Pressure drops:
Due to Pig train: 0.61 BarG
Summary:
Reqd pig speed: 0.30 m/sec
Chemical Calculations
Volume/BarG: 1278.6350 l
Volume: 114.2400 m3
69487.78
Air Content: 0.3750 %
Temperature effect
Start Temp: 15 oC
No of compressors: 1
Air Drying
Drawdown time
SV pressure: mBarA
Leak Check
199536
Duration: 24.00 hrs 537371.156513
2.69310378334
Start Pres: 130.00 mBarA 42.071197411
-3.8834951456
End Pres: 118.00 mBarA 38.1877022654
Vaporisation time
Soak test
49884
Duration: 6.00 hrs 537371.156513
10.7724151334
Start Pres: 15.24 mBarA 5.34361851332
0.02103786816
End Pres: 15.30 mBarA 5.36465638149
Final Drawdown
From: 9.00 mBarA
m3 to CFM
CFM > M3/hr: 600 1014.08
m3/hr > CFM: 1014 599.95