Subject: Actual Operation Findings
Audit Date: 2021 AND JANUARY-MARCH 2022
LINE 1- Packaging
02/25/21 area conveyor near No cover or guarding
palletizer
LINE 1- Packaging Flooring with Crack /
02/25/21 Pending
area Pot holes
LINE 1- Packaging
04/21/21 Poor wiring condition Pending
area- outside
Damaged wiremesh
screen near members
station area might cause
LINE 2- Packaging accident (scratch or
04/01/22 Reported to Supervisors
area, Packer area stitch). Also passage
way of members from
line 1 going in and out
the production.
screen near members
station area might cause
LINE 2- Packaging accident (scratch or
04/01/22 Reported to Supervisors
area, Packer area stitch). Also passage
way of members from
line 1 going in and out
the production.
Lacking of Florescent
LINE 2- Blending Reported to Supervisor S'
04/01/22 lamp, One of QA findings
Siever area. Dave
during sugar sorting.
Rack has no shelves,
LINE 2- Blending Staging of weighed raw Reported to Supervisor M'
04/01/22
Weighing area mats can cause powder Zhanna
to spill
Capsule machine 6,
Unstable position as
LINE 2- Blending observed during Reported to Supervisor M'
02/13/22
dumper area, dumping of raw mats, Zhanna
Capsule is moving down
slowly.
Capsule machine 6,
Unstable position as
LINE 2- Blending observed during Reported to Supervisor M'
02/13/22
dumper area, dumping of raw mats, Zhanna
Capsule is moving down
slowly.
replacement of broken
switch/buttons/
02/17/22 LINE 2-Blending Hoist pending
REPORTED ALSO TO
SUPERVISORS
LINE 2- Blending
02/17/22 Detached light switch
dumper area,
NO SECOND OPTION OF
EVACUATION PLAN
05/16/21 URC-SP1 PREMISES BECAUSE THE
ASSEMBLY AREA IS
OCCUPIED
REPLACEMENT OF NEW
FIRE HOSE CABINET
HALLWAY GOING TO
AND ENSURE THAT AXE
02/13/22 PALLETIZER AREA OF
IS PROPERLY PLACED/
PL2
REPORTED ALSO TO
SUPERVISORS
Form Title:
Form No. Revision No. 0
Effectively Page
Target
Responsibility Completion Status Next Action
Date
OPEN
CREATION OF EVACUATION
MAP INSIDE PRODUCTION
NO VISIBLE /POSTED
AREA/PUTTING OF
05/16/21 URC-SP1 PREMISES EVACUATION MAP INSIDE
ADDITIONAL EVACUATION
PRODUCTION AREA
SIGNAGES INSIDE
PRODUCTION AREA
PREVENTIVE ACTION