Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

GRANITE INDUSTRIAL CORPORATION

FG INSPECTION CHECKLIST (FIBER)

IC No.: Item Code Quantity


Date Inspected:
Sales Order No.
Customer:
Type of Product:

ACCEPTANCE CRITERIA (STAINLESS TANK)


Quality
Quality Issues to Check Method Used Acceptable Comments/Remarks
Yes No

No Presence of Dents, Holes, Visual Inspection

100% correctness of diameter Steel Tape


(top & bottom) Measurement

100% Correctness Steel Tape


of all size of fittings Measurement

Present of Logo Visual Inspection

Check outside shell surface for Visual Inspection


any signs of leak and cracks
Check connections and joints for any Visual Inspection
cracks, deformations
Check bolt and nut are in good and Visual Inspection
tight condition.

ACCEPTANCE CRITERIA (LADDER)

100% correct measurement based on Steel Tape


tank model requirement Measurement

Properly welded joints Hammer Test

No Rust Visual Inspection

Visual Inspection
Zero Flux residue. & Touch Based
Test
Recommendations (with or without attachment)

Inspected by: Acknowledged by:

QA/QC Inspector Production In-charge

You might also like