Professional Documents
Culture Documents
Tender Clarification No. 1 (C&S Services)
Tender Clarification No. 1 (C&S Services)
ITEM CLARIFICATION
RESPONSE
1 To clarified the Design Code Preference as British Code (BS) or Eurocode (EC) Whichever accepted by local authority and cost
efficient
2 To clarified the ASRS system is on Ground Floor only or on L1 & L2 also ASRS racking is seated on the ground floor
4 Request for Master Sewerage Layout Plan and Calculation Report Layout plan attached.
5 Request for Master Water Recticulation Report to determine water pressure at tapping point Any further required documents to deal with master
developer consultant on behalf of ALP
6 To get rough estimation on water usage of cooling system to factor in the daily water demand Consultant to advice in the absence of cold room
specialist
7 Request for Master Stormwater and Drainage Report (MSMA report) to determine the capacity of As attached
existing retention pond.
Tenderer are requested to acknowledge the receipt of Tender Clarification No.1 by signing below.
We confirm that we have received and will incorporate Tender Clarification No.1 in our Tender.
Signature:
Name:
Designation:
Company stamp:
Date:
Page 1