FPAA101H

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

This exemption

applies to the lift


serving class 2 only,
not communicated
with carpark or the
like.
CLA
Dele
T
fo
a
C

CLAU
Add ne

3.3
3.3







3.3.4.2 Sprinkler character
In addition to the req
areas shall also:
• Be of the quick
• Have a minimu
• Have a K m fact
• Have a tempe
are designated

3.3.4.3 Simultaneous desig


The system design on
(a) 
the minimum
specified in Ta
(b) the required n
Specification.

3.3.4.4 Pressure reduction



Pressure reduction s
protecting these non-

CLAUSE 3.4
1. 
Delete clause title and replac
2. At the end of the clause, add
NOTE: This clause clarifies
hydrant part. For the
ns of

stems
gn):
h are

evant

ydrant
.
uld be
taged hydrant. The
The valve shall be
2. Delete Table and replace with new Table as follows:

Duty – Measured at the flow measuring device Flow Pressure


L/s kPa
Hydrant duty
Sprinkler duty
Combined duty for pressure and flow testing
Pump duty
Welded BSP Flow test Installation
socket drain pipe pressure gauge
Feed hydrants Alarm initiating
device test drain

Booster inlet
Flow test
throttle valve Flow test facility
isolation valve

Alarm initiating
device – Flow
switch
Connection in Main stop valve
accordance with
the requirements Water supply backflow
for the building prevention device
drainage system

From water supply To FPAA101H installation

You might also like