Bqs568 Group 5 Green Building
Bqs568 Group 5 Green Building
PROPOSED
SUSTAINABLE,
GREEN BUILDING
BY GROUP 5 :
1. AMIRAH NAJWA BINTI MOHAMAD ROZELI (2020859176)
2. NUR ALYA IRDINA BT ASMI (2020452954)
3. FATANIAH BINTI MOHD SALLEH (2020847188)
4. AQILAH BINTI MOHD ASKOLLANI ( 2020845194 )
5. NURUL HASIFA BINTI ALIAS (2020462272)
GREEN RATING
OUTLINE- GREEN
BUILDING INDEX
A. PROJECT
CONCEPT
PROJEK TAMBAHAN BANGUNAN & AKSESORI PEJABAT
BARU MAJLIS DAERAH PENGKALAN HULU, PERAK
DARUL RIDZUAN.
LOCATION
PENGKALAN HULU
POSKOD 33100
DAERAH HULU PERAK,
PERAK DARUL RIDZUAN
PARTIES INVOLVED
PROJECT MANAGER:
DZULFIDA BIN A RAZAK
Location of greenspace
around the building
ENERGY EFFICIENCY
1.0 USED RENEWABLE ENERGY 3.0 PHOTO AND MOTION SENSOR
SYSTEM ● Used PIR motion sensor which is
● Used of photovoltaic system passive infrared sensor in each room.
which is an active solar power ● It will automatically turning off lights
system or fan when no people are detected in
● It can absorb radiation of sun for
the target space.
heating and electricity provision.
● In this construction, PV panels ● This will help in decrease of electricity.
are mounted on roofs of the ● Occupancy sensor is installed in area
2.0 UTILIZATION OF LED LIGHTING that are rarely used for long time like
building. It can absorb radiation
of sun for heating and electricity ● Used of LED lighting in each room toilet, corridor meeting room and etc.
provision. in the office.
● Compared to incandescent light
bulbs, LED lighting products are up
to 90% more efficient at producing
light.
● LED light uses far less energy to
produce the same light output.
● To prevent performance issues, the
heat LEDs produce is absorbed into
a heat sink.
ENERGY EFFICIENCY (CONT’D)
4.0 GREEN TECHNOLOGY APPLIANCES
● Used of sustainable technology product like HVAC
(Heating, Ventilation And Air Conditioning).
● HVAC refers to all the different systems, machines, and
technologies used to regulate indoor temperature and
air quality. It has filter and recirculate air to eliminate
odours, dust, and other pollutants to improve air
quality. 5.0 HARVEST NATURAL LIGHT
● Efficient HVAC systems can provide comfort, lower ● When accessible, daylight harvesting is a method of
collecting and utilising natural sunshine in the interior
operating costs, enhance workplace safety and
of buildings to decrease the need for energy-intensive
productivity, and reduce greenhouse gas emissions. artificial lighting.
● HVAC system can help in cutting energy consumption, ● Used glass wall for separate the office room and used
generate financial savings, and lower organisation's curtain wall for external wall to allow the natural light
environmental footprint. penetrate even into the interior room area.
● However, this method may cause increase in sun’s
heat energy that warm the building. This can be avoid
by using operable window/walls shade or panel blind.
Other alternative is by installing black UV block heat
insulation directly at wall/ window glasses.
MATERIAL & RESOURCES
1.0 Structural Insulation panel 2.0 Natural Fiber 3.0 Cork
Structural insulated Natural fibers like Cork is also a good
panels (SIPs) consist of cotton, wool can also insulator. A great
two sheets of oriented be used as insulation amount of electrical
strand boards or flake materials. energy can be saved by
board with a foam layer Recycled cotton fibers corkboard insulation in
between them. or wool fibers are winter.
They are generally converted into a batt These cork boards are
available in larger sizes and installed in also good for sound
and are used as walls for preformed wooden insulation.
the structure plus they frame sections.
also provide good
insulation.
MATERIAL & RESOURCES
4.0 Glass 5.0 Rammed Earth
Waste glass can be used
instead of sand when It is a solution to
making polymer concrete, creating steadfast
resulting in a stronger, foundations, floors and
cheaper product. The walls, through natural
type of glass used is materials such as chalk,
unsuitable to be recycled earth, gravel or lime,
back into glass. This also and then compacting
can overcome the them. Buildings made
shortages in natural from rammed earth
sands. are made safer or
fortified by the use of
rebar or bamboo.
WATER EFFICIENCY
The most suitable IBS element that can be used for this building is precast concrete. Precast
concrete are the element that construct off site manufactures. Thus, the cost may be highest
during the transportation of the precast element to the site. But truly, precast concrete is very
saving the cost after the construction due to requirements of lower maintenance, durability and
etc. Example of precast element can be used for this building is precast block, precast staircases
and precast column.
PRECAST CONCRETE STAIRCASES PRECAST CONCRETE COLUMN
Precast concrete staircases is more durable Precast concrete column are produced after
and consistent in their appearance due to the installation of reinforcement where the
concrete to produce precast staircases concrete are cast and cured off site and
already cast and cured under controlled indoor transported to the site to being erected.
conditions. Hence, this element use less Precast concrete column should be
material overall and combine the recycle installed and used for the whole
material such slag, cement and fly ash. construction of tambahan bangunan &
Precast concrete staircase should be installed aksesori pejabat baru majlis daerah
from level 1 to level 2 of this building pengkalan hulu in perak
PRECAST CONCRETE BLOCK
Precast concrete block are produced off site in factory where the cement of concrete
blocks are formed under and hardened under controlled condition to produce high-quality
of concrete block before transported to the site to being used. Precast concrete block are
durable and high resistance to the fire, rain and any climate changes of environment.
