by witness of third party selected by GETCO at the discretion of GETCO.
GETCO at the discretion of GETCO.
In case of any order, the losses of successful bidder will be measured during
In case of any order, the losses of successful bidder will acceptance testing and if the figures of loses are found equal to or lesser than
be measured during acceptance testing and if the figures specified above, the shunt reactor shall be accepted. However, if any of the
of loses are found equal to or lesser than specified above, loss figure measured during acceptance test is found more than specified
the shunt reactor shall be accepted. However, if any of above, the shunt reactor will not be accepted. There shall be no provision for
the loss figure measured during acceptance test is found penalty for acceptance of shunt reactor with losses higher than specified
more than specified above, the shunt reactor will not be above. Bidder shall submit undertaking separately for the same, with the
accepted. There shall be no provision for penalty for technical bid. The measurement of losses shall be carried out with 3 (Three)
acceptance of shunt reactor with losses higher than Watt meter method only and CTs, PTs and meters used for these
specified above. Bidder shall submit undertaking measurements shall be of class of accuracy of 0.2.
separately for the same, with the technical bid. The
measurement of losses shall be carried out with 3 (Three)
Watt meter method only and CTs, PTs and meters used However, no weightage shall be given for supply of shunt reactor, with losses
for these measurements shall be of class of accuracy of (measured during routine tests) less than the above specified losses.
0.2.

However, no weightage shall be given for supply of shunt


reactor, with losses (measured during routine tests) less
than the above specified losses.

Note : The vacuum and pressure test on Transformer/Reactor tank is revised as per CEA guidelines.
Further, following clause are added & incorporated in Technical Specification.
Sr Description To be added
01 Core  Manufacturers of Stampings / Laminations / Cores of transformers (with or without winding) from CRGO/Amorphous material have to get
Certificate of Conformity (CoC) from Bureau of Indian Standard (BIS).
 Essential Requirements (As per Ministry of Steel, GOI Steel and Steel Products (Quality Control) Order, 2020 dated 27.05.2020: Table 2)

Sl.
Goods & Articles Essential Requirements ITC (HS) Code Date of Implementation
No.
1 Stampings / Made from BIS standard marked Grain Oriented 85049010 With immediate effects
Laminations / Electrical Steel Sheet and Strip confirming to IS 85049090
Cores of 3024:2015 or Cold rolled non-oriented electrical
transformers (with steel sheet and strip confirming to IS 648:2006 or
or without winding) Magnetic materials – specification for individual
material – Fe based amorphous strip delivered in
the semi-processed state confirming to IS
16585:2016.

02 NIFPS  The revised specification No: GETCO/E/TS-FF/2903/R3 June’2020 for the “Work of design, supply, erection and commissioning including
specification civil work of nitrogen injection system for protection against the fire & explosion for transformer” is incorporated in Transformer / Reactor
technical specification.

03 Insulation  The minimum satisfactory values for insulation Resistance at 30°C (one minute measurements) at the time of commissioning is as under,
Resistance
Rated Voltage class of winding Minimum desired IR value at 1 minute (Mega ohm)
11kV 500 MΩ
33kV 1000 MΩ
66kV & above 1500 MΩ

04 Polarization  The Polarization Index (PI) is the ratio of the 10 min to the 1 min mega-ohm readings.
Index Test
Polarization Index Insulation Condition
Less than 1 Dangerous
1.0 - 1.1 Poor
1.1 - 1.25 Questionable
1.25 - 2.0 Fair
2.0 – 4.0 Good
Above 4.0 Excellent
05 Tan Delta of  For Winding and bushings, the tan delta value shall not exceed 0.005 i.e. 0.5 % (during first charging).
Windings and
bushings
Dated: 08.09.2020

TTR validity amendment-1


(Addendum to Technical Specification for validity of type test reports
for major electrical equipments)

Sr. No. Name of test/ Equipment Type test reports


validity (In Years)

i. On Line Tap Changer (OLTC) 10


ii. Power Transf. Bushing/ Reactor 7
Bushing
iii. Transformer/reactor fittings and 10
accessories.
iv. Circuit Breaker 10
v. Isolators 10
vi. Lightning Arrestors 10
vii. Wave Trap 10
viii. Instrument Transformer 7
ix. Low Voltage (LV) & Medium 10
Voltage (MV) Switchgear
x. Cable & associated joints 10
xi. Capacitors 10
xii. Energy Meters [including smart 5
meters & Availability Based Tariff
(ABT) meters]
xiii. Conductors & earth wire 10
xiv. Insulators(Porcelain/ Glass) 10
xv. Composite Insulators 5
xvi. Power Line Carrier Communication 5
(PLCC)/Fibre Optic (FO)
cable/Optical Ground Wire
(OPGW)
xvii. Terminal connectors of all major 10
equipments including transformers

Note: Type test reports shall be valid as on the last date of submission of bid.
GETCO/E/4TS – SHR02/R7 Jun’22

GUJARAT ENERGY TRANSMISSION


CORPORATION LTD.
SARADAR PATEL VIDYUT BHAVAN,
RACE COURSE, BARODA – 390 007.

TECHNICAL SPECIFICATION
FOR

420 kV, 50, 63, 80 & 125 MVAr,


SHUNT REACTOR, NGR & SURGE
ARRESTER

GETCO/E/4TS – SHR02/R7 Jun’22

Sign & Seal of Bidder Page 1 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

SPECIAL INSTRUCTIONS TO BIDDER

Please read following instructions carefully before submitting your bid.

1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc.,
in AutoCAD format and manuals in PDF format, for offered item shall be
submitted. Also the hard copies as per specification shall be submitted.

2. The bidder shall submit Quality Assurance Plan with the technical bid.

3. The bidder shall have to submit all the required type test reports for the
offered item. In absence of this, the evaluation shall be carried out
accordingly as non-submission of type test reports.

4. The bidder must fill up all the points of GTP for offered item/s. Instead of
indicating “refer drawing, or as per IS/IEC”, the exact value/s must be
filled in.

5. All the points other than GTP, which are asked to confirm in technical
specifications must be submitted separately with the bid.

6. The bidder is required to impart training in view of manufacture,


assembly, erection, operation and maintenance for offered item, at his
works, to the person/s identified by GETCO, in the event of an order, free
of cost. The cost of logistics will be bear by GETCO.

7. Please note that the evaluation will be carried out on the strength of
content of bid only. No further correspondence will be made.

8. The bidder shall bring out all the technical deviation/s only at the
specified annexure.

Sign & Seal of Bidder Page 2 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

Note for RIP/ RIF/ RIS bushings :

If offered RIP/ RIF/ RIS bushings are to be supplied from Indian


manufacturing unit under technical collaboration with foreign OEM, then
type test reports & satisfactory performance certificate from their offered
country works of foreign OEM shall be considered valid for BID
evaluation. However, in event of order, following type test reports to be
submitted by Indian manufacturing unit having technical collaboration of
foreign OEM, before commencement of supply, without affective
delivery schedule, free of cost to GETCO.

a. Dielectric Test as per IEC 60137 (Latest Edition)


b. Temperature Rise Test as per IEC 60137 (Latest Edition)

Sign & Seal of Bidder Page 3 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

SECTION - I

Specific Technical Requirements and System particulars:

1.1.0 SCOPE:

This section covers the specific technical particulars, climatic and


Isoceraunic conditions, system particulars etc., suiting to which the shunt
reactor, NGR & SA as per the requirement given in the schedule of
requirement, shall be offered.
The design of 3 phase 50, 63, 125, 80 MVAr reactor bank shall be
suitable for bay width of the substation/s, as indicated in the attached
schedule – A of the tender.
If the reactor is intended to be used as Line reactor then NGR and SA
shall be supplied as per technical specification. However, if it is intended
to be used as Bay reactor, then NGR and SA shall not be supplied.
Each reactor shall be supplied with (i) One number of Oil Storage steel tank,
(ii) 3 nos. of oil sampling bottles, (iii) On line Moisture and Gas in oil analyser,
(iv) Fiber optic sensors, (v) Nitrogen Injection System for Protection
against the Fire & Explosion as per specification no. GETCO/E/TS-
FF/2902 DTD.JUNE 2008, attached with this specification, (vi) On line
PD measurement, (vii) GPS/GRPS/GSM based on line reactor movement
tracking system on returnable basis (viii) Condition controlled
maintenance free on line breather as per specification. (ix) on line tan
delta of bushing (x) SFRA Kit (xi) Tan delta kit (xii) Air Dryer, if indicated
in Schedule – A of respective tender.. However, Bidder has to quote the
requirement of equipment / Material as indicated in Schedule-A of
commercial Bid.

1.2.0. CLIMATIC AND ISOCERAUNIC CONDITIONS:

1.2.1 The climatic conditions at site under which the equipment shall operate
satisfactory are as under:
i) Altitude above main sea level (Meters) Not exceeding 1000
mtrs.
ii) Max. ambient air temperature ºC 50ºC
iii) Max. daily average ambient 35ºC
iv) Relative humidity for design of equipment % 95%
v) Max. yearly weighted average temperature ºC 30ºC
vi) Minimum temperature of air in shade ºC 3.5ºC
vii) Climate Moderately hot and
humid tropical
climate conductive
to rust and fungus
growth
viii) Maximum annual rain fall in min 1150mm during
June to October
ix) Isoceraunic level 30

Sign & Seal of Bidder Page 4 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

x) Average number of thunder storm days/ 15


annum
xi) Maximum wind pressure Kg/m2 150
xii) Earthquake acceleration (G) 0.08x2 g.

1.2.2 All electrical devices shall be given tropical and fungicidal treatment and
shall be capable of satisfactory operation under the severe climatic
conditions that would prevail at site as described above.
1.2.3. The equipment offered shall be suitable for continuous operation under
above conditions at the full rated capacity.
1.2.4. Since the sub-stations, where the equipment is to be installed, is on the
coastal and/or industrial areas, the equipment offered shall be suitable
for heavily polluted atmosphere.
1.2.5. The equipment offered shall be suitable for hot line maintenance
techniques.

1.3.0. SYSTEM PARTICULARS:

1.3.1. Nominal System Voltage 400 kV rms.


1.3.2. Highest System Voltage 420 kV rms.
1.3.3. System Frequency 50 Hz.
1.3.4. Number of Phases Three (3)
1.3.5. Neutral Directly earthed

1.4.0. AUXILIARY POWER SUPPLY:

1.4.1. Auxiliary electrical equipment shall be suitable for operation on the


following supply system.

i) Power devices (like drive 415 Volts, 3 phase, 4 wire, 50 Hz.


motors etc.) Neutral grounded AC supply.
ii) AC control and protective 240 Volts, 1 phase, 2 wire, 50 Hz,
devices, lighting fixtures, AC supply with one lead
space heaters, etc. grounded.
iii) D.C. alarm control and Two separate 220 Volts, two wires
protective device ungrounded D.C. supply from
battery.
iv) Solid state control 48-V DC supply from battery

1.4.2. The above supply voltages may very as follows:


All devices shall be suitable for continuous operation over entire range of
voltage.
i) AC supply Voltage variation ± 10%
Frequency variation ± 3%
ii) DC supply (-) 15% to (+) 10% variation.

Sign & Seal of Bidder Page 5 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

1.4.3. Each of the foregoing supplies will be made available by the purchaser
at one terminal point for each reactor for operation of accessories and
auxiliary equipment.

1.5.0. LOCATION OF THE EQUIPMENT:

The location of Shunt Reactors will be anywhere in the State of Gujarat.

1.6.0. SPECIFIC TECHNICAL PARTICULARS OF THE EQUIPMENT:

The Shunt Reactor bank shall comply with the following technical
requirements:

1.6.1. SHUNT REACTOR:

i) Rated voltage 420 kV, 1.0 (p.u.)


Rated reactive power 3 phase 50 / 63 MVAr 3 phase 80 / 125 MVAr
(3 ph or 1 ph unit and rating OR OR
shall be offered as per Single phase (3x16.67 Single phase (3x26.67
schedule ‘A’ of tender notice.) MVAr) / 63 (3X21) MVAr MVAr) / (3X41.67) MVAr
ii) Rated Frequency 50 Hz.
iii) No. of phases 3 phases
iv) System fault level 40 kA
v) Duration of short circuit 3 sec.
current
vi) Connection Star with neutral brought out.
vii) INSULATION LEVEL FOR WINDING
a) Lighting Impulse 1.2/50 1300 kV Peak
micro seconds withstand
voltage
b) Switching surge 1050 kV Peak
withstand voltage
c) One minute power 420 kV rms.
Frequency withstand
Voltage
viii) Maximum admissible temp. Rise with reference ambient temp. of 50º and at highest
voltage:
a) of winding by resistance 55ºC
b) of top oil by thermometer 50ºC
c) The temperature of the As per relevant standard.
hottest spot
ix) Cooling system Natural oil circulation (ONAN)
x) Total loss at rated voltage Reactor rating, kW
and rated frequency. in MVAr
50 85
63 117
80 135
125 185 160 kW as per
xi) Insulation level of Neutral Amdt.

Sign & Seal of Bidder Page 6 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

a) Impulse with-stand 550 kV peak


voltage
b) P. F withstand voltage 230 kV rms.
c) Whether neutral is to be Yes (Through adequately Rated 145 kV class oil
brought out filled condenser bushings)
xii) Terminals:
a) Line Terminals 420 kV oil filled condenser bussing with test taps
b) Neutral Terminals Adequately rated bushings
xiii) Impedance ratio (X0/X1) Between 0.9 and 1.0 (The bidder must clearly specify
the exact figure).
xiv) Range of constant Up to 1.5 p.u. voltage. (The bidder shall furnish complete
impedance saturation characteristics of the Reactors up to 2.5 p.u.
voltages).
xv) Tolerance on current at 0 to +5% of rated current
rated voltage
xvi) Harmonic content in phase The crest value of the third Harmonic component in phase
current current not to exceed 3% of the crest value of
fundamental when reactor is energized at rated voltage
with sinusoidal wave form.
xvii) Permissible current + 2% of the average value
unbalance among different
phases.
xviii) Minimum clearance in air Phase to Phase: Phase to Ground:
at rated voltage of with
terminal connector
420 kV 4000 mm 3500 mm
145 kV 1430 mm 1270 mm
xix) Noise level at rated voltage As per NEMA –TR-I 80 dB as per Amdt.
and frequency
xx) Bushings: Line side Neutral side
a) Rated voltage 420 kV 145 kV
b) Creepage distance 10,500 mm 3625 mm
(total)
c) Mounting Tank cover / Bell
d) 1.2/50 micro sec. 1425 650
lightning impulse withstand
voltage (kVp)
e) Switching impulse 1050 --
(250/2500 micro seconds)
withstand voltage (kVp)
f) One min PF voltage 630 kV rms 270 kV rms
g) Rated current (A) 800 800
xxi) Vibration level Not more than 200 microns peak to peak. Average
vibrations (Peak to peak) shall 60 microns. Tank stress
shall not exceed 2.0 kg/.mm2 at any point on the tank.

1.6.2 NEUTRAL GROUNDING REACTOR:

i) Rated voltage from insulation 145 kV


strength considerations
ii) Rated frequency 50 Hz

Sign & Seal of Bidder Page 7 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

iii) No of phases One


iv) Type Outdoor
v) Insulation Graded
vi) Max. continuous current 10 A (rms)
vii) Rated short time current (10 sec) 60 A (rms)
viii) Rated impedance at rated short 400 – 2500 ohm (This is an
time current indicative value, actual
value will be confirmed
during detailed engineering)
Bushings Line side Ground side
i) Rated voltage 145 kV 24 kV
ii) Creepage distance (total) in mm 3625 600
iii) Mounting Tank Tank
cover/bell cover/bell
iv) Lightning Impulse (1.2/50 micro 650 125
sec) withstand voltage (kVp)
v) Power Frequency withstand 275 50
voltage (kV rms)
Connection Between neutral of shunt
reactor and ground
Insulation level for winding Line side Ground side
i) Lightning Impulse (1.2/50 micro 550 95
sec) withstand voltage (kVp)
ii) Power Frequency withstand 230 38
voltage (kV rms)
iii) Max. admissible temperature rise
with reference ambient
temperature of 50ºC at rated
voltage
a) of winding measured by 50 ºC
resistance
b) of top oil measured by thermometer 45 ºC
iv) Cooling system Natural oil cooling (ONAN)
v) Cooling medium Mineral oil
vi) Whether neutral is to be brought Yes, through 24 kV class
out porcelain bushing.
vii) Method of grounding Solidly connected between
neutral of shunt reactor and
earth.

