PN

TN

REVISION CONTRACTOR COMPANY

DRF LE EM PM ENG EM PM
REV. DATE DESCRIPTIONS
DRAWN REV'D CHK'D APP'D REV'D ENDORS'D APP'D

OWNER

CONTRACTOR

SUB-CONTRACTOR

PROJECT

CONTRACT NO ACAD FILENAME

DRAWING TITLE EQUIPMENT LAYOUT


AUXILIARIES BUILDING / CONTROL ROOM
(204-B-004)
DRAWING NO. SHEET SCALE REV.
SOUTHERN TRANSMISSION IMPROVEMENT & READINESS (STAR) PROJECT
(EXECUTION)
COMMENTS RESPONSE SHEET (CRS)

.
Date: 19-Oct-22
CRS No: STAR-000-EXE-DECSB-KLCS-PIP-LYT-0003_0-CRS
Rev No: 0

Drawing / Document Number, Title and Revision: Transmittal Document Purpose:


Title: EQUIPMENT LAYOUT AUXILIARIES BUILDING / CONTROL
STAR-000-EXE-DECSB-KLCS-PIP-LYT-0003 ROOM (204-B-004) X CODE 2, ACCEPTED WITH COMMENT (MINOR
Doc. No. CONTENT, COSMETIC ERROR I.E. TYPO, ETC)
Rev. No. 0
Transmittal No STAR-EXE-DECSB-PGB-TRM-1425

No. Comments Confirmation / Explanation by Contractor


Updated based on latest 3D model & also update for
1 to be updated as per latest comment in 90% 3D model review
note and cooridinate

Prepared by: Approved by:

Name: JAAFAR B HAMDAN Name: A MUHAIMIN B A RAHIM


Position: PIPING Position: PROJECT

Internal