During the construction of tambahan bangunan & aksesori pejabat baru majlis daerah
pengkalan hulu in perak, the precast concrete block can be used for the entire
construction of external wall of building. So that, the building become green due to high
protective from the blocks to the risk from environment.
Completion On Time - Selection of contractor
1 2
Plan schedule management Define activities
4 3
Estimate activity resources Sequence activities
5 6
Estimate activity duration Develop Scedule
7
Control Schedule
HEATING, VENTILATION AND
ENVIRONMENTAL CONTROL (NOISE AIR CONDITIONING
● In order to construct green building, we need to includes setting and managing client expectations,
developing detailed project plans, defining project scope and assigning team members to specific
tasks.
GREEN CONSTRUCTION PROJECT MANAGEMENT
Implementation Phase
● Contract management and integrated
development. Closeout Phase
● Building with a focus on sustainable ● The commissioning authority's early involvement
education. and participation.
● Collaborate with governmental inspectors ● The owner's investments and aims being clearly
and regulators. understood.
● Simple route to LEED accreditation.
Important roles of Project Manager
● The success of a project is significantly influenced by the competence of the project manager. When compared to
conventional structures, green buildings have more difficult construction issues, and project managers must
contend with more difficulties.
● Project managers must focus more on their organisational and leadership skills in order to accomplish the goal of
ensuring that all types of personnel can operate effectively together. This can help to achieve the goal that all
kinds of employees can together efficient work.
● All parties who rely on the project manager's leadership and organisation must develop a solid communication
channel with the supplier and supervisor.
● To prevent the emergence of a capital chain fracture, which could result in a project shutdown, the project
manager should develop an ideal plan for Sustainability finances.
● The project manager should create a perfect plan for Sustainability funds in order to avoid the occurrence of
fracture of the capital chain, leading to a project shutdown.
● The project manager should also establish rigid guidelines for the usage and storage of supplies and equipment.
Quality Management System to ensure the green building construction
Project monitoring involves collecting the actual‐progress data, and comparing them against the
relevant planned‐progress data to evaluate the overall project progress at specified cut‐off dates.
> Mobilisation
> Re-Planning
> Progress records
> Progress Reports > Change Orders
> Change Orders
> Progress Meetings > Implications to
> Verification that the
> Operational Audits Payments and
work was performed
> As-built Claims
> Delays
Information > Extension of Time
> Variations
> Lessons Learnt
USE OF ECO LABELLED PRODUCT
CONSTRUCTION SAFETY & HEALTH-DURING CONSTRUCTION
Flammable solids,
liquids or gases should
be stored at sufficient
and suitable secure
storage such liquefied
petroleum gas cylinder,
paints and others as
detecting trespassers.
CONSTRUCTION SAFETY & HEALTH-DURING CONSTRUCTION
Keep the site tidy such
any oil, ice, snow or
other which makes
some area slippery
need to be properly
cleaned up such
remove them or just
strewn with sawdust,
sand or ash.
● Each of these obviously give a lot of impacts in terms of financial but promising a
better impact to the environment if taken into account in terms of life cycle cost
F. CONCLUSION
AND
REFERENCES
CONCLUSION
The project we choose is office building that is located in Pengkalan Hulu, Perak. In order to improve the
construction by converting the building become green building, we have emphasized several aspects :
● Design & Planning
● Green Construction
● Operation & Maintenance
● Technical Implications
We also design and used sustainable material like eco-label materials, used smart appliances
technology,recycle materia, installation of renewable energy and etc to achieve green building index. The
construction, maintenance and operation also based on green building requirement.
By using all these requirement, the objectives to construction a green office building will be achieved. Even
though construction cost to build the building is high, however we all agree that life cycle cost after the
construction finish successfully is cheaper as the office building have lower energy efficiency that reduce the
used of water and electricity.
REFERENCES
Bhatia, A. (n.d.). HVAC Systems Noise Control. CED Engineering.com:
https://www.cedengineering.com/userfiles/HVAC%20Systems%20Noise%20Control.pdf
Mishra, G. (2021, June 2). Site and Landscape Planning for Green Building Construction. The Constructor.
https://theconstructor.org/building/buildings/green-building-site-landscape-planning/7007/?amp=1
Nurzynski, J. (n.d.). SUSTAINABILITY AND PROTECTION AGAINST NOISE IN A BUILDING AND ITS SURROUNDINGS. PhD CEng
Building Research Institute: https://www.irbnet.de/daten/iconda/CIB2837.pdf
Rodriguez, J. (2019). How to Control Dust at a Construction Site. The Balance Small Business:
https://www.thebalancesmb.com/control-dust-at-construction-site-844446
Sang, P., Liu, J., Zhang, L., Zheng, L., Yao, H., & Wang, Y. (2018). Effects of Project Manager Competency on Green
Construction Performance: The Chinese Context. Sustainability, 10(10), 3406.
https://doi.org/10.3390/su10103406