1.6.2. BUSHING CURRENT TRANSFORMERS:


Shunt Reactor (on each phase connection)

Line side Neutral side


a) Ratio Core 1 200/1A 200/1A
Core 2 200/1A 2000-1000- 500/1A
Core 3 200/1A - do -
Core 4 200/1A Suitable for W.T.I.
b) Minimum Knee Core 1 ≥200V ≥200V
point voltage or Class PS Class PS

Sign & Seal of Bidder Page 8 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

burden and Core 2 ≥200V ≥2000V


accuracy class Class PS Class PS
Core 3 ≥200V ≥2000V
Class PS Class PS
Core 4 10 VA Suitable for W.T.I.
Class- 0.5 being supplied
c) Maximum CT Core 1 1 ohm 1 ohm
Resistance / ≤30 mA at ≤30 mA at Vk/2
current Vk/2
Core 2 1 ohm 10 - 5 - 2.5 ohms.
≤30 mA at ≤30 mA at Vk/2
Vk/2
Core 3 1 ohm 10 - 5 - 2.5 ohms.
≤30 mA at ≤30 mA at Vk/2
Vk/2
Core 4 -- Suitable for W.T.I.
d) Application Core 1 Reactor Reactor Differential
Differential
Core 2 Restricted Spare / (Line
earth protection Main- II/
Tzone differential
protn.
Core 3 Reactor Spare / (Line
back up protection Main- II/
Tzone differential
protn.
Core 4 Metering Temp. Indicator (on
one phase only)

Neutral Grounding Reactor:


Line side Neutral side
a) Ratio Core 1 200/1A 200/1A
b) Min knee point Core 1 ≥200V ≥200V
voltage & accuracy Class PS Class PS
class
c) Maximum CT Core 1 1 ohm 1 ohm
Resistance/current ≤30 mA at ≤30 mA at Vk/2
Vk/2
d) Application Core 1 Restricted Restricted Earth
Earth fault fault

NOTE: 1. CT shall be as per IS: 2705 (latest amended)


2. It shall be possible to remove the CTs from the reactor tank without
removing the reactor cover. Necessary precautions shall be taken to
minimize eddy currents and local heat generated in the turret.
3. CT Secondary leads shall be brought out to a weather proof terminal
box near the bushings. These terminals shall be wired out to cooler
control cabinet/ marshalling box using separate cables for each core.
4. CT characteristics shall be subject to the purchaser's approval.

Sign & Seal of Bidder Page 9 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

5. Magnetization current of CTs shall be < or = 30 mA at highest tap.


6. The arrangement of current transformer on shunt reactor / NGR shall
be as per drawing no. GETCO/E/4S-001/039A.
7. The secondary excitation current of class PS shall not be more than
4% of rated secondary current at 25 % of knee point voltage.
8. Class (for relevant protection and duties) as per IEC: 60185.

1.6.3 GAPLESS SURGE ARRESTER:


i) Rated arrester voltage 120 kV
ii) Rated system voltage 145 kV
iii) Rated system frequency 50 Hz
iv) System neutral earthing Effectively earthed
v) Installation Outdoor
vi) Nominal discharge current 10 kA of 8/20 micro sec
wave
vii) Class of arrester 10 kA heavy duty type
viii) Minimum discharge capacity 8 kJ/kV (referred to rated
voltage)
ix) Continuous operating voltage at 102 kV
50 ºC
x) Maximum switching surge 280 kVp
residual voltage
xi) Maximum residual voltage at
a) 5 kA 320 kVp
b) 10 kA nominal discharge 340 kVp
current
xii) Long duration discharge current 3 (three)
class
xiii) High current short duration test 100 kAp
value (4/10 micro sec. wave)
xiv) Current for pressure relief test 40 kA rms
xv) Low current long duration test 1000 Apeak
value (2000 micro sec)
xvi) Minimum total creepage distance 3625 mm
xvii) One minute power frequency 275 kV rms
withstand voltage of arrester
housing
xviii) Impulse withstand voltage of +650 kVp
arrester housing with 1.2/50
micro sec wave
xix) Pressure relief class A
xx) RIV at 92 kV rms Less than 500 micro volts
xxi) Partial discharge at 1.05 Not more than 50 pC
continuous over voltage
xxii) Seismic acceleration 0.3 g horizontal
xxiii) Reference ambient temperature 50 0C
xxiv) Max. Continuous Operating As per IEC 60099-4
Voltages cl.3.2.1
xxv) Anticipated levels of

Sign & Seal of Bidder Page 10 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

temporary over voltage and its


duration
(a) Voltages 1.3 times rated voltage of
arrester
(b) Duration 1 to 10 sec
xxvi) Ratio of switching impulse Not more than two
residual voltage to rated
voltage of arrester

1.7.0. OTHER REQUIREMENTS:


1.7.1. Shunt Reactor shall be connected to the 400 kV systems for reactive
load compensation and it shall be capable of controlling the dynamic
over voltage occurring in the system due to load rejection.

1.7.2. Shunt Reactor shall be capable of operating continuously at a voltage


5% higher than rated voltage of shunt reactor without injurious heating.

1.7.3. Temperature rise shall be guaranteed when reactor is operating at 420


kV (Highest voltage of system).

1.7.4. The Reactor shall be subjected to switching surge over voltage up to 2.5
p.u. and temporary over voltage for few cycles, of the order of 2.3 p.u.,
followed by power frequency over voltage up to 1.5 p.u. The reactor
must withstand the stresses due to above transient dynamic conditions
which may cause additional current flow as a result of changed
saturation characteristics / slope beyond 1.5 p.u.

1.7.5. The bidder shall clearly guarantee in his bid that the equipment offered
shall perform satisfactorily under both the power frequency and
switching such over voltages shall not cause any damage to the winding
or withstanding Thermal and mechanical effects of short circuit at the
terminals for a duration of 3 seconds without any damage of distortion.

1.7.6 The neutral grounding reactors are required for grounding of the neutral
point of shunt reactors to limit the secondary arc current and the
recovery voltage to a minimum value.

Sign & Seal of Bidder Page 11 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

SECTION - II

GENERAL TECHNICAL REQUIREMENTS

2.1.0. SCOPE:

2.1.1. This scope covers design manufacture, assembly, inspection and testing
at manufacturer's works, supply, delivery including loading,
transportation & unloading on plinth at site of 420 kV shut reactors, NGR
& SA and accessories required for the safe, efficient, satisfactory and
trouble free operation of the equipment. Also, at the discretion of the
purchaser, the seller may have to undertake erection, supervision of
erection, testing and commissioning of the equipment included in his
scope of supply. Bidder shall quote for these items as required in the
price schedule.
2.1.2 The scope of work shall also include EITHER complete erection, testing
and commissioning of all the equipments/accessories furnished under
this specification OR only supervision of erection, testing and
commissioning of all the equipment furnished under this Specification, as
indicated in Schedule – A of the commercial bid.

2.1.3 It is not the intent to specify completely herein all the details of design
and construction of the equipment. However, the equipment shall
confirm, in all respect to high standards of engineering, design and
workmanship and be capable of performing in continuous commercial
operation up to guarantee in a manner acceptable to the purchaser, who
will interpret the meaning of drawings and specifications and shall have
the power to reject any work or material which in his opinion are not in
full accordance therewith.

2.1.3 All deviations from this specification shall be separately listed in


specified Schedule, in the absence of which, it will be presumed that the
provision of the specification are complied with by the bidder.

2.2.0. STANDARDS:

2.2.1. All equipments provided under this specification, shall, in General


conform to the latest issued including amendments of the following
standards.
Indian Title International & Internationally
Standards recognized
IS-2026 Power Transformers IEC - 60076
IS-3639 Fitting and Accessories for power IEC - 60289
transformers
IS-5553 Part-I Shunt Reactors IEC - 60289
IS-335 Insulating oil for Transformers and IEC – 60296 -2000
switchgears
IS - 2009 Bushings for alternating voltage IEC - 60137
above 1000 Volts.
IS - 2705 Current Transformers IEC Publication 60185

Sign & Seal of Bidder Page 12 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

IS - 2147 Degree of protection provided by


enclosures for low voltage
switchgear and control.
IS - 5 Colour of ready mix paints
IS - 375 Internal wiring of Marshalling box.

2.2.2. In case equipment conforms to other internationally acceptable


standards which ensure equivalent or better performance than that
specified under clause 2.2.0 then English version of such standards or
relevant extracts of the same shall be forwarded with the bid and the
salient features of comparison shall be brought out separately in the bid.

2.2.3. Accessories, components, parts and raw materials shall conform to


relevant Indian standards.

2.3.0. DRAWINGS AND DATA:

2.3.1. Drawings in AutoCAD format and in hard copy, incorporating the


following particulars shall be submitted by the bidder with the bid.

i) General outline drawings showing dimensions, net and shipping


weight of the equipment offered, marshalling box/control cubicles
required for all the monitoring devices, etc.
ii) Outline drawing showing plan, front and side elevation with all
fittings and accessories.
iii) Drawings for foundation.
iv) Schematic wiring diagram of control cabinet.
v) Marshalling box with wiring diagram.
vi) Drawings of all types of bushings indicating plan, elevation,
terminal details, mounting details, make and type, current and
voltage rating, creepage distances and main characteristics.
vii) Type test reports and oscillogram of similar equipment. The type
test reports shall be from reputed laboratory / Government
institution.
viii) Rating and diagram plate.
ix) Drawings showing details of Buchholz relay, winding temperature
indicator, oil temperature indicator, air cell, cooling systems, all
the monitoring devices and NIFPS, maintenance free breather,
etc, as indicated in schedule – A of respective tender.

2.3.2. The bidder may furnish any other drawings which he considers
necessary for giving complete information about his equipment.

2.3.3. After receipt of an order, the successful bidder shall have to furnish, the
following drawings in hard as well as AutoCAD format, for approval of
the purchaser.

i) General outline drawing showing front, side elevations and plan of


the reactor and accessories with detailed dimensions &
clearances.
ii) Detailed foundation drawing.

Sign & Seal of Bidder Page 13 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

iii) Drawings of each type of bushings, lifting dimensions, clearances


between terminals and ground, quantity of insulating oil, name
plate details etc.
iv) Large scale drawing of the winding indicating arrangement of
terminal connections.
v) Control and wiring diagrams and drawings showing temperature
indicator, alarm circuits, Buchholz relay, oil surge relay, PRV, MOG,
WTI, OTI, AVR relay, etc.
vi) Drawings showing Construction and mounting details of
marshalling box / boxes.
vii) Detailed drawing showing wheel loading and centre of gravity of
reactor.
viii) Detailed erection, operation and maintenance guide.
ix) Layout for mounting details of shunt reactor.
x) Rating and diagram plate.

2.3.4. After receipt of the order, the successful bidder shall prepare a program
for submission of various drawings for the approval of the purchaser
within commencement period.

2.3.5. Drawings, diagrams, instructions and reports shall be identified by


descriptive title indicating their application to the equipment offered. All
drawings and data shall be annotated in English Language; Dimensions
shall be in Metric system.

2.3.6. The bidder may submit any other drawings found necessary in addition
to the drawings mentioned above or as asked during detailed
engineering.

2.4.0. GENERAL CONSTRUCTION DETAILS:

Tank and Tank accessories.

2.4.1. Tank:

a) Tank shall be welded construction and fabricated from tested


quality low carbon steel of adequate thickness.

b) All seems and those joints not required to be opened at site shall
be factory welded and wherever possible they shall be double
welded. All welding shall be either stress relieved or radio
graphically tested.

c) Tank stiffeners shall be provided for general rigidity and these


shall be designed to prevent retention of water.

d) The tank shall be designed to withstand:


i) Mechanical shocks during transportation.
ii) Vacuum filling of oil.
iii) Continuous internal pressure of 0.35 kg/cm2 over normal
hydrostatic pressures of oil.

Sign & Seal of Bidder Page 14 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

iv) Short circuit forces.

e) Wherever possible the reactor tank and its accessories shall be


designed without pockets wherein gas may collect. Where
pockets cannot be avoided, pipes shall be provided to vent the
gas into the main expansion pipe.

f) Tank shields shall be such that no magnetic field shall exist


outside the tank. They shall be of magnetically permeable
material. If required impermeable shields shall be provided at the
coil ends. Tank shields shall not resonate when excited at the
natural frequency of the Reactor.

g) The base of each tank shall be so designed that it shall be


possible to move the complete reactor unit by skidding in any
direction without injury when using plates or rails.

h) Each tank shall be provided with


i) Lifting lugs suitable for lifting the Reactor complete with oil.
ii) A minimum of four jacking pads, in accessible position to
enable the Reactor complete with oil, to be raised or
lowered using mechanical screw jacks of required
capacity to be supplied with.
iii) Suitable haulage holes shall be provided.
iv) A valve of other suitable means shall be providing to fix the
on line dissolved Gas monitoring system to facilitate
continuous dissolved gas analysis. Location and size of the
same shall be finalized during detailed engineering

i) Adequate space shall be provided at the bottom of the tank for


collection of sediments.

j) Suitable guides shall be provided in this tank for positioning of the


core and coil assembly.

2.4.2. Tank Cover:

a) The tank with cover or BELL type shall be of adequate strength


and shall not distort when lifted. It shall be slightly sloped to
prevent retention of water.

b) At least two adequately sized inspection opening, one at each


end of the tank, shall be provided for easy access to bushings
and testing of earth connections. The inspection covers shall not
weigh more than 25 KGs.

c) The tank cover shall be fitted with pockets at the position of


maximum oil temperature at MCR for bulbs of oil and winding
temperature indicator. It shall be possible to remove these bulbs
without lowering the oil in the tank. The thermometer pocket shall
be fitted with a captive screwed top to prevent the ingress of

Sign & Seal of Bidder Page 15 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

water. The tank wall penetrations shall be leak proof, suitably


marked with respective sensor identification.

d) Bushing, turrets, covers of inspection opening, thermometer


pocket etc. shall be designed to prevent ingress of water into or
leakage of oil from the tank.

e) All bolted connections shall be fitted with weather proof, hot oil
resistant, resilient gasket in between, for complete oil tightness. If
the gasket is compressible, metallic stops shall be provided to
prevent over compression.

2.4.3. Axles and wheels:

a) Reactors are to be provided with flanged bi-directional wheels


and axles. These shall be so designed that under any service
condition they shall not deflect sufficiently to interfere with the
movement of the reactor.

b) Suitable locking arrangement shall be provided for the wheels to


prevent accidental movement of the reactor.

c) The wheels are required to swivel and they shall be arranged so


that they can be turned through an angle of 90º when the tank is
jacked up to clear of rails. Means shall be provided for locking
the swivel movements in positions parallel to and at right angles
to the longitudinal axis of the tank.

d) Flanged wheels provided shall be suitable for use on rail track


gauge of 1676 mm in longitudinal and transverse direction.

e) The reactor shall be suitable for mounting on concrete plinth


foundation directly. The wheels and axles shall be suitable for
fixing to the under carriage of Shunt Reactor to facilitate
movements of shunt reactor on Rail track.

2.4.4. Conservator Tank:

a) The Conservator tank shall have adequate capacity between


highest and lowest visible levels to meet the requirement of
expansion of the total cold oil volume in the Reactors and cooling
equipment from minimum ambient temperature to 90ºC.

b) One end of the conservator shall be bolted in position so that it


can be removed for cleaning purpose.

c) Conservator shall be provided in such a position as not to


obstruct the electrical connections to the Reactor.

Sign & Seal of Bidder Page 16 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

d) The Conservator shall be fitted with magnetic oil level gauge with
low level electrically insulated alarm contact.

e) NGR shall have conventional type conservator with prismatic oil


level gauge.

2.4.5. Oil Preservation Equipment:


Air cell type conservator tank is to be provided for oil conservator
system. Bidder shall offer diaphragm type oil sealing in conservator to
prevent oxidation and contamination of oil due to contact with water. In
this type of oil preservation system, conservator shall be fitted with
a dehydrating filter breather. The air cell shall be provided as per
specification given in Annexure attached here with.

a) Diaphram Seal type constant oil pressure system. It shall be so


designed that:

i) Contact of the oil with atmosphere is prohibited by using a flexible


urethane air cell.
ii) The cell is vented to the atmosphere through a dehydrator air
breather and inflates or deflates as the oil volume changes due to
changes in temperature.
iii) The connection of the air-cell to the top of reservoir is by an air-
proof seal permitting entrance of air into the cell only.
iv) Diaphragm used shall be suitable for continuous operation in an
atmosphere of 100 0C to which reactor oil is likely to rise.
v) The diaphragm of the conservator shall withstand the vacuum
during installation and maintenance. Otherwise provision shall be
made to isolate the conservator from main tank during vacuum
by providing vacuum sealing valve in the pipe connecting the
main tank with the conservator

b) Dehydrating filter breather:

Each conservator shall be fitted with either conventional


dehydrating filter breather or Condition controlled maintenance
free dehydrating breather as indicated in Schedule – A of the
respective tender.
[A] The conventional breather shall be so designed such that:

i) Passage of air is through a dust filter and silica gel.


ii) Silica gel is isolated from atmosphere by an oil seal.
iii) Moisture absorption is indicated by change in colour of the
tinted crystals which can be easily observed from a
distance.
iv) Breather is mounted not more than 1400 mm above rail top
level.

Sign & Seal of Bidder Page 17 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

v) It is of clear view type design so that moisture absorption


indication by change in colour of silica gel is visible from a
distance
vi) Size of breather shall be such that it content 5 kG of silica
gel in it
vii) The nos. of breathers shall be Three or more as required
for main conservator, TWO for NGR tank conservator.
[B] Condition controlled maintenance free dehydrating breather for
main conservator:
The main tank conservator shall be fitted with a silica gel Breather of
the Maintenance-Free type at a height of 1200 mm from rail top
level. Each Silica gel breather shall be equipped with a humidity
sensor, a condition based microprocessor control unit and LED status
indication. The function shall be tested via a test button. A stainless
steel filter at the bottom shall protect the silica gel chamber against
external environment influences. This condition controlled
application should be environmental friendly.

