Professional Documents
Culture Documents
Unitizing in The Field
Unitizing in The Field
Unitizing in The Field
TRAINOR GLASS INSTALLERS CLOSE-IN EFFICIENTLY AND SAFELY WITH UNITIZED SYSTEMS
1. Preglazed curtain wall panels are shipped to the 2. A glazier, properly tied off to the structure,
jobsite in crates and hoisted to the floors using carefully handles the panel to guide it into place.
the tower crane. The panels are removed from the
crates and hoisted outside of the building using
our monorail system and remote controlled hoist.
Finished Project
Hunt Corporate Headquarters
Dallas, TX