Dehydrating breathers work according to the following principle.


When the oil conservator suctions in air (e.g., due to the reduced
load), the air flows through a filter made of high-grade steel wire
mesh to the inside of the device. This filter & the dust cap, filters the
dust, sand and other dirt particles from the air. The filtered air flows
through the desiccant chamber filled with colorless, moisture
adsorbing pellets and are dehydrated. The dehydrated air rises
further via the pipe in the oil conservator. The dehydrating breather is
mounted on the pipe to the oil conservator. A suitable counter-
flange must be installed on the pipe to mount the dehydrating
breather. The desiccant contained in the drying assembly is
dehydrated using sensor which is controlled by the built-in heating
unit, thus obviating the need for periodic desiccant replacement.

The Maintenance Free Type of Breather shall fulfill the objectives like
reduced site inspections, no storage or replacement of the
desiccant no pollution and disposal problem of the used up
desiccant.

Technical requirements:

1. Material & External Construction of the Breather shall be such


that all external parts are suitable for outdoor use & resistive to
transformer oil, ultraviolet rays, pollution & salt water.
2. The equipment shall work without any trouble for ambient
temperature between 0o C to +80 oC.
3. Degree of Protection shall be at least IP55.
4. The control unit shall be provided on the breather equipped
with suitable heater to prevent moisture condensation.
5. Status LEDs for local display shall be provided on breather along
with suitable contacts to take the signal to remote control
room.

Sign & Seal of Bidder Page 18 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

6. The moisture and temperature measurement system (sensor)


installed should be modular making it easy to replace the same
if at all the same is necessary during the service of breather. A
self diagnostic system shall be provided with LED indication and
remote signal through a relay shall be provided.
7. Micro fuse and an additional built in line filter shall be provided
to protect against over voltages & to avoid failures caused by
high-frequency interference.
8. The control unit in the breather shall provide analogue output
signal of 4-20mA and also shall be equipped with a RS 485 port
for data logging.
9. Suitable Data Logger shall also be provided in the control unit.
10. The size and type of Condition controlled maintenance free
dehydrating breather to be provided shall be selected on the
basis of volume of oil of the offered shunt reactor.
11. The Breather shall also be equipped with integrated test button
which should allow to carry out a self-test and to check the
functions like relay circuits, heating or the signal transmission in
the control room, etc. at any time.
12. Rated supply Voltages shall be 230 V AC or DC.
Rated insulation level - 500VAC 50 Hz, 1 min withstand voltage
500VAC 50 Hz, 1min. withstand, analog output against ground;
2.5kVAC 50 Hz, 1 min. withstand, relay contact against ground
13. Type Test report for Degree of protection for control unit shall be
submitted.
Successful bidder shall offer all acceptance tests on Condition
controlled maintenance free dehydrating breather and submit
routine test report during acceptance of shunt reactor for each
supply. List of acceptance / routine tests shall be submitted with
the tender.
2.4.6 Pressure Relief Device:

The pressure relief device provided shall be of sufficient size for rapid
release of any pressure that may be generated in the tank and which
may result in damage of the equipment. The devices shall operate at a
static pressure less than the hydraulic test pressure of reactor tank. The
pressure relief device shall be of spring loaded type with alarm contacts.

2.4.7 Earthing Terminals :

Two earthing terminals shall be provided at positions close to each of


the two bottom corners of tank. These grounding terminals should be
suitable to receive Purchaser's grounding conductor / strips shall be 80 x
10mm G.I. flats. Adequately rated pin insulators mounted on the tank
shall be provided for grounding the neutral terminals.

2.4.8. Anti Earth Quake Clamping Device:

To prevent Reactor movement during earthquake, a clamping device


should be provided for fixing the reactor to the foundation. The
contractor shall supply necessary bolts for embedding in the concreting

Sign & Seal of Bidder Page 19 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

after reactor is placed on foundation. The arrangement shall be such


that the Reactor can be fixed to or unfastened from these bolts as
desired.

2.4.9 Buchholz Relay:

a) A double float type Buchholz Relay shall be provided. All gases


evolved in the reactor shall collect in this relay. The Relay shall be
provided with a test cock suitable for a flexible pipe connection for
checking its operation. A copper tube shall be connected from the
gas collector to a valve located about 1200mm above ground level to
facilitate sampling with the reactor in service. The device shall be
provided with two electrically independent contacts. One for alarm
on gas accumulation and the other for tripping on sudden rise of
pressure.

b) A sudden pressure rise release relay shall be fitted on main tank to


operate on rate of rise of pressure. An electrically insulated trip
contact shall be provided in PRV & sudden pressure relay.

2.5.0. CORE:

a) The Shunt Reactor shall be either gapped core type or


magnetically shielded air core type construction. The bidder shall
describe in details (with calculation and reference) the merits and
demerits of the type offered.
b) In case gapped core construction the following requirements are
stipulated.
i) The core shall be constructed from high grade, non-ageing, cold
rolled, grain oriented silicon steel laminations of prime quality
only.
ii) The design of the magnetic circuit shall be such as to avoid static
discharges, development of short circuit paths within itself or to
the earthed clamping structure and production of flux components
at right angles to the plane of laminations which may cause local
heating.
iii) The insulation of core to bolts and core to clamp plates shall be
able to withstand a voltage of 2 kV rms for 1 minute.
iv) Cores and windings shall be capable of withstanding shocks
during transport, installation and services. Adequate provisions
shall be made to prevent movement of core and winding relative
to tank during these conditions.
v) The supporting frame work of the core shall be so designed as to
avoid presence of pockets which would prevent complete
emptying of the tank through drain valve. The design of the core
assembly shall be such that it will not cause trapping of air during
oil fillings.
vi) All steel sections used for supporting the core shall be thoroughly
sand blasted after cutting, drilling and welding.

Sign & Seal of Bidder Page 20 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

vii) When bell type tank construction is offered suitable projecting


guides shall be provided on core assembly to facilitate removal of
tank.
ix) Bidder will offer the core for stage inspection and get approval
from purchaser during manufacturing stage. The bidder has to
produce following documents at the time of stage inspection for
confirmation of use of prime core materials.
i) Invoice of supplier
ii) Mills of approved test certificates
iii) Packing list
iv) Bill of lading
v) Bill of entry certificate by custom.
To avoid any possibility of mixing of ‘Prime material’ with any other
second grade/ defective material, the imported packed slit coils of
CRGO materials shall be opened in the presence of the GETCO
representative. Only after the inspection and approval from purchaser,
the core material will be cut in-house OR sent to external agency for
cutting individual laminations. In case the core is sent to external
agency for cutting, GETCO representative will have full access to visit
such agency for the inspection of the cutting of core.

1.9.2 After being sheared, the laminations shall be treated to remove all burrs
and shall be re-annealed to remove all residual stresses. The insulation
of the lamination shall be insert to the action of hot transformer oil. Paper
and varnish insulation will not be accepted. The nature of insulation
should be specified in the tender.

c) In case of core-less construction there shall be:


i) A magnetic shields around the coreless coils.
ii) Non-magnetic material sheets shall form the central core to
minimize the vibrations.

2.6.0. WINDINGS:

a) The conductors shall be electrolytic grade copper, free from


scales and burrs.

b) The insulation of Reactor windings and connection shall be free


from insulating compounds which are liable to soften, ooze out,
shrink or collapse and these should remain non-catalytic and
chemically inert in oil during service.

c) Coils shall be made up, shaped and braced to provide for


expansion and contraction due to temperature changes.

d) The conductor shall be transposed at sufficient intervals in order


to minimize eddy currents and equalize the distribution of currents
and temperature along the windings.

Sign & Seal of Bidder Page 21 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

e) Coil assembly and insulating spacers shall be so arranged as to


ensure free circulation of oil and to reduce the hot spots of the
windings.

f) The 400 kV windings shall be done in dust free and conditioned


atmosphere.

g) Fiber optic sensors shall be embedded in each phase of the


winding located at hottest spot. The location and details shall
be derived and indicated in the respective drawings along
with justification.
h) The insulation paper shall be of high quality and the value of
degree of polymerization shall not be less than 1200 Pv and the
necessary test certificate shall be submitted along with the stage
inspection report. Provision shall be made for taking sample of
paper for testing purpose and location shall be easily accessible
and indicated on the shunt reactor tank by affixing special caution
plate.

2.7.0. INSULATING OIL

2.7.1 The oil for first filling together with 10% extra shall be supplied with each
shunt reactor. The oil shall comply in all respects with Appendix – A (revised)
of this specification. Particular attention shall be paid to deliver the oil free
from moisture having uniform quality throughout. The oil may be supplied
either in sealed tanker, or in non-returnable sealed steel drums, which will
be opened at site in presence of GETCO representative. The quantity of oil
for first filling & 10% extra shall be stated in the tender.

The supplier of reactor shall furnish test certificates of the insulating power
oil supplied against their acceptance norms, prior to dispatch. Subsequently
oil samples shall be drawn
i) at manufacturer’s works before and after heat run test and shall be tested
for following:
a) BDV in kVrms
b) Moisture content
c) Dissolved Gas Analysis – samples for DGA shall be taken from
sampling device within 24 hrs prior to commencement of heat run
test and immediately after this test. The acceptance norms shall be
as per IS:10593 (based on IEC-599)
ii) prior to filling in main tank at site and shall be tested for BDV and
moisture content and corrosive sulphur detection test as per IEC 62353
subjecting oil for 150 0C for 72 hrs for acceptance norms Appendix – A
(revised) of this specification.
iii) prior to energisation at site and shall be tested for the following:
a) BDV in kVrms
b) Moisture content
c) Tan Delta at 90 0C.
d) Resistivity at 90 0C.
e) Interfacial Tension

Sign & Seal of Bidder Page 22 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

iv) The bidder shall dispatch the reactor filled with oil or Nitrogen or dry air. The
bidder shall take care of the weight limitation on transport and handling
facility at site. Necessary arrangement shall be ensured by the bidder to take
care of pressure drop of nitrogen during transit and storage till completion of
oil filling during erection. A gas pressure testing valve with necessary
pressure gauge and adaptor valve shall be provided.
v) The contractor shall warrant that oil supplied is in accordance with the
following specification.

Sign & Seal of Bidder Page 23 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

APPENDIX – A (Revised)
SPECIFICATION FOR TRANSFORMER OIL (uninhibited)
(for 132 kV & ABOVE CLASS UP TO 400 kV Transformers and 400 kV Reactors)

Sr. Characteristics of Transformer Requirement Method of test


No. Oil
1 Appearance The oil shall be clear Visual.
transparent & free (A representative
from suspended matter sample of the oil shall
of sediments. be examined in a 100
mm thick layer, at
ambient temperature.)
2 Density, gm/Cm3
- at 29.5 0C Max. 0.89 IS: 1448 P16
- at 20 0C 0.895 ISO 3675 / ISO 12185
3 Kinematic Viscosity, ISO 3104
in CST (sqmm/sec)
- at 40 0C, Max 12
- at (-20) 0C, Max 1800
4 Flash point, 0C Min. 135 ISO 2719
Penskey-Marten (Closed)
5 Interfacial tension at 27 0C 0.04 ISO 6295
Newton/M, Min.
6 Pour point, Max - 30 0C IS: 1448 P:10 / ISO
3016
7 Neutralization value IEC:62021-1 or 2
Total acidity 0.01
mg KOH/gm, Max
8 Corrosive Sulphur Not corrosive IEC 62535
(In terms of classification of (1500C for 72 hrs)
copper strip+paper)
9 Total Sulphur content % w/w <0.15 BS 2000 Part 373 or
ISO 14596
10 Electric Strength IEC 60156
(Break down voltage)
a) New Untreated Oil 30 KV Min. (rms)
b) After treatment 70 KV Min. (rms)
11 Dielectric Dissipation Factor 0.002 Max. IEC:60247
(Tan delta) at 90 0C
12 Oxidation Stability after 164 IEC 61125 (method C)
Hrs. @ 120 0C, Max
a) Total Acidity in mg 1.2
KOH/gm Max.
b) Total sludge % by weight 0.8
max.
c) DDF at 90 0C 0.05

Sign & Seal of Bidder Page 24 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

13 Presence of Anti Oxidation Absent IEC:60666


inhibitor (Additive)
14 Water content PPM (Max) 05
As Delivered < 30 (in bulk); IEC 60814
After treatment at site by shunt < 40 (in drum)
reactor manufacturer.
15 Poly Chlorinated Biphenyls Not detectable IEC 61619
(< 2 PPM)
(PCB) Content
16 Poly Cyclic (PCA) content, Max 3% BS 2000 part 346
17 2 FAL/ Furans, ppm < 0.1 IEC 61198
18 Impulse Breakdown voltage >145 kVp ASTM method
test D 3300

Note:

1) P N A content shall be taken as finger print value by oil supplier and shown in
acceptance test report.
2) When pour point (max) has been decided as (-30 0C), Lowest Cold Start
Energizing Temperature shall be (-20 0C).
-----------------------

Sign & Seal of Bidder Page 25 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

2.8.0. TERMINAL ARRANGEMENT

2.8.1. Bushings: The bushings shall conform to the following requirements.

a) The electrical and mechanical characteristics of bushing shall be


accordance with IS: 2099 and IS 3347 (Part III / Section - I).

b) Bushings for voltage of 420 KV shall be of the OIP condenser type


and shall preferably be of the draw lead type to facilitate removal.
For voltage 36 kV and below, solid porcelain of oil communicating
type bushings may be used.

c) Condenser type bushings shall be provided with

i) Oil level gauge


ii) Oil filling plug and drain valve if not hermetically sealed.
iii) Tap for capacitance test.

d) When bushings have an under - oil end of re-entrant form, the pull
through lead shall be fitted with a gas, bubble deflector.

e) Where current transformers are specified, the bushings shall be


removable without disturbing the current transformer.
f) The bushings shall have high factor of safety against leakage to
ground and shall be so located as to provide adequate electrical
clearances between bushings and grounded parts. Bushings of
identical voltage rating shall be interchangeable. All bushings shall be
equipped with suitable terminals of approved type and size & shall be
suitable for bimetallic connection. The insulation class of the high
voltage neutral bushing shall be properly coordinated with the
insulation class, of the high voltage winding.
g) Each bushing shall be so coordinated with the shunt reactor insulation
so that all flash over will occur outside the tank.
h) All main winding and neutral leads shall be brought out through “out
door” type bushings which shall be so located that the full flashover
strength will be utilized and the adequate phase clearance shall
realized.
i) All porcelain used in bushings shall be of the wet process,
homogeneous and free from cavities or other flaws. The glazing shall
be uniform in colour and free from blisters, burrs and other defects.
j) The bushings for 66 kV and above shall be of the oil filled condenser
type (hermetically sealed) and shall conform to the latest edition of IS:
2099 & IS: 3347. 36 kV bushings for neutral shall be solid porcelain or
oil communicating type. Dimensions shall confirm to IS: 2099 & IS:
3347 (Part – V). The characteristics of the oil used in the bushings shall
be the same as that of the oil in the shunt reactor.

Sign & Seal of Bidder Page 26 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

k) Bushings of identical rating shall be interchangeable to optimize the


requirement of spares. Mounting dimensions of bushing shall be
matched with other makes also.
l) Polymer / composite insulator shall be seamless.

2.8.2. Terminal connectors:

a) Bushing terminal shall be provided with terminal connectors of


approved type and size for connection to external parts.

b) Requirements of terminal connectors will be intimated to the


contractor.

c) i) All castings shall be free from blow holes surface blisters, cracks
and cavities. All sharp edges and corners shall be blurred.
ii) No part of clamp / connector shall be less than 10mm thick.
iii) All ferrous parts shall be hot dip galvanizes confirming to IS : 2633.
iv) For bimetallic clamps, copper alloy liner of minimum 2mm thick shall
be case integral with aluminum body.
v) Flexible connector shall be made from tinned copper shapes.
vi) Size of terminal / Conductor for which the clamp is suitable and
rated current under site conditions shall be embossed/punched in
each component of the clamp, except hardware.
vii) All current carrying parts shall be designed and manufactured to
have minimum contact resistance.
viii) Clamps shall be designed corona controlled and shall conform to IS:
5561.
2.8.3 The height of live part shall be so arranged that minimum
clearance up to plinth shall be maintained as per safety clearances
from latest CBIP guide.
400 kV Live Part to ground clearance up to plinth – 8000 mm
132 kV Live part to ground clearance up to plinth – 4600 mm

2.9.0. TERMINAL MARKING:

The terminal marking and their physical position shall be in accordance


with IS: 2026.

2.10.0. NEUTRAL EARTHING ARRANGEMENT:

a) The neutral of the Shunt Reactor shall be brought out through


adequately rated 145 kV oil filled condenser bushing.
b) The neutral shall be directly grounded through a neutral grounding
reactor. The contractor shall provide connections between neutral
of the shunt reactor, surge arrester and the neutral grounding
reactor.
c) The contractor shall provide all accessories required for grounding
of the neutral.
d) Neutral of bus reactors, where neutral grounding reactor is not
provided, shall be grounded directly.

Sign & Seal of Bidder Page 27 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

e) The neutral terminals of bus reactor and Neutral grounding


reactors shall be brought to the ground level by a brass/tinned
copper grounding bar, supported from the tank by using porcelain
insulators. The end of the brass/tinned copper bar shall be
brought to the bottom of the tank, at a convenient point, for
making bolted connection to two (2) 75x12 mm galvanized steel
flats connected to Employer’s grounding mat.
f) A twin tinned copper strip grounding conductor of 50 x 6 mm size
shall be provided from the neutral terminal to shunt reactor base
for connection to the sub-station grounding grid. Necessary pin
insulator, clamps, bolts etc. shall be supplied for this grounding
purpose.
g) Neutral bushing to grounding conductor shall be made
through twin copper flexible strip of size 50 x 10 mm.

2.11.0. COOLING EQUIPMENT:

Oil immersed with natural cooling (ONAN)


a) The radiator bank of the Shunt Reactor shall be either separately
mounted (on RHS looking from 400 kV bushing side), or tank
mounted. For neutral grounding reactor, the radiator, if required,
may be tank mounted. The total width shall be within 400 kV bay
width of 27000 mm.
b) Radiators shall be made from pressed steel.
c) Each radiator bank shall be provided with the following
accessories.
i) Top and bottom shut off valve.
ii) Drain valve and sampling valve.
iii) Air release plug.
iv) Two grounding terminals suitable for two (2) 75x12 mm
galvanized steel flats.
v) Lifting lugs
d) Each radiator bank shall be detachable and shall be provided with
flanged inlet and outlet branches.
e) Expansion joint, if required, shall be provided on top and bottom
cooler pipe connection.

2.12.0 Valves:

a) All valves up to and including 100mm shall be of gun metal or of


cast steel, larger valves may be of gun metal or may have case
iron bodies with gun metal fittings. They shall be of full way type
with internal screw and shall open when turned counter clock-wise
when facing the hand wheel.
b) Means shall be provided for pad-locking the valves in the open
and close positions, provisions is not required for locking
individual radiator valves.
c) Each valve shall be provided with the indicator to show clearly the
position of the valve.
d) All valve flanges shall have machined faces.

Sign & Seal of Bidder Page 28 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

e) All valves in oil line shall be suitable for continuous operation with
shunt reactor oil at 100 ºC.
f) Gland packing / gasket material shall be of Teflon rope / nitrile
rubber. In case of gate / globe valves, gland packing preferably of
Teflon rope shall be used to prevent oil seepage through the
gland.
g) The oil sampling point for main tank should have two identical
valves to be put in series. Oil sampling valve shall have provision
to fix rubber hose of 100 mm size to facilitate oil sampling.
h) A valve or other suitable means shall be provided to fix the on line
dissolved gas monitoring system to facilitate continuous dissolved
gas analysis. The location and size of the same shall be finalized
during detailed engineering stage.
i) After testing inside surface of all cast iron valves coming in
contact with oil shall be applied with one coat of oil resistive paint /
vanish. Out surface of the valves shall be painted with two coats
of red oxide zinc primer followed by two coats of fully glossy
finishing paint confirming to IS:2932 and of a shade (preferably
red or yellow) distinct and different from that of main tank surface.
Outside surface except gasket seating surface of butter fly valves
shall be painted with two coats of red oxide zinc chromate
confirming to IS:2074 followed by two coats of fully glossy
finishing paint.
j) All hardware used shall be hot dip galvanised.

2.13.0. MARSHALLING BOX:

a) A sheet steel, vermin proof, weather proof marshalling box of a


suitable construction shall be provided for the reactor ancillary
apparatus. The interior and exterior painting shall be in
accordance with clause 2.14.0. The degree of protection shall be
IP 55 in accordance with IS: 2147. It shall have double hinged
door with pad lock and pad locking arrangement.

b) The marshalling box shall accommodate the following:

i) Temperature indicator for winding and oil. All shunt and


neutral grounding reactors shall be provided with a 150
mm dial

ii) Terminal boards and gland plates for incoming and


outgoing cables.

c) The temperature indicator shall be so mounted that the dials are


not more than 1600mm from ground level doors of the
compartment shall be provided with glazed windows of adequate
size.

d) To prevent internal condensation, a space heater shall be


provided. It shall be so designed that with the space heater 'ON'

Sign & Seal of Bidder Page 29 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

continuously, the temperature inside the marshalling box does not


exceed the safe operating limits at the service conditions.

e) All incoming cable shall enter from bottom and the gland plate
shall not be less than 450mm from the base of the box. The
gland plate and associated compartment shall be sealed in a
suitable manner to prevent ingress of moisture from the cable
trench or conduit.

f) All box wiring shall be in accordance with latest edition of IS:375.

2.14.0. PAINTING :

a) The surface to be painted shall be shot or sand blasted to remove


all rust and scale or foreign adhering matter or grease.

b) All steel surfaces in contact with insulating oil shall be painted with
heat resistant and oil insoluble insulating varnish.

c) All steel surfaces exposed to weather shall be given primary coat


of Zinc primer, second coat of oil and weather resistant varnish of
a colour distinct from the primary, and final two coats of glossy oil
and weather resisting, battle ship grey paint shade 631 of IS:5, in
accordance with applicable standard as specified.

d) All paints shall be carefully selected to withstand heat and


extremes of weather. The paint shall not scale or crinkle or be
removed by abrasion due to normal handling.

2.15.0. CONTROL WIRING:

a) All controls, alarms, indicating and bushing CT terminals relaying


devices provide with the reactor shall be wired up to the terminal
blocks inside the marshalling box.

b) All devices and terminal blocks within the marshalling box shall be
clearly indicated by symbols corresponding to those used in
applicable schematic or wiring diagram.

c) At least 20% spare terminals shall be provided and each terminal


shall be suitable for connecting two 7/0.737 mm copper
conductors from each side.

d) All control wiring from reactor accessories to marshalling boxes is


in the scope of the contractor and shall be done with 1100/600
volts grade standard copper conductor.

2.16.0. FITTINGS:

Sign & Seal of Bidder Page 30 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

The fittings listed hereunder, are only indicative and any other fittings
which generally are required for satisfactory operation of the reactor and
neutral grounding reactor are deemed to be included.

Reactor fitting shall include, but not necessarily be limited to the


following items.

a) Conservator for reactor main tank with filling hole and cap, drain
valve, isolating valve, vent pipe and magnetic oil level gauge with
low level alarm contacts. Conservator for NGR main tank with
drain valve, isolating valve, vent pipe and prismatic oil level gauge
shall be provided.

b) Pressure relief device & Sudden/Rapid pressure rise release relay

c) Air release devices.

d) Inspection covers

e) Dehydrating breather complete with first fill of activated silicagel.

f) Rating & diagram plate for reactors, NGR, SA and current


transformers.

g) Terminal marking plate conforming to IEC-289 / IS:5553 (Part-I).

h) Two earthing terminals each on Reactor tank, NGR tank, Radiator


& marshalling box, SA structure etc.

i) Magnetic type oil level indicator with 250mm dia. Dial and alarm
initiating contracts for low oil level. Taps or valves shall not be
fitted on oil gauge.

j) Suitable neutral bus connection. In case of 1-Ø Reactors all


accessories including 2” IPS Aluminum pipe for forming the
neutral shall be supplied.

k) Double float Buchholz Relay with alarm and tripping contacts.

l) Oil sampling and drain valve.

m) Filter valves at top and bottom.

n) Shut off valves on the pipe connection between radiator bank and
reactor bank.

o) Shut off valves on both sides of Buchholz relay at accessible


height.

p) Sampling gas collectors, for Buchholz relay at accessible height.

Sign & Seal of Bidder Page 31 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

q) Four jacking pads.

r) Lifting lugs or eyes for the cover

s) Suitable terminal connectors on all bushings and surge arrester,


as decided during detailed engineering.

t) Under-Carriage with flanged bi-directional wheels.

u) Drain valves/plugs shall be provided in order that each section of


pipe work can drained independently.
v) All the gaskets to be provided shall be of RC70C or RC80C grade.
Necessary tests certificates from manufacturer shall be submitted
along with acceptance test report. The gasket to be used shall not
be older than One year.
w) Necessary provision for installation of On Line gas & moisture in oil
monitoring system, in line with Annexure, shall be made for
satisfactory performance throughout the life of shunt reactor.
Location and size of the same shall be finalized during detailed
engineering.
x) Necessary provision shall be made for installation of Nitrogen
Injection Fire Prevention cum extinguishing system. Location will be
decided during detailed engineering, in the event of an order.

2.17.0 A) Oil Temperature Indicator:

All shunt reactors and neutral grounding reactors shall be


provided with thermometer pocket for 150 mm dial image sensing
type mercury free, thermometer for top oil temperature indication.
The thermometer shall have adjustable, electrically independent,
potential free contacts, compatible for SCADA remote operation,
for.

i) Oil temperature High alarm.


ii) Independent potential free contacts for alarm and tripping
for oil temperature too high conditions.
The maximum reading pointer and resetting device for the thermometer
shall be mounted in the marshalling box. A temperature sensing
element suitably located in a pocket on top oil shall be furnished. This
shall be connected to OTI by means of capillary tubing. Temperature
indicator dials shall have linear gradations to clearly read at least 2ºC.
Accuracy class of OTI shall be ±1.5% or better.

B) Winding Temperature Indicator:

All shunt reactors and neutral grounding reactors shall be


provided with thermometer pocket for 150 mm dial image sensing
type mercury free, thermometer for top oil temperature indication.
The thermometer shall have adjustable, electrically independent,

Sign & Seal of Bidder Page 32 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

potential free contacts, compatible for SCADA remote operation &


comprise of the following:

i) Temperature sensing element.


ii) Image coil
iii) Auxiliary Current Transformer if required to match the
image coil shall be furnished and mounted in the
marshalling box.
iv) 150 mm dia local indicating instrument with maximum
reading pointer mounted in marshalling box and with
adjustable electricity independent ungrounded contacts,
besides that required for control of cooling equipment, one
for high winding temperature alarm and one for trip.
v) Calibration device.
vi) Automatic ambient temperature compensation In addition
to the above, the following remote indication equipment
shall be provided.

a) Signal transmitter
Signal transmitter shall have additional facility to transmit
signal for recording winding temperature at Employer’s
data acquisition system, for which a duplex platinum RTD
with nominal resistance of 100 ohms at zero degree
centigrade shall be supplied.
The RTD shall be three wire ungrounded system. The
calibration shall be as per relevant standard. The RTD may
be placed in the pocket containing temperature sensing
element and image coil for WTI system which will be used
for both remote WTI and DAS. Necessary equipment for
sending each of these functions shall be provided.
b) Remote winding temperature indicator. It shall be suitable
for flush mounting on owner's panel. This shall not be
repeater dial of local WTI and will operate by signal
transmitter.
A temperature sensing element suitably located in a pocket on top oil
shall be furnished. This shall be connected to WTI by means of capillary
tubing. Temperature indicator dials shall have linear gradations to clearly
read at least 2ºC. Accuracy class of WTI shall be ±1.5% or better.

C) Fiber Optic sensor temperature indicator system: Temperature


measurement of Oil and winding shall also be done using Fiber Optic
Sensors, meeting following criteria:
1. System shall be fiber optic rugged, proven technology. The probes
shall be directly installed in each phase of shunt reactor to measure
the winding hotspot and top oil temperature. There will be total four
probes inside the shunt reactor, out of which one probe should be
installed at top of the shunt reactor for the detection of top oil
temperature.
2. The remaining three (3) Fiber Optic probes should be installed in
each phase at the hottest spots of each of the phase windings. The

Sign & Seal of Bidder Page 33 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

locations of the probe shall be proposed by the Manufacturer and


locations finalized by agreement of the purchaser.
3. Probes shall be able to be completely immersed in hot oil; they shall
withstand exposures to hot kerosene vapor during the shunt reactor
installation drying process.
4. Temperature range of the system should be -30ºC to +200 ºC &
accuracy of ±1% with no recalibration required.
5. Probes shall be 200 μm all silica double PFA Teflon jacketed, Kevlar
cable / PTFE (Teflon) jacketed cable fiber with perforated outer jacket
to allow complete oil filling and white Teflon protective Helix wrap for
improved visibility and mechanical strength.
6. System should include analog outputs for each measurement
channel. Temperature resolution of the analog outputs shall be ±0.1
ºC and the systems shall offer a user programmable temperature
alarm outputs with 6 relays, alarm lights and controller system
status indicators. All inputs and outputs of the system shall meet the
requirements of surge test of IEEE C37.90.1-1989 in which a 3000V
surge is applied to all the inputs and outputs without permanent
damage to the instrument.
7. The system shall be capable of retaining temperature data of 90 or
more days at rate of One reading per minute and should retain
maximum temperature of each channel until reset.
8. The manufacturer should submit data showing that the probes are
located in the hottest point of the winding.
9. The Fiber Optic cable should be brought out of the main tank
through tank wall penetrator feed through plate. The feed through
plate shall be welded on the tank. The external fiber optic extension
cable shall then be run to main control cabinet, routed inside the
conduits with large bend radiuses.
10. The controller shall be housed in cooler control cabinet.
Temperature rise test measurements shall be made with FO
thermometers. The equipment shall be operational during
temperature tests and demonstrated during these tests. During
probe verification, the hottest probes for each phase shall be
identified, and temperature data for all probes recorded and
reported in the test report.
11. Shunt reactor manufacturer shall confirm for full guaranteed
performance of shunt reactor with provision of FO sensors system.
FO system shall cover all required accessories to indicate
temperatures at local, remote and shall be SCADA compatible.
Suitable change over facility of alarm & control contacts shall be
provided for conventional thermal image type temperature indicators
and fiber optic temperature indicators.
12. The FO system shall have suitable length of FO cable, sensor and
probes.
13. The output of FO system shall be suitable for PC interface with USB
port. All required softwares shall be provided.
14. Any other accessories required for satisfactory operation of fiber
optic sensor temperature measurement system shall be provided.

Sign & Seal of Bidder Page 34 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

15. All the type tests reports as per relevant standard shall be submitted
with the technical bid. Acceptance tests shall be performed as per
relevant standard.
16. Services of FO system supplier during manufacturing, testing,
commissioning and after sales even beyond guarantee period shall
have to be arranged and provided by the bidder.
2.17.1 The centre of gravity of the assembled shunt reactor shall be low
and as near the vertical centre line as possible. The shunt reactor
shall be stable with or without oil.

2.18.0 TESTS AND INSPECSTIONS:

2.18.1 Routine tests on shunt reactors:

All the routine/acceptance tests listed in IEC-289/IS-5553 (Part-I) shall


be carried out on all the Reactors. In addition the following routine tests
shall also be carried out on each Shunt Reactor. All the instruments,
meters, etc., used for testing shall be duly calibrated at NABL
laboratory and necessary calibration certificate shall be made
available during inspection. The instrument transformers shall have ≤0.2
accuracy class. The measurement of losses shall be carried out with 3 (Three) Watt
meter method only through digital power analyzer and CTs, PTs and meters used for
these measurements shall be of class of accuracy of 0.2.

i) Switching impulse on line terminals IS:2026 (Part-III)

ii) Induced over-voltage with partial discharge measurement as per


PD Measurement test shall be carried out as per IEC 60076-3 cl.
12.4.
Acceptance Criteria for PD:
PD levels measured at the end of 60 minute test period shall not
exceed 100 pC or show any rising tendency in the last 15 minutes
of more than 5%. Gas evolution of DGA before and after PD test
shall be interpreted in line with IEC/ CIGRE guidelines.

iii) Oil leakage test on Reactor tank.

All tanks and oil filled compartments shall be completely filled with
air/oil of a viscosity not greater than that of insulating oil to IS:335
at the ambient temperature and subjected to a pressure equal to
normal tank pressure plus 35 KN/m2 (5 lbs/sq.in) measured at the
base of the tank. This pressure shall be maintained for a period
of not less than 12 hrs. for oil and for 1 hour for air during which
no leakage shall occur.

iv) SFRA test at factory and at site.


v) Vibration and stress measurement test.
vi) Load Loss and current measurements:
The load losses and load current of every reactor shall be
measured as specified in IEC 60076/ IEC 60289. Measurements
shall also be made with maximum flux condition in magnetic

Sign & Seal of Bidder Page 35 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

circuit. In each case the measurement shall be made at 0.90pu,


1.00pu & 1.10pu.

The following details shall be recorded and submitted with the


test certificates
(a) The voltage readings.
(b) The mode of response and scaling of voltmeters.
(c) The current reading.
(e) The power reading.
(f) The frequency reading.
(g) The instrument constants and correction.
(h) Correction made to power and current results due to non
sinusoidal wave form of voltage and current.
(j) The magnetization curve of the reactor

vii) Core assembly dielectric and earthing continuity tests


The insulation of the magnetic circuit and between the magnetic
circuit and the core clamping structure, including core bolts,
bands and / or buckles shall withstand the application of a test
voltage of either 2 kV AC or 3 kV DC for 60 seconds.

viii) Reactance and loss measurement


(a) The type tested unit shall be measured in cold and hot state
(b) In other units, measurement shall be carried out in the cold
state and corrected as per factors derived from type tests.
ix) Measurement of capacitance and tan delta to determine
capacitance between winding and earth. Tan delta value shall not
be more than 0.5% corrected at 20 deg Cent. Temperature
correction factor table shall be given by the bidder and shall form
the part of test results. The Maximum Limit of value of tan delta shall
be 0.5 % for windings, 0.4% for bushings and 0.2 % for oil.

x) Tests on FOS (Fiber optic system)


xi) Tests on Air cell
xii) Tests on oil: Tests on shunt reactor oil including DGA on selected
sample as per IS: 9434/IEC:60567, before & after temp rise test
and at final stage before dispatch including Corrosive sulphur
detection test as per IEC 62535 subjecting oil for 150oC for 72 hrs, as
specified in Appendix – A (Revised).
xiii) Vacuum test on Reactor tank
xiv) Pressure test on Reactor tank
xv) Tests pressure relief device
xvi) The Partial Discharges in the reactor at the time of dispatch shall not be
more than 500 pC. Moreover, PD levels measured at the end of 60
minutes test period shall not exceed 100 pC or show any rising
tendency in the last 15 minutes of more than 5%xvii) Separate
source voltage withstand test
xviii) Measurement of insulation resistance of winding
xix) High voltage withstand test on auxiliary equipment and wiring
after assembly.
xx) Measurement of knee point voltage and tests on bushing CTs

Sign & Seal of Bidder Page 36 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

xxi) Appearance construction and dimensional checks


xxii) Measurement of Zero sequence
xxiii) Measurement of water content in reactor (Limit 0.7% of total
insulation by weight) by Karl Fischer titration method specified in IEC.

2.18.2 Type tests on Shunt Reactor:


Following type tests reports shall be submitted with the offer. The type
test reports shall not be older than FIVE years and shall be valid as on the last
date of submission of bid.
Important note for type tests: The type test report shall be submitted for the offered class and rating
of reactor. However, the type test report for higher class/rating can be accepted for scrutiny of technical
bid but the same test/s shall have to be carried out on the offered class/rating reactor. Bidder shall
invariably confirm to carry out the required type test/s, special tests, before commencement of supply,
without affecting delivery schedule, free of cost, at NABL approved laboratory, or at suppliers works in
presence of NABL & GETCO representative, in the event of order.

i) Measurement of winding resistance


ii) Reactance measurement
iii) Measurement of harmonic content of phase current
iv) Temperature rise test
v) Lightning impulse voltage withstand test
vi) Lightning impulse voltage withstand test on neutral
vii) Switching impulse test
viii) Measurement of acoustic noise level
ix) Vibration and stress measurement
x) Knee point voltage measurement of reactor
xi) Measurement of load loss and current
xii) Tests on Fiber Optic sensors
xiii) Seismic withstand calculation
xiv) Degree of protection test on Marshalling box, as per IP:55 in accordance
with IS:13947
xv) Tests on Air cell
xvi) Tests on bushings

Following type tests shall be conducted on each Shunt Reactor of each rating:

i) Test of temperature rise - clause 17.4 of IEC-60289. Gas


chromatographic analysis test on oil shall be conducted before and after
this test. The sampling shall be in accordance with IEC-60567. For the
evaluation of the gas analysis in temperature rise test, the procedure
shall be as per IS:9434 (based on IEC:60567) and results interpreted as
IS:10593 (based on IEC-60599/CIGRE guideline). The test shall be
done for a minimum of 24 hrs with saturated temperature for at
least 4 hrs.
The temperature rise measurements shall be made with the Fiber Optic
Thermometers & conventional OTI/WTI. The FOS shall also be
operational during temperature tests and demonstrated during these
tests. During probe verification, the hottest probes for each phase shall
be identified, and temperature data for all probes recorded and reported
in the test report. Data obtained from FOS and conventional OTI/WTI
shall be compared however, both values should satisfy the commitment.

Sign & Seal of Bidder Page 37 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

The thermometers used during test shall be digital having calibrated in


NABL lab. Calibration certificate shall not be older than one year.

ii) Measurement of Zero-Sequence reactance clause 7.4(a) of IS: 5553 (Part


– 2) for 3 – ph reactor only.
iii) Measurement of acoustic noise level clause 16.12 of IS: 2026 (Part-I)/
IEC: 60076
iv) Lightning impulse test on Line and neutral IS: 2026 (Part-III / IEC:
60076).
v) Measurement of winding resistance
vi) Reactance measurement
vii) Measurement Harmonic content of phase current
viii) Switching impulse test
ix) Measurement of knee point voltage of reactor
x) Measurement of load loss and current
xi) ACLD test

2.18.3 Routine tests on neutral grounding reactor:

In addition to the routine tests listed in the IEC-289 / IS:5553 the volt-
current characteristics test shall also be carried out on each neutral
grounding reactor preferably at least up to short time rated current.
Calculated value of hot spot temperature shall be furnished by the
contractor. Further lightning impulse voltage test and ohmic value
measurement shall be carried out.

2.18.4 Type tests on neutral grounding reactor:


The following type tests shall be conducted on one neutral grounding
reactor.
i) Impulse voltage withstand test (as per IEC-289). If the bidder wishes
to utilize the option of conducting impulse voltage withstand test as a
routine test in lieu of inter turn voltage withstand / induced over
voltage withstand test, there is no need to conduct this test as a type
test.
ii) Tank vacuum and tank pressure tests on one NGR tank.

2.18.5 Routine tests on Surge Arrester: The surge arresters shall conform to
shall be subjected to routine tests as per IEC: 60099-1/IEC:60099-4.
Also following additional acceptance tests shall be performed
1. Constructional check (visual check)
2. Measurement of insulation resistance by 1 kV megger.

2.18.6 Type tests on Surge Arrester: The surge arresters shall conform to
type tests as per IEC: 60099-1 / IEC: 60099-4.

2.18.7 Routine tests on bushings:


The following tests shall be conducted on bushings as per IEC: 60137
i) Test for leakage on internal filling
ii) Measurement of creepage distance, dielectric dissipation factor
and capacitance.

Sign & Seal of Bidder Page 38 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

iii) Dry power frequency test on terminal and tapping


iv) Partial discharge test followed by dielectric dissipation factor and
capacitance measurement.

2.18.8 Type tests on bushings:


All the type tests as per IS: 2099 / IEC: 60137 including snap back test.

2.18.9 Routine tests on fittings:


i) PRD: Each pressure relief device shall be subjected to increase in oil
pressure. It shall operate before reaching the test pressure specified
in reactor tank pressure test. The operating pressure shall be
recorded. The device shall seal off after excess pressure has been
released.
ii) Buchholz relay & OSR: The oil shall be drained through drain plug
and to check for instant operation of alarm and tripping contacts.

2.18.10 Type tests on fittings:


i) Buchholz relay: As per IS:3637
ii) Terminal box for buchholz relay, PRD, MOG, OSR, control cabinet,
MK box, etc.: Degree of Protection IP:55 (Material, thickness & type
of gasket shall be indicated)
iii) PRD: The pressure relief device of each size shall be subjected to
increase in oil pressure. It shall operate before reaching the test
pressure specified in reactor tank pressure test. The operating
pressure shall be recorded. The device shall seal off after excess
pressure has been released.
iv) Air Cell (Flexible air separator): Oil side coating, Air side under
coating, Air side outer coating & coated fabric: IS: 3400 / BS:903 / IS:
7016.
v) OTI & WTI: Switch setting & operation, switch differential, switch
rating.
vi) Terminal connector: As per IS: 5561
1) Tensile test
2) Resistance test
3) Temperature rise test
4) Short Time current withstand test (40 kA for 3 sec)
5) Dimensional checks
6) Galvanizing test
7) Chemical analysis test
8) Corona and RIV measurement test (for 400 kV and above)

2.18.11 The owner will have the right of having at its own cost any other test(s)
of reasonable nature, carried out at contractors premises or at site or at
any other place in addition to the aforesaid type and routine tests to
ensure that the equipment complies with the specification.

2.18.12 All the tests would be carried out at full voltage and frequency.

2.18.13 If the tests cannot be done at factory with full voltage and frequency due
to any reason, then these would be carried out by alternative methods

Sign & Seal of Bidder Page 39 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

as per the provision in IEC-289/ IS:5553. In such a case no extra cost


will be paid by the purchaser due to alternate / modified test methods.

2.18.14 The owner reserves the right to witness any or all of the tests.

2.18.15 Factory tests:


The manufacturer shall be fully equipped to perform all the required tests
as specified. Bidder shall confirm the capabilities of the proposed
manufacturing plant in this regard when submitting the bid. Any
limitations shall be clearly stated.
The contractor shall bear all additional costs related to test which are not
possible to carry out at his own works.
A typical test plan for reactor is indicated below. The contractor shall
submit an inspection and test plan (ITP) of each item separately for
approval.

Sr Reports to be Routine /
No Tests submitted for Type test Acceptance
offered Unit tests
On Each On every
With tech Bid
Unit Unit
1 Measurement of winding resistance √ √
2 Reactance measurement √ √ H/C
3 Measurement of harmonic content of
√ √C
phase current
4 Temperature rise test √ √
5 Lightning impulse test √ √
6 Lightning Impulse on Neutral √ √
7 Switching impulse test √ √ √
8 Measurement of Acoustic noise level √ √H/C
9 Vibration and stress measurement √ √ H/C
10 Knee point voltage measurement of
√ √C
Reactor
11 Measurement of Load loss and √

current
12 Tests on Fiber Optic Sensors √ √
13 Seismic test √
14 Degree of protection for all

cubicles/boxes
15 Tests on Air Cell √ √
16 Tests on Bushings √ √
17 Separate source voltage withstand

test
18 Measurement of Partial Discharges √
19 Tank Vacuum test √
20 Tank Pressure test √
21 Measurement of Zero Sequence

reactance (3 phase)
22 Measurement of insulation resistance

of windings
23 Measurement of insulation power
factor and capacitance between √
winding and earth

Sign & Seal of Bidder Page 40 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

24 Induced over voltage test with P D



measurement
25 ACLD test √
26 Tests on Oil (DGA at initial, after
temp rise & at final stage before √
dispatch
27 Appearance, construction and

dimension check
28 Core assembly dielectric and

earthing continuity test
29 Sweep Frequency Response

analysis at FAT & SAT
30 High voltage withstand test on
Auxiliary equipment and wiring after √
assembly
31 Oil leakage on assembled Reactor √
32 Tests on Pressure Relief Devices √
33 Meas of Knee point voltage & tests of

bushing CT

H/C Measured in Hot and Cold state of temperature rise test


C Measured in cold state

2.19.0 TANK TESTS:


a) Vacuum Test
All Reactor tank and neutral grounding reactor tank shall be subjected
to the specified vacuum. The tank designed for full vacuum (760mm of
mercury at sea level) shall be tested at an internal pressure of 3.33 KN/
M2 absolute (25 torr) for one hour. The permanent deflection of flat
plates after the vacuum has been released shall not exceed the values
specified below:-
Horizontal length of Flats plate Permanent
( in mm) deflection (in mm)
Up to and including 750 5.0
751 to 1250 6.5
1251 to 1750 8.0
1751 to 2000 9.5
2001 to 2250 11.0
2251 to 2500 12.5
2501 to 3000 16.0
Above 3000 19.0

b) Pressure Test:

All reactor tank and neutral grounding reactor tank of each size together
with its radiator, conservator vessel and other fittings shall be subjected to a
pressure corresponding to twice the normal head of oil or normal pressure
plus 0.35 kg/cm2 whichever is lower, measured at the base of the tank and
maintained for one hour. The permanent deflection of flat plate after the

Sign & Seal of Bidder Page 41 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

excess pressure has been released shall not exceed the figures specified
above.

c) Relief Device Test:

The pressure relief device of each size shall be subjected to increasing oil
pressure and shall operate before reaching the test pressure specified in
test at (b). The operating pressure shall be recorded.
Following routine tests shall be performed on PRD
i) Air pressure test
ii) Liquid pressure test
iii) Contact test
iv) Leakage test
v) Dielectric test

2.19.1 a) Two (2) sets of certified test reports and oscilograms shall be submitted
for approval prior to dispatch of the equipment. The equipment shall be
dispatched only when all the required type and routine tests have been
carried out and their test reports have been approved by the owner.

b) Two (2) copies of the test reports for the tests carried out on the ancillary
apparatus shall be furnish to the owner for their approval prior to
dispatch.

2.20.0 INSPECTION:
a) The bidder shall carryout a detailed inspection and testing
programme for manufacturing activities of the various
components. An Inductive programme of inspection as envisaged
by the engineer is given below. This is not however, intended to
form a comprehensive programme as it is contractor's
responsibility to draw up and carryout such a program duly
approved by the Engineer.

b) Cost of inspection / test is to be borne by the Contractor.

c) Additional tests, if required are to be deemed as included in the


scope of work.

d) Stages of inspection and owner's participation would be


defined and tied up at the time of award of contract.
Photographs shall be taken jointly and submitted with
inspection report.
e) The bidder shall guarantee that the goods are new and of
high quality and the goods will be free from defects in
design.

2.20.1 TANK AND CONSERVTOR:

a) Certification of chemical analysis and material tests of plates.


b) Welder's and welds procedure qualification.

Sign & Seal of Bidder Page 42 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

c) Testing of electrodes for quality of base materials.


d) Inspection of major weld preparation.

e) Crack detection of major strength weld seems by dye penetration


tests.
f) Measurement of film thickness of
- Oil insoluble varnish
- Total paint thickness.
- Light grey paint.
g) Check correct dimensions between wheels, demonstrate turning
of wheels through 90ºC and further dimensional check.
h) Check for physical properties of materials for lifting lugs, jacking
pads etc. All load bearing welds including lifting lugs welds shall
be subjected to NDT.
i) Leakage test of the conservator.
j) Certification of all test results.

2.20.2 CORE:

a) Sample testing of core material (mother coil, laminations & core


packets) for checking specified loss, bend properties,
magnetization characteristics and thickness.
b) Check on the quality of varnish if used on the stampings.
c) i) Measurement of thickness of varnish on stampings.
ii) Solvent resistance test to check the varnish does not react
in hot oil.
iii) Check over all quality of varnish on stamping to ensure
uniform shining colour, no bare spots; No over burnt
varnish layer and no bubbles on varnish surface.

d) Check on the amount of burrs.


e) Bow check on stampings.
f) Check for the overlapping stampings, corners of the sheets are to
be apart.
g) Visual and dimensional check during assembly stage.
h) Check for inter-laminar insulating between core sections before
and after pressing.
i) Check on completed core for measurement of iron loss and check for
any hot spot either by exciting the core or by suitable software so as
to induce the designed value of flux density in the core. The losses
shall be actually measured on built up core with dummy turns or can
be demonstrated through suitable software to GETCO representative
and the report for the same shall be submitted. However, during final
inspection the losses shall be actually measured & the same shall be
within guaranteed losses.
j) Visual and dimensional checks for straightness and roundness of
core, thickness of limbs and suitability of clamps.
k) High voltage test (2 kV for one minute) between core and clamps.
l) Certification of all test results.

Sign & Seal of Bidder Page 43 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

2.20.3 Insulating Materials

a) Sample check for physical properties of material.


b) Check for dielectric strength.
c) Visual and dimensional checks.
d) Check for the reaction of hot oil on insulating materials.
e) Certificate of all test results.\

2.20.4 Winding:

a) Sample check on winding conductor for mechanical properties


and electrical conductivity.
b) Visual check on conductor for scratches, dent marks etc.
c) Sample check on insulating paper for PH value, electric strength.
d) Check for the reaction of hot oil in insulating paper.
e) Check for the bending of the insulating paper on conductor.
f) Check and ensure that physical condition of all material taken for
winding is satisfactory and free of dust.
g) Check for absence of short circuit between parallel strands.
h) Check for brazed joints wherever applicable.
i) Measurement of voltage to be carried out when core/yoke is
completely restacked and all connections ready.
j) Certificate of all test results.

2.20.5 Check before drying process:

a) Check conditions of insulation on the conductor and between the


windings.
b) Check insulation instances between high voltage connection
cables and earth and other live parts.
c) Check insulation distance between low voltage connections and
earth and other parts.
d) Insulation test of core earthing.
e) Check for proper cleanliness and absence of dust etc.
f) Certification of all test results.

2.20.6 Check during Drying Process:

a) Measurement and recording of temperature and drying time


during vacuum treatment.
b) Check for completeness of drying.
c) Certification of all test results.

2.20.7 Assembled Reactor:

a) Check completed reactor against approved outline drawing:


Provision for all fittings, finish level etc.
b) Jacking test on all the assembled reactors.

The contractor shall also prepare a comprehensive inspection and


testing programme for all brought out/sub contracted items and shall

Sign & Seal of Bidder Page 44 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

submit the same to the Engineer for approval. Such programme shall
include the following:

a) Buchholz Relay
b) Sudden/rapid pressure rise release relay.
c) Axles and wheels/trolley for transportation.
d) Winding temperature indicators for local and remote mounting.
e) Oil temperature indicators.
f) Bushings
g) Bushing Current Transformers
h) Pressure Relief Device
i) Marshalling box
j) Radiators
k) FO system

2.21.0 PRE SHIPMENT CHECKS AT MANUFACTURER'S WORKS:

a) Check for interchange ability of components of similar Reactors


for mounting dimensions.
b) Check for proper packing and preservation of accessories like
radiators, bushings, explosion vent, dehydrating breather, rollers,
buchholz relay, control cubicle, connecting pipes conservator etc.
c) Check for proper provision of bracings to arrest the movement of
core and binding assembly inside the tank.
d) Gas tightness test to conform tightness’.
e) Derivation of leakage rate and ensure adequate reserve gas
capacity.

2.22.0 INSPECTION AND TESTING AT SITE:

The contractor shall carryout a detailed inspection and testing


program for field activities, namely, covering area right from the
receipt of material stage up to commissioning stage. An
indicative programme of inspection as envisaged by the engineer
is given below. This is however not intended to form a
comprehensive programme as it is Contractor's responsibility to
draw up and carry out such a program duly approved by the
Engineer.

2.23.0 RECEIPT AND STORAGE CHECKS:

a) Check and record condition of each package, visible part of the


Reactors etc. for any damage.
b) Check and record of he gas pressure in the reactor tank as well
as in the cylinder.
c) Visual check for wedging of core and coils before filling up with oil
and also check condition of core and winding in general.

2.24.0. INSTALLATION CHECKS:

Sign & Seal of Bidder Page 45 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

Test on oil samples taken from main tank top and bottom and cooling
system and tested for all tests including DGA.
Sample should be taken only after the oil has been allowed to settle for
24 hours.
a) Check the whole assembly for tightness, general appearance etc.
b) Oil leakage tests
c) The contractor shall warrant that oil supplied is in accordance with
the specification given in this specification.
d) Capacitance and tan delta measurement of bushings before fixing /
connecting to the winding. Bidder shall furnish these values for site
reference.
e) Sweep Frequency Response Analysis (SFRA) test

2.25.0 COMMISSIONING CHECKS:

a) Check the colour of silicagel of breather.


b) Check the oil level in the breather housing, conservator tank,
cooling system, condenser, bushing etc.
c) Check the bushings for conformity of connection to the line etc.
d) Check for correct operation of all protections and alarms.
i) Buchholz Relay
ii) Excessive winding temperature
iii) Low oil flow
iv) Excessive oil temperature
v) Low oil level indication.

e) Check for adequate protection on electric circuit supplying the


accessories.
f) Insulation Resistance measurement.
g) Check for cleanliness of the Reactor and the surrounding.

2.26.0 ERECTION AND COMMISSIONING

2.26.1 The bidder shall quote for the services of an Erection Engineer who shall
assume full responsibility for the erection, testing and commissioning of
the equipment. Skilled and unskilled labour and normal erection tools
would be provided by the purchaser. All special erection tools as well as
instruments required for the erection, testing and commissioning of the
Shunt Reactors shall be provided by the bidder.

2.26.2 Bidder shall indicate days and per man-day rates for the services of the
Erection Engineer. Bidder shall also indicate the estimated duration
required for the Erection, testing and commissioning of the equipment
offered.

2.26.3 Purchaser shall provide local workman as well as all ordinary tools
required for erection, at his own expense, Apart from the above, the
purchaser shall not be responsible for any other expenses incurred by
the bidder and expenses such as Erector's salary, insurance against
personal injuries to the Erectors etc. shall be to the Tender's account.

Sign & Seal of Bidder Page 46 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

2.27.1 PACKING AND TRANSPORT INSTRUCTIONS:

2.27.1 Bidder shall ensure that all equipment covered by this specification shall
be prepared for rail/road transport and be packed in such a manner as to
protect it from damage in transit. The bidder shall be responsible for and
make good at his own expense any or all damage due to improper
preparation and packing. The Purchaser shall not be responsible for any
damage to the equipment during commissioning if such damage results from
faulty or inadequate action.
Purchaser shall not be liable for any loss, damage or injury to property or
persons at the installation site unless such damages or injuries are caused by
any and or negligence of the supervising erector. The reactor shall be fitted
with sufficient number of impact recorders during transportation to
measure the movement due to impact in all three directions. The impact
recorder shall be provided with suitable communication port (USB port)
to down load data at any time. The impact recorder shall be returned
after submission of all the data in hard and soft copy.

2.27.2 Loose materials, bolts, nuts, etc. shall be packed in gunny bags and
sealed in polythene bags with proper tagging.
2.27.3 Components containing glass shall be carefully covered with shock
absorbing protective material such as 'Thermo Cole'.
2.27.4 All opening in the equipment shall be tightly covered plugged or capped
to prevent dust and foreign material from entering in.
2.27.5 Wherever necessary, proper arrangements for attaching slings for lifting
shall be provided.
2.27.6 Any material found short inside the intact packing cases shall be
supplied by the Vendor/contractor at no extra cost to the Purchaser.
2.27.7 No material shall be dispatched without prior consent of the purchaser or
his authorised representative.

2.28.0. TECHNICAL AND GUARANTEED PARTICULARS

The bidder shall furnish al guaranteed technical particulars as called for


in Schedule - B, Section-II of this specification. Bids lacking information
in this respect may not be considered.

2.29.0. REACTOR LOSSES, EVALUATION OF BID & acceptance/ rejection:


The shunt reactor shall be designed with maximum permissible losses as
indicated below.
Rated Total maximum loss at Rated Total maximum loss at
MVAr rated voltage and MVAr rated voltage and
frequency, in kW frequency, in kW
50 85 63 117
80 135 125 185

Sign & Seal of Bidder Page 47 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

As we have specified fixed loss figures of total maximum losses, manufacturers


have to adhere to these figures by designing shunt reactor suitably. Bidder will not
be asked to give any loss figure in GTP. Therefore there will be no capitalization at
tender stage.
The order will be placed to lowest price bidder as per GETCO policy and actual
losses measured during acceptance. It will be at discretion of GETCO to
accept/reject the unit whenever there is positive variation in the losses measured
at actual.
However, the unit shall not be accepted in the event measured losses are beyond
5% of fixed loss figures specified above.
Penalty towards the higher losses within above limits shall be recovered at a rate
of 3 times capitalization cost of 3,33,000/- per kW

It is also proposed that testing of unit will be carried out in presence and witness of
third party selected by GETCO at the discretion of GETCO.

In case of any order, the losses of successful bidder will be measured during
acceptance testing and if the figures of looses are found equal to or lesser than
specified above, the shunt reactor shall be accepted. However, if any of the loss
figure measured during acceptance test is found more than specified above, the
shunt reactor will not be accepted. There shall be no provision for penalty for
acceptance of shunt reactor with losses higher than specified above. Bidder shall
submit undertaking separately for the same, with the technical bid. The
measurement of losses shall be carried out with 3 (Three) Watt meter method only
and CTs, PTs and meters used for these measurements shall be of class of
accuracy of 0.2.

However, no weightage shall be given for supply of shunt reactor, with losses
(measured during routine tests) less than the above specified losses.

2.29.1 REJECTION:
The Purchaser shall reject shunt reactor, if any of the following conditions during or
service arises:
i) Load losses exceed the guaranteed value.
ii) Reactance value deviates from the guaranteed value by + 10% or more.
iii) Oil or winding temperature rise exceeds the specified value.
iv) Shunt reactor fails to withstand any of the dielectric tests.
v) Shunt reactor fails to pass any of acceptance tests.
vii) Shunt reactor is proved to have been manufactured not in accordance with
agreed specification.

The Purchaser reserves the right to retain the rejected Shunt reactor and use it until
the bidder replaces the defective Shunt reactor by a new Shunt reactor, as a stop gap
arrangement, within a reasonable period, at no extra costs to the GETCO. Defective
Shunt reactor may be replaced by new acceptable Shunt reactor. In such case the
transportation, loading, unloading on plinth, inspection, erection, testing &
commissioning charges shall be borne by the bidder.

Sign & Seal of Bidder Page 48 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

2.30.0 SURGE ARRESTER:

2.30.1 GENERAL:
The surge arrester shall conform in general to IS: 3070(part-I) and
IEC:60099-1 or IEC:60099-4 except to the extent explicitly modified in
the specification.
The bidder shall offer surge arresters of gapless type without any series
or shunt gap.
Arresters shall be hermetically sealed units, of self supporting
construction, suitable for mounting on structures.

2.30.2 Duty Requirements:


i) The surge arresters shall be of heavy duty station class type. It shall be
physically located between the neutral of 420 kV shunt reactor (brought
out at 145 kV class bushing) and neutral grounding reactor and shall be
electrically in parallel with the latter.
ii) The surge arrester shall be capable of discharging over voltage
occurring during switching of unloaded transformers and reactors.
iii) Surge arresters shall be capable of spark over on severe switching
surges and multiple strokes.
iv) The surge arrester shall be able to withstand wind load calculated at 150
kg/sq.m.
v) The gapless arrester shall meet following additional requirements.
a) It shall be fully stabilized thermally to give a life expectancy of
100 years under site conditions and shall take over care of the
effect of direct solar radiation.
b) The reference current of the arrester shall be high enough to
eliminate the influence of grading and stray capacitance on the
measured reference voltage.

2.30.3 Constructional Features:


The features and constructional details of surge arresters shall be in
accordance with requirement stipulated hereunder:

a) Gapless Type Surge Arrester


i) The non linear blocks shall be of sintered metal oxide Material. These shall
be provided in such a way as to obtain robust construction, with excellent
electrical and mechanical properties even after repeated operations.
ii) The surge arrester shall be fitted with pressure relief devices and arc
diverting parts suitable for preventing shattering of porcelain housing and
providing path for flow of rated fault currents in the event of arrester failure.
iii) The arresters shall be incorporated anti-contamination feature to prevent
arrester failure consequent to uneven voltage gradient across the stack in
the event of contamination of the arrester porcelain.
iv) Seals shall be provided in such a way that these are always effectively
maintained even when discharging rated lightning current.
v) Outer insulator shall be porcelain used shall be homogenous, free from
laminations, cavities and other flaws or imperfection that might affect the
mechanical or dielectric quality and shall be thoroughly vitrified, tough and
impressions to moisture. Glazing of porcelain shall be of uniform brown
colour, free from blisters, burrs and other similar defects. Porcelain housing

Sign & Seal of Bidder Page 49 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

shall be so coordinated that external flashover will not occur due to


application of any impulse or switching surge voltage up to the maximum
design value for arrester.
vi) The end fitting shall be made of non-magnetic and corrosion proof material.
vii) The name plate shall conform to the requirement of IEC incorporating the
year of manufacture.
viii) The arrester shall be supplied with suitable support structure either of
tubular GI pipe or lattice steel galvanized.
ix) The heat treatment cycle details along with necessary quality checks used
for individual blocks along with insulation layer formed across each block to
be furnished. Metalized coating thickness for reduced resistance between
adjacent discs to be furnished along with procedure for checking the same.
Details of thermal stability test for uniform current distribution of current on
individual disc to be furnished.

b) Fittings and Accessories:


i) Each arrester shall be complete with insulating base, support structure and
terminal connector. The height of the support structure shall be such that
required ground clearance as per relevant standard is maintained. The
structure would be made of galvanized steel generally conforming to IS:802.
The surge arrester can also be mounted on the neutral grounding reactor in
lieu of separate support structure.
ii) Self contained discharge counter, suitably enclosed for outdoor use and
requiring no auxiliary or battery supply for operation, shall be provide for
each unit. The counter shall be visible through an inspection window from
ground level. The counter terminals shall be robust and of adequate size
and shall be so located that incoming and outgoing connections are made
with minimum possible bends.
iii) Suitable milli ammeter on each arrester with appropriate connections shall
be supplied to measure the resistor grading leakage current. The push
buttons shall be mounted such that it can be operated from ground level.
iv) Discharge counter and milli ammeter shall be suitable for mounting on
support structure of the arrester.
v) Grading/Corona rings shall be provided on each complete arrester unit as
required for proper stress distribution.

c) Tests:
i) The surge arresters shall conform to type tests and shall be subjected to
routine tests as per IEC: 60099-1 / IEC: 60099-4.
ii) Surge arrester shall be subjected to additional acceptance tests as follow:
1. Constructional check (visual check)
2. Measurement of insulation resistance by 1 kV megger.

2.31 OIL STORAGE TANK:

2.31.1 General
This specification covers supply of oil storage steel tank of 15 cubic meter
capacity along with complete accessories.

2.31.2 Standard

Sign & Seal of Bidder Page 50 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

The oil storage tank shall be designed and fabricated as per relevant Indian
Standards e.g. IS: 803 or other internationally acceptable standards.

2.31.3 Specifications
Transformer oil storage tanks shall be tow able & rested on pneumatic types of
adequate quality & size. The tank shall be to cylindrical shape & mounted
horizontally and made of mild steel plate of adequate thickness. Size of the
storage tank shall be follows:

Diameter : 2.5 meter


Capacity : 15 cubic meters
The tank shall be designed for storage of oil at a temperature of 100ºC.

2.31.3.1 The Bidder may further note that maximum height of any part of the complete
assembly of the storage tank shall not exceed 4.0 meters above road top.

2.31.3.2 The tank shall have adequate number of jacking pad so that it can be kept on
jack while completely filled with oil. The tank shall be provided with suitable
saddles so that tank can be rested on ground after removing the pneumatic
tyres.

2.31.3.3 The tank shall be also fitted with manhole, outside & inside access ladder, silica
gel breather assembly, inlet & outlet valve, oil sampling valve with suitable
adopter, oil drainage valve, air vent etc. Pulling hook on both ends of the tank
shall be provided so that the tank can be pulled from either end while completely
filled with oil. Bidder shall indicate the engine capacity in horse power to pull one
tank completely fitted with oil. Oil level indicator shall be provided with
calibration in terms of litre so that at any time operator can have an idea of oil in
the tank. Four nos. suitable rubber hoses with couplers and unions each not less
than 10 meter long shall also be provided.

2.31.3.4 The internal & external surfaces to be painted shall be short or sand blasted to
remove all rust and scale of foreign adhering matter or grease. All steel surfaces
in contact with insulating oil shall have painted with two coats of heat & oil
resistant anti-corrosive paint.
All steel surfaces exposed to weather shall be given primary coat zinc primer,
second coat of oil & weather resistant paint of a colour distinct from primary and
final two coats of glossy oil & weather resistant light grey paint in accordance
with shade no. 631 of IS: 5. All paint shall be carefully selected to withstand heat
& extremes of weather. The paint shall not scale off or crinkle or be removed by
abrasion due to normal handling. The minimum thickness of outside painting of
tank shall be 20 microns per coat the total thickness shall be within 70 to 100
microns.

Sign & Seal of Bidder Page 51 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

2.31.3.5 The tank shall contain a self mounted centrifugal oil pump with inlet and outlet
valves, with couplers suitable for rubber houses and necessary switchgear for its
control. There shall be no rigid connection to the pump. The pump shall be
electrical motor driven and shall have a discharge of not less than 6 klph with a
discharge head of 8 Mtr. The pump motor and the control cabinet shall be
enclosed in cubicle with IP55 enclosure.

2.32 OIL SAMPLING BOTTLE:

2.32.1 Oil sampling bottle shall be suitable for collecting oil sample from transformer
and shunt reactors for dissolved gas analysis. Bottles shall be robust enough so
that no damage occurs during frequent transportation of samples.
2.32.2 Oil sampling bottle shall be made of Stainless Steel having capacity of ONE litre.
2.32.3 Oil sampling bottle shall be capable of being sealed gas tight and shall be fitted
with cocks on both ends.
2.32.4 The design of bottle & seal shall be such that loss of hydrogen shall not exceed
5% per week.
2.32.5 An impermeable oil proof transparent plastic or rubber tube of about 5 mm
diameter and of sufficient length shall also be provide with each bottle along
with suitable connectors to fit the tube on to the oil sampling valves of the
equipment and the oil collecting bottle respectively.

2.33 QUALITY ASSURANCE PLAN:


The bidder shall invariably furnish following information's along with
his offer, failing which his offer shall be liable for rejection. Information
shall be separately given for individual type of equipments offered.
1. QAP for incoming material, in process and final checks and testing.
2. Statement giving list of important raw materials, names of sub
suppliers for the raw materials, list of standard according to which
the raw materials are tested. List of tests normally carried out on
raw materials in presence of bidder's representatives, copies of test
certificates.
3. Information and copies of test certificates as in (i) above in respect of
bought out accessories.
4. List of manufacturing facilities available.
5. Level of automation achieved and list of areas where manual
processing exists.
6. List of areas in manufacturing process, where stage inspections are
normally carried out for quality control and details of such tests and
inspections.
7. Special features provided in the equipment to make it maintenance
free.

Sign & Seal of Bidder Page 52 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

8. List of testing equipments available with the supplier for final testing
of shunt reactor specified and test plant limitation, if any, for the
special acceptance and routine tests specified in the relevant
standards. These limitations shall be very clearly brought out in 'The
schedule of divinations' for specified test requirements.
Field Quality Plan shall be submitted with the technical bid.

Sign & Seal of Bidder Page 53 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

Section-II

SCHEDULE - B

GUARANTEED TECHNICAL PARTICULARS


(This shall be enclosed with Technical bids)

SHUNT REACTOR:

1. Manufacturer’s Name
2. Governing Standard
3. Type of reactor
4. Type of cooling
5. Connection
6. a) Reactive power for continuous operation (MVAR)
I) At rated voltage
II) At highest voltage ( i.e. 5% higher than rated)
(MVAR)
b) Rated voltage
c) Temperature rise in oil above ambient temp. ºC
d) Temperature rise of winding by resistance above
ambient temperature ºC
e) Rated frequency (Hz)
7. Number of Phases

8. Guaranteed Total losses at rated voltage and rated MVAr kW


frequency and at 75ºC average winding temperature (KW) 50 85
63 117
80 135
125 185
10. Impedance :
a) Positive sequence (Ohms)
b) Zero sequence (Ohms)
11. Ratio of reactor ( i.e. Q-factor)
12. Maximum permissible duration of service at 110% of rated
voltage, starting from cold without exceeding permissible
temperature rise (hrs.)
13. Noise level and reference standard (db).
14. Test voltage (for winding)
a) Lightning impulse (1.2/50 micro-seconds) withstand
voltage (KV peak)
b) Power frequency withstand voltage (KV rms.)
c) Switching surge withstand voltage (KV peak)
15. Clearances:
a) HV phase to Phase (mm)
b) Phase to Ground (mm)
c) Neutral to Ground (mm)
16. Net weights (kgs.)

Sign & Seal of Bidder Page 54 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

a. Total Core including clamping (kgs.):


b. Total core excluding clamping (kgs):
ii) Total weight of laminations (kGs):
iii) Total weight of core packets (kGs):
b. Winding (Only bare copper) (kgs.):
c. Tank and fittings (kgs.):
d. Oil (kgs.) / (liters):
e. Total weight (kgs.)
f. Untanking weight (kgs.)
17. Quantity of oil (including 10% extra) litres.
18. Conservator
a) Total volume
b) Volume between highest and lowest visible oil levels.
19. (a) Size of largest package (mm x mm x mm)
(b) Weight of largest package (kgs.)
(c) Gross weight to be handled (kgs.)
(d) Gross volume to be handled (M3)
20. Bushing as per IS : 2099
a) Type
b) Maker's name and country of Manufacturer
c) Momentary power Frequency withstand voltage
d) One minute power frequency withstanding voltage
i) Dry (KV)
ii) Wet (KV)
e) Power Frequency puncture voltage (KV)
(d) Full wave impulse withstand and voltage (KV)
(f) Impulse puncture voltage (KV)
(h) Total creepage distance in air
(i) Weight and dimensions of assembled
Bushings. (KV)
21. Core
a) Type of core
b) Justification for type of core adopted
c) Technical details of the core

Sign & Seal of Bidder Page 55 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

i) Material
ii) Thickness in mm
iii) Grade (Prime only)
iv) Insulation of core lamination
v) Press board material and thickness
21a. Winding:
i) Material
ii) Cross sectional area of winding
iii) Cross sectional area of conductor
iv) Nos of conductors used
22. Zero Sequence Reactance/ positive sequence reactance
i.e. XO/XI
23. Range of voltage up to which impedance will be constant
and magnetization curve up to 2.5 p.u. Voltage.
24. Vibration level
25. Amount of unbalanced current in each phase when
connected to symmetrical voltages.
26. Lifting jacks (mechanical screw jacks)
a) Governing standards
b) Number of Jacks included in one set.
c) Type and make.
d) Capacity
e) Pitch
f) Lift
h) Mean diameter of thread
27. Capacitance value (Phase to Ground)
28. Type of oil preservation system
29. Harmonic content in Phase current
30. Quality of oil (please enclose separate sheet for
characteristics of oil)
31. Cooling calculation shall be submitted

Sign & Seal of Bidder Page 56 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

SCHEDULE - B

GUARANTEED TECHNICAL PARTICULARS


(This shall be enclosed with Technical bids)

NEUTRAL GROUNDING REACTOR:

i) Rated voltage from insulation strength


considerations
ii) Rated frequency
iii) No of phases
iv) Type
v) Insulation
vi) Max. continuous current
vii) Rated short time current (10 sec)
viii) Rated impedance at rated short time
current
Bushings Line side Ground side
i) Rated voltage
ii) Creepage distance (total) in mm
iii) Mounting
iv) Lightning Impulse (1.2/50 micro sec)
withstand voltage (kVp)
v) Power Frequency withstand voltage (kV
rms)
Connection
Insulation level for winding Line side Ground side
i) Lightning Impulse (1.2/50 micro sec)
withstand voltage (kVp)
ii) Power Frequency withstand voltage (kV
rms)
iii) Max. admissible temperature rise over
ambient temperature of 50ºC at rated
voltage
a) of winding measured by resistance
b) of top oil measured by thermometer
iv) Cooling system
v) Cooling medium
vi) Whether neutral is to be brought out
vii) Method of grounding

Sign & Seal of Bidder Page 57 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

SCHEDULE - B

GUARANTEED TECHNICAL PARTICULARS


(This shall be enclosed with Technical bids)

SURGE ARRESTERS:

1. Name and address of Manufacturer:

2. Manufacturer's type designation :

3. Applicable standards :

4. Arrester class and type :

5. Rated arrester voltage (kV) :

6. Rated system voltage (kV) :

7. Maximum continuous operating voltage :


(COV) at 50 deg.C ambient temperature (kV)

8. Nominal discharge current(8/20 micro :


sec.wave) (kA)

9. Minimum discharge capability ( kJ / kV) :

10. a) Maximum residual voltage at nominal :


discharge current (kVpeak)

b) Minimum residual voltage at nominal :


discharge current (kVpeak)

11. a) Maximum residual voltage at 50 % nominal :


discharge current (kVpeak)

b) Maximum residual voltage at 200% nominal :


discharge current (kVpeak)

12. Steep fronted wave residual voltage :


at 1 KA (kVpeak)

13. Maximum switching surge impulse residual :


voltage at 1 KA (kVpeak)

14. Long duration discharge class :

15. Impulse current withstand

a) High current short duration (4/10

Sign & Seal of Bidder Page 58 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

micro-sec wave) in kVpeak

b) Low current long duration :


(2000 microsec.)

16. Current for pressure relief test (kA) :

17. Pressure relief class ( as per IEC 99) :

18. One minute power frequency (dry) withstand :


voltage of arrester housing (kVrms)

19. Lightning Impulse withstand test voltage of :


arrester housing with 1.2/50 microsec wave (kVp)

20. Switching Surge Impulse withstand test voltage :


of arrester housing with 250/2500 microsec wave (kVp)

21. Total creepage distance of whole arrester Housing ( mm):

22. Cantilever strength of complete arrester (N) :

23. Total height of the arrestor (mm) :

24. Total weight of the arrestor (Kg) :

25. Maximum radio interference voltage at 1.1 Ur/ :


root 3 voltage at 1 MHz ( microvolts)

26. Partial discharge at 1.05 continuous operating :


voltage (pC)

27. Minimum prospective symmetrical fault current :


(kArms)

28. Compliance to technical specification w.r.t :


i) Surge monitor i) YES / NO
ii) Support Insulator ii) YES / NO
iii) Terminal connectors iii) YES / NO

29. ZnO block details :


a) Make and size of ZnO block :
b) Whether equipment type tested : YES / NO
with offered type of ZnO block

30. Whether similar equipment are type tested : YES / NO

Sign & Seal of Bidder Page 59 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

as per IEC/IS or equivalent standard and are


in successful operation for at least two years.

31. Overall General Arrangement drawing of :


Surge arrester is to enclosed.

Sign & Seal of Bidder Page 60 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

ANNEXURE C

List of documents attached with technical bid:

Bidder shall invariably attach the following documents and clearly marked and duly
flagged in technical bid. In absence of these documents offer will be evaluated as a
non-submission.
Sr. No. Particulars of document Whether attached
with tech bid
1 Drawings in AutoCAD format
2 Drawings hard copies as indicated in specification
3 Manual in PDF format
4 QAP for manufacturing process in SOFT format
5 QAP for manufacturing process in Hard format
6 FQP in SOFT format
7 FQP in Hard copy
8 Type test Reports in hard copies
a for reactor
b for NGR
c for clamps & connectors
9 Confirmation regarding type tests as per clause no.
Cl. 1.30.3.1(b) page no. 32 – “IMPORTANT NOTE”
10 Cooling calculation
11 Guaranteed Technical Particulars, completely filled in
a for reactor
b for NGR
c for SA
14 Any other essential documents

Sign & Seal of Bidder Page 61 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

ANNEXURE - II

TECHNICAL SPECIFICATION
FOR

THE WORK OF DESIGN, SUPPLY, ERECTION AND COMMISSIONING


INCLUDING CIVIL WORK OF NITROGEN INJECTION SYSTEM FOR
PROTECTION AGAINST THE FIRE & EXPLOSION FOR TRANSFORMER.

TECHNICAL SPECIFICATION NO.


GETCO/E/TS-FF/2903/R3 June’2020

Sign & Seal of Bidder Page 62 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

SPECIAL INSTRUCTIONS TO BIDDER

Please read following instructions carefully before submitting your bid.

1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc.,
in AutoCAD format and manuals in PDF format, for offered item shall be
submitted. Also the hard copies as per specification shall be submitted.

2. The bidder shall submit Quality Assurance Plan for manufacturing


process and Field Quality Plan with the technical bid.

3. The bidder shall have to submit all the required type test reports for the
offered item. However, in the event of partial submission or reports older
than specified limit, bidder must submit his confirmation for those type
test report/s to be submitted in the event of an order, without affecting
delivery schedule, before commencement of supply, free of cost. In
absence of this confirmation, the evaluation shall be carried out
accordingly as non-submission of type test reports.

4. The bidder must fill up all the point of GTP for offered item/s. Instead of
indicating “refer drawing, or as per IS/IEC”, the exact value/s must be
filled in.

5. All the points other than GTP, which are asked to confirm in technical
specifications must be submitted separately with the bid.

6. The bidder is required to impart training in view of manufacture,


assembly, erection, operation and maintenance for offered item, at his
works, to the person/s identified by GETCO, in the event of an order, free
of cost. The cost of logistics will be bear by GETCO.

7. Please note that the evaluation will be carried out on the strength of
content of bid only. No further correspondence will be made.

8. The bidder shall bring out all the technical deviation/s only at the specified
annexure.
9. The bidder should indicate manufacturing capacity by submitting latest updated
certificate of a Chartered Engineer (CE).

Sign & Seal of Bidder Page 63 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

TECHNICAL SPECIFICATIONS

1) Scope of work:
I) Turnkey contract for the work of design, supply, erection and
commissioning of Nitrogen Injection system for protection against the
transformer explosion up to 400 KV Transformers and Shunt Reactors as
indicated in Schedule – A including all required civil works of oil
sump, foundations, any other required for satisfactory working of
system.
II) NIFPS supplier shall be Original Manufacturer (OEM) of system. The
offered system has to be designed, manufactured and tested as per
relevant IS/IEC/ANSI standard with latest amendments.
III) Each oil filled transformer / reactor shall be provided with a dedicated
Nitrogen Injection system for prevention against the transformer
explosion, which shall use nitrogen as quenching medium. The system
shall prevent transformer / Reactor oil tank explosion and possible fire in
case of internal / external cause. In the event of fire by external causes
such as bushing fire. OLTC fires, fire from surrounding equipment etc., it
shall act as a fast and effective fire fighter. It shall accomplish its role as
fire preventer and extinguisher without employing water or carbon
dioxide. Fire shall be extinguished within reasonable with time (not more
than 3 minutes so as not to harm the transformer) of system activation
and within 30 seconds (maximum) of commencement of nitrogen
injection.
IV) The system shall have been in successful operation / commissioned in
Indian / Abroad installations for at least last five years for protection of
transformers of 220 KV and higher voltage class. The list of past
supplies in India / Abroad along with performance certificate from users
of the system shall be submitted for approval of purchaser.
2) Activation of the system
I) Mal-functioning of the Nitrogen injection system could lead to interruption
in power supply. The supplier shall ensure that the probabilities of
chances of malfunctioning of the Nitrogen injection system are practically
zero. To achieve this objective, the supplier shall plan out scheme of
activating signals which should not be too complicated to make the
system inoperative in case of actual need.

Sign & Seal of Bidder Page 64 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

II) The system shall be provided with automatic controls to prevent the
explosion of transformers. Besides automatic control, remote electrical
push button control at Control box and local manual control in the cubicle
shall also be provided. The following electrical-signals shall be used for
activating the system under prevention mode/fire extinguishing mode.
a) Auto Mode
 For prevention:
 Arc sensor input (if any)
 Differential relay operation.
 Buchholz relay paralleled with pressure relief valve or RPRR
(Rapid Pressure Rise Relay)
 Tripping of all circuit breakers (on HV & LV/IV side) associated
transformer / reactor is the pre-requisite for activation of system.
 For extinguishing
 Fire Detector (quartz bulb / Linear Heat Detector)
 Buchholz relay paralleled with pressure relief valve or RPRR
(Rapid Pressure Rise Relay).
 Tripping of all circuit breakers (on HV & LV/IV side) associated with
transformer / reactor is the pre-requisite for activation of system.
b) Manual Mode (Local / Remote)
 Tripping of all circuit breakers (on HV & LV / IV side) associated
with transformer / reactor is the pre-requisite for activation of
system.
c) Manual Mode (Mechanical)
 Tripping of all circuit breakers (on HV & LV / IV side) associated
with transformer / reactor is the pre-requisite for activation of
system.
 The system shall be designed to be operated manually in case of
failure of power supply to the system.
3) General description
I) Nitrogen Injection system should be a dedicated system for each oil filled
transformer / reactor.

Sign & Seal of Bidder Page 65 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

II) It should have a Fire Extinguishing Cubicle (FEC) placed on a plinth at a


distance of 5-10 m away from transformer / reactor or placed next to the
firewall (if fire fighting wall exists).
III) The FEC shall be connected to the top of transformer / reactor oil tank for
depressurization of tank and to the oil pit (Steel Tank) (capacity is
approximately equal to 10% of total volume of oil in transformer / reactor
tank / oil to be drained or existing oil pit) from its bottom through oil pipes.
IV) The FEC should house a pressurized nitrogen cylinder (s) which is
connected to the oil tank of transformer /reactor oil tank at bottom. The
Transformer Conservator Isolation Valve (TCIV) is fitted between the
conservator tank and Buchholz relay.
V) Cable connections are to be provided from signal box to the control box
in the control room, from control box to FEC and from TCIV to signal box.
Detectors placed on the top of transformer / reactor tank are to be
connected in parallel to the signal box by Fire survival cables.
VI) Control box is also to be connected to relay panel in control room for
receiving system activation signals.
VII) System shall have facility for inspection of oil leakages from oil drain
valves when system is in service.
VIII) It shall be ensured that Nitrogen gas shall not enter the energized
transformer/ reactor tank through valve even in case of leakage.
IX) Steel Tank shall be grouted & to be earthed with existing substation earth
pit.
4) Operation
I) On receipt of all activating signals, the system shall drain - pre-
determined volume of hot oil from the top of tank (i.e. top oil layer),
through outlet valve, to reduce tank pressure by removing top oil and
simultaneously injecting nitrogen gas at high pressure for stirring the oil
at pre-fixed rate and thus bringing the temperature of top oil layer down.
II) Transformer conservator isolation valve blocks the flow of oil from
conservator tank in case of tank rupture / explosion or bushing bursting.
III) Nitrogen occupies the space created by oil drained out and acts as an
insulating layer over oil in the tank and thus preventing aggravation of
fire.

Sign & Seal of Bidder Page 66 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

5) System components
I) Nitrogen Injection system shall broadly consist of the following
components. However, all other components which are necessary for
fast reliable and effective working of the system shall deemed to be
included in the scope of supply.
a) CUBICLE (FEC)
 The Cubicle Frame shall be made of CRCA sheet of 3 mm
(minimum) thick complete with the base frame, painted inside and
outside with post office red colour (shade 538 of IS -5).
 It shall have hugged / hinged split doors fitted with high quality
tamper proof lock. The doors, removable covers and panels shall
be gasketted all round with neoprene gaskets.
 The degree of protection shall be IP55. The following items shall
be provided in the Cubicle.
 Nitrogen gas cylinder with regulator and falling pressure electrical
contact manometer.
 Oil drain pipe with mechanical quick drain valve.
 Electro mechanical control equipment for draining of oil of pre-
determined volume and injecting regulated volume of nitrogen gas.
 Pressure monitoring switch for back-up protection for nitrogen
release.
 Limit switches for monitoring of the system.
 Solenoid / Butterfly valve with flanges on the top of panel for
connecting oil drain pipe and nitrogen injection pipes for
transformer / reactors.
 Panel lighting (CFL Type)
 Oil drain pipe extension of suitable sizes for connecting pipes to oil
pit.
 Space heater.
b) Control box
 Control box is to be placed in the control room for monitoring
system operation, automatic control and remote operation. The

Sign & Seal of Bidder Page 67 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

following alarms, indications, switches, push buttons, audio signal


etc. shall be provided.
 System ON.
 TCIV open.
 Oil drain valve closed.
 Gas inlet valve closed
 TCIV closed
 Detector trip
 Buchholz relay trip
 Oil drain valve open
 Extinction in progress
 Cylinder pressure low
 Differential relay trip
 PRV / RPRR trip
 Transformer / reactor trip
 System out of service
 Fault in cable connecting fault detector
 Fault in cable connecting differential relay
 Fault in cable connecting Buchholz relay
 Fault in cable connecting PRV / RPRR
 Fault in cable connecting transformer reactor trip
 Fault in cable connecting TCIV
 Auto / Manual / Off
 Extinction release on / off
 Lamp test
 Visual / Audio alarm for AC supply fail
 Visual / Audio alarm for DC supply fail

Sign & Seal of Bidder Page 68 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

 As far as possible the control box should be such devised that all
the transformers and reactors or group thereof should be controlled
from single spot.
 Potential free contacts shall be available for alarm troubles for
input to SCADA system.
 Also, separate hooter & emergency trip provision shall be provided
in control room over & above provided in control box (as control
box is to be provided in respective yard kiosk).
 Control Box shall have DC Source-1 & DC Source-2 auto
changeover facility. Potential free contact shall be provided to
monitor DC Source healthiness in SCADA.
c) Transformer Conservator Isolation Valve.
 Transformer conservator isolation valve (TCIV) to be fitted in the
conservator pipe line, between conservator and buchholz relay
which shall operate for isolating the conservator during abnormal
flow of oil due to rupture / explosion of tank or bursting of bushing.
 The valve shall not isolate conservator during normal flow of oil
during filtration or filling or refilling, locking plates to be provided
with handle for pad locking. It shall have proximity switch for
remote alarm, indication with visual position indicator.
 The TCIV should be of the best quality as malfunctioning of TCIV
could lead to serious consequence. The closing of TCIV means
stoppage of breathing of transformer / reactor.
 Locking plates shall be provided for pad locking.
d) Detectors
 The system shall be complete with adequate number of detectors
(quartz bulb) OR Linear Heat Detector cables with Arc sensors
fitted on the top cover of the transformer / reactor oil tank.
e) Signal box
 It shall be mounted away from transformer / reactor main tank,
preferably near the transformer marshalling box, for terminating
cable connections from TCIV & detectors and for further
connection to be control box.
 The degree of protection shall be IP55.

Sign & Seal of Bidder Page 69 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

f) Cables
 Fire survival cables (capable to withstand 750º C.) of 4 core x 1.5
sq. mm size for connection of detectors in parallel shall be used.
The fire survival cable shall conform to BS 7629-1, BS 8434-1, BS
7629-1 and BS 5839-1, BS EN 50267-2-1 or relevant Indian
standards.
 Fire Retardant Low Smoke (FRLS) armoured cable of adequate
size shall be used for connection of signal box / marshalling box
near transformer / reactor and FEC mounted near transformer/
reactor with control box mounted in control room.
 Fire Retardant Low Smoke (FRLS) armoured cable of 4 core x 2.5
sq. mm size shall be used for connection between control box to
DC & AC supply source, FEC to AC supply source, signal box /
marshalling box to transformer conservator isolation valve
connection on transformer / reactor. Separate cables for AC
supply & DC supply shall be used.
g) Pipes
 Pipes complete with connections, flanges, bends and tees etc.
shall be supplied along with the system.
h) Other items to be supplied.
 Oil drain and nitrogen injection openings with gate valves on
transformer / reactor tank at suitable locations.
 Flanges between Buchholz relay and conservator tank for fixing
TCIV.
 Detector brackets or Linear Heat Detector cable with Arc
sensors mounting arrangement on transformer / reactor tank top
cover.
 Spare potential free contacts activating the system i.e. in
differential relay, Buchholz relay. Pressure Relief Device / RPRR,
Circuit breaker of transformer / reactor.
 Pipe connections between transformer / reactor and FEC and
between FEC and oil pit required for collecting top oil.
 Cabling for detectors mounted on transformer / reactor top cover.
 Inter cabling between signal box, control box and FEC.

Sign & Seal of Bidder Page 70 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

 Solenoid / Butterfly valves / Gate valves on oil drain pipe and


nitrogen injection pipe which should be able to withstand full
vacuum.
 Supports, signal box etc. which are to be painted with enameled
paint.
 Any other item required for satisfactory operation of system.
II) Power supply
a) For Control Box 220 V / 110 V DC
b) For FEC Auxiliary 230 V AC
6) Spares for three (3) years Operation & Maintenance
I) The bidder apart from the below mentioned spares shall submit a list of
recommendation spares for three years trouble free operation of the
equipments and also furnish unit rates. The owners will scrutinize the
said list and decide on the items on spares to be ordered and the
quantities. These spares shall be supplied by the contractor before end
of guarantee period. The owner reserves right to order the spares with
twelve (12) months from the date of order for main equipments and the
rate shall be kept valid till this date. The prices of these spares shall not
be considered for evaluation of the bid.
II) Mandatory Spares
a) Cylinder filled with Nitrogen of required capacity per system : 1 No.
b) Detectors / Arc sensors per transformer : 3 No.
c) Regulator assembly per sub-station : 1 No.
d) Linear Heat Sensing cable of required length (if any)
7) Modification on the transformer
I) No modification on the transformer shall be allowed which affects its
performance (i.e. efficiency, losses, heat dissipation ability etc.) Safety,
life etc. or it’s any other useful parameter. This requirement shall be
paramount importance and shall form the essence of the contract.
II) However, in any case, performance of transformer should not be affected
in any manner by having Nitrogen Injection Fire Prevention Cum
Extinguishing System (NIFPES) and the Contractor / Sub-Contractor
shall give an undertaking to this effect.

Sign & Seal of Bidder Page 71 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

III) All pipes should be washed / rinsed with transformer oil. If any damage
is done to the transformer and / or any connected equipment during
installation & commissioning full recovery therefore shall be effected from
the Contractor / Sub-Contractor, of NIFPES system.
IV) It shall be solely the responsibility of Contractor / Sub-Contractor to
install, carry out pre-commissioning tests & commission NIFPES at the
mentioned Sub-Station in this specification, to the entire satisfaction of
the GETCO.
8) Interlocks: It shall be ensured that once the NIFPES gets activated=
manually or in auto mode, all the connected breakers shall not close until=
the system is actually put in OFF mode. Also PRV shall get closed only if all=
the connected breakers are open.
9) Tests
I) Contractor has to submit valid type test reports as per relevant IS/IEC,=
including IP 55 on FEC, Control box, Signal Box i.e. all enclosure=
utilized in system., from NABL approved Laboratory or any other
reputed authority nationally or internationally not older than 5 years
& must be valid as on the last date of submission of bid.
II) Acceptance Test
a) The Supplier Shall demonstrate the entire functional tests as=
mentioned in specification associated with:
 FEC
 Control Box
 Fire Detector
 Transformer Conservator Isolation Valve
b) The Auxiliary wiring including terminal block excluding electronic=
circuit if any shall be tested for High Voltage Test i.e. 2 KV (RMS) at=
50 Hz for One Minute between all live parts connected together and=
the body.
c) The steel tank shall be tested for leak test at pressure of 35 KN/M2 for=
12 Hrs with transformer oil.
III) The performance test of the complete system shall be carried out after=
erection of the system with transformer at site.

Sign & Seal of Bidder Page 72 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

10) Detailed layout drawings, equipment drawing along with 4 sets of Operation
and Maintenance manual along with soft copies (In pen drives) shall be
submitted by the supplier along with the consignment.
11) The guaranteed and other technical particulars for the offered system are
indicated in Section - "Guaranteed and Other Technical Particulars".
Any other particulars considered necessary in addition to those listed in that
Section may be furnished by the Bidder.

Sign & Seal of Bidder Page 73 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

GUARANTEED TECHNICAL PARTICULARS


NITROGEN INJECSTION SYSTEM FOR PREVENTION OF FIRE/
EXPLOSION FOR TRANSFORMERS/REACTORS.
Sr. Description Guaranteed
No. Particulars
1 Name of Manufacture and country of origin
2 Reference standards
3 Details of system equipments
4 FEC (Fire Extinguishing Cubicle)
4.1 Dimensions (LXBXH) mm
4.2 Weight
4.3 Capacity of Nitrogen cylinder
4.4 Number of cylinders
4.5 Pressure of Nitrogen filing
4.6 Minimum distance of FE cubicle from the
transformer
4.7 Method of mounting
4.8 Whether the following items are provided in FE
cubicle. If so furnish make, type & other details
4.9 Contact Manometer
4.10 Pressure Regulator
4.11 Oil Release Unit
4.12 Gas release unit
4.13 Oil drain assembly
4.14 Pressure / limit switches
4.15 No. of contacts & spare contacts (NO & NC)
4.16 Oil drain Valve (ABOVE FEC)
4.17 Make
4.18 Type
4.19 Size
4.20 Type of metal
4.21 Nitrogen Injection Valve (Above FEC)
4.22 Make
4.23 Type
4.24 Size
4.25 Oil drain pipe
4.26 Size

Sign & Seal of Bidder Page 74 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

4.27 Length
4.28 Number of openings in the transformer tank
4.29 Material
5 Control Box
5.1 Dimensions (LXBXH) mm
5.2 mm
5.3 Type & Thickness of sheet steel
5.4 Details of components provided in the control
box
5.5 Control voltage
5.6 Method of mounting
5.7 Whether audio and visual alarm provided?
6. Transformer Conservator Isolation Valve
6.1 Make
6.2 Type
6.3 Location
6.4 Whether suitable for pipe of size 80 mm dia
6.5 No. of contacts & spare contacts (NO & NC)
6.6 Padlocking provision
7 Detectors
7.1 Make
7.2 Type
7.3 Quantity required
7.4 Method of fixing
7.5 Effective heat sensing area
7.6 Temperature recommended for effective heat
sensing
7.7 Number of contacts NO / NC
7.8 Necessity and condition of Refilling
8 Whether approved by Tariff Advisory Committee
of India
9 TECHNICAL PARTICULARS FOR NITROGEN
INJECTION SYSTEM FOR PREVENTION OF
TRANSFORMER EXPLOSION
10 Power Supply
10.1 Control box
10.2 FEC (lighting)
10.3 Extinction period

Sign & Seal of Bidder Page 75 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

10.4 On system activation


10.5 On commencement of Nitrogen injection
11 FEC Suitable for capacity
11.1 Dimensions (LXBXH) mm
11.2 Weight
11.3 Nitrogen cylinder capacity
12 Control Box
12.1 Dimensions (LXBXH) mm
12.2 Weight
13 Detectors
13.1 Heat sensing temperature
14.0 Time of Operation

Transformer Tank Fire


Explosion Prevention Extinction
a For system
activation
b For reduction of
pressure in tank by
Nitrogen release.
15 Any other technical details not covered above

Sign & Seal of Bidder Page 76 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

ANNEXURE – III

SECTION: I

DETAIL SPECIFICATION OF FLEXIBLE SEPARATOR (AIR CELL)

GENERAL TECHNICAL REQUIREMENTS

1.1 SCOPE:

1.1.1 This section covers the design, manufacture, assembly, testing at


manufacturer’s works, supply and delivery of the Flexible Separator
(Air cell) as detailed in the Schedule – A of the commercial bid,
complete with all accessories required for satisfactory and trouble free
operation of the equipment.

1.1.2 When it is an item purchase, the scope of work shall be design,


manufacture, assembly, testing at manufacturer’s works, supply and
delivery of Flexible Separator (Air cell) & its all required accessories.
OR
when it is job work of providing and fixing, then the scope of work
shall be design, manufacture, assembly, testing at manufacturer’s
works, supply, delivery, including all required fabrication, fittings,
valves, gauges, pipes etc., and complete erection, testing and
successful commissioning for a given transformer/reactor conservator
indicated in Schedule – A of the commercial bid.

1.1.3 GUARANTEE:

The bidder shall among other things guarantee the following:

i) Quality and strength of materials used.

ii) The bidder shall give the guarantee as satisfactory working of the
complete shunt reactor for 36 months from the date of
commissioning of Flexible Separator (Air cell) or 42 months from
the date of receipt of at site, whichever is earlier.

It may be noted that the service guarantee would be applicable


even when the Flexible Separator (Air cell) is erected and operated
through any other agency appointed by the GETCO.

Sign & Seal of Bidder Page 77 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

2.0 CONSTRUCTION:

The construction of Flexible Separator (Air cell) shall be of Polymide /


nylon fabric coated on both side with synthetic rubber and meeting the
complete requirement of this specification.

Adhesives used shall be compatible with air and transformer oil at


100oC. All the joints shall be properly designed & suitably vulcanized.
Further, Flexible Separator (Air cell) shall be reinforced at bottom face
to avoid damage due to contact with magnetic oil gauge float. There
shall not be any patch work in Flexible Separator (Air cell). Adaptor
used shall be made from structural steel confirming to Fe-410-S to
IS:226. Adaptor and bolts shall be cadmium plated and passivated
(CD-8 of IS:1572) or Zinc plated and passivated.(Fe Zn 12.5 of
IS:1573). The width of the overlap at the joints shall be such that there
is no possibility of joint opening and leakage. Minimum width shall be
75 mm.

3.0 FUNCTIONAL REQUIREMENTS:

i) The function of Flexible Separator (Air cell) is to line the inside of


the conservator tank in shunt reactor, allowing for changes in
volume, while protecting the oil from any type of contamination or
external corrosive agents like ozone, nitrogen, humidity etc.
ii) Flexible Separator (Air cell) shall be suitable for continuous use in
transformer oil at -20oC to 100o C.
iii) Inside coating shall be very good enough to resist weather and
ozone. Outside coating shall be transformer oil resistant.
Compounds used for coating shall not deteriorate during service.
iv) Flexible Separator (Air cell) shall be suitable for inflation and
deflation due to change in oil volume in the conservator. Further,
Flexible Separator (Air cell) shall be designed to collapse slowly as
oil level rises in the conservator.
v) Flexible Separator (Air cell) shall not develop cracks even at -20oC.
vi) Fixation lugs and adaptor shall be provided on the Flexible
Separator (Air cell).
vii) Flexible Separator (Air cell) shall have excellent impermeability to
oil, gases and water vapor.
viii) Flexible Separator (Air cell) shall have high mechanical
resistance.
ix) Flanges provided shall meet any of our requirements indicated.

4.0 GENERAL:
The Flexible Separator (Air cell) shall be suitable for conservator of
diameter, length & shape indicated in schedule – B, attached
separately, with the tender. The suitability & size of Flexible Separator

Sign & Seal of Bidder Page 78 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

(Air cell) to be provided shall be supported by necessary calculation


for given size and shape of conservator.

The Flexible Separator (Air cell) conform to relevant IS or international


standards shall be indicated in the bid. The type tests and
routine/acceptance tests shall be carried out accordingly and report
shall be submitted with the bid.

The work of providing and fixing shall be carried out as per availability
of shut down of particular shunt reactor at site. Necessary tools tackles,
accessories, manpower, etc required shall be managed by contractor.

The guaranteed technical particulars as listed in Section II, but not


limited to shall be invariably submitted with the technical bid.

Sign & Seal of Bidder Page 79 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

ANNEXURE – III

SECTION: II

GUARANTEED TECHNICAL PERTICULARS


Flexible Separator (Air cell)

Sr. No. Particulars

1 Item description :
2 Name of manufacturer :
3 Type & designation :
4 Shape :
5 Size of conservator Diameter :
Length :
6 Size of Flexible Separator (Air cell) :
a. Length (mm) Fully inflated :
b. Length (mm) Fully deflated :
c. Width (mm) Fully inflated :
d. Width (mm) Fully deflated :
e. Distance between axes :
i.e. pitch distance of lugs (mm)
f. Volume (litre) Fully inflated :
g. Volume (litre) Fully deflated :
h. Occupation rate (%) :
7 Material of Flexible Separator (Air cell) :
a. Basic fabric :
b. Coating compound :
c. Oil side coating :
8 Inside coating Material :
9 Outside coating Material :
10 Thickness :
11 Resistance to perforation :
12 Warp breaking strength :
13 Weft breaking strength :

Sign & Seal of Bidder Page 80 of 81


GETCO/E/4TS – SHR02/R7 Jun’22

14 Warp elongation breaking :


15 Weft elongation breaking :
16 Seam resistance :
17 Perforation :
18 Permeability to Oxygen :
19 Permeability to water vapour :
20 Resistance to Ozone gas for 96 hrs at 40oC :
21 Attachment details :
22 Flange details :
23 Lugs :
24 vulcanizing process :
25 Reinforcement at bottom :
26 Suitable for maximum temperature :
27 Minimum width of over lap (mm) :
28 Material of adaptor and bolts :
29 Guarantee period :
30 Accessories and fittings
(Give list with details) :
31 Any other information :

SIGNATURE OF BIDDER COMPANY’S ROUND


SEAL

DATE:
PLACE:

Sign & Seal of Bidder Page 81 of 81