Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

Project References

ASIA
Kattupalli | India
Port Operator: Adani Group
Automatic electric arm solution for 15 retrofit RTGs
Phase 1 & 2: Electrification of 32 container blocks, 5.000 meter
Special features: Positioning system
Realization: Phase 1: June 2019 / Phase 2: 2020
NEW 2023: Phase 3: 3 new cranes & 5 Blocks with 820 m

Mundra | India
Port Operator: Adani Group
Automatic electric arm solution for 9 RTGs
Electrification of 17 container blocks, 2.263 meter
Special features: - Positioning system + Data communication
Realization: 2020
New 2023 : Container Terminal 3 - 19 blocks and 12 new RTGs
Realization: 2023 / 2024

Seite 1
Project References

ASIA
Gangarvaram | India
Port Operator: Adani Group
Automatic electric arm solution for 9 new ZPMC RTGs
Electrification of 10 container blocks, 1.140 meters
Special features: Positioning system
FAC of Phase 1: Q1/2023
Phase 2 : 2023

Seite 2
Project References

ASIA
Hong Kong | P.R. of China
Port Operator: Modern Terminals Ltd.
Automatic pneumatic arm solution for 81 retrofit RTGs
Automatic electric arm solution for 13 retrofit RTGs + 8 new RTGs
Automatic electric arm solution for Electrification of 66 container blocks, 14.000 meter
Realization: January 2011 – July 2013
NEW 2023/2024: 14 new ZPMC eRTGC in 2 batches

Singapore
Port Operator: PSA | Keppel Terminal
Automatic electric arm solution for 12 retrofit Samsung RTGs
Electrification of 6 container blocks, 1.560 meter
Special features: 2 arms per RTG
Realization: March 2012

Seite 3
Project References

ASIA
Laem Chabang | Thailand
Port Operator: HPH | Hutchison Ports Thailand
Automatic electric arm solution for 20 new ZPMC RTGs (18 single arm, 2 double arm solution)
Electrification of 20 container blocks, 5.040 meter
Special features: Data communication system / Remote RTGCs
Realization: January 2017 – June 2019
New 2023: 8 new ZPMC eRTGCs + 12 Container blocks, 4.044 meter

Tanjung Priok | Indonesia


Port Operator: PSA International
Automatic eletric arm solution for 15 new Mitsui RTGs
Electrification of 26 container blocks, 6.300 meter
Realization: April 2015 – April 2016
4 ZPMC eRTGCs with Batteries
Commissioned Q2/2019

Seite 4
Project References

ASIA
Port of Tanjung Pelepas| Malaysia
Port Operator: APMT
Double automatic electric arm solution for 10 new ZPMC RTGs
Realization: Q3/Q4 2020

Ahlone International Port Terminal (AIPT) | Myanmar


Port Operator: Adani Group
Automatic electric arm solution for 9 ZPMC RTGs
Electrification of 20 container blocks, 2.963 meter
Special features: Positioning system
Realization: 2022

Seite 5
Project References

EUROPE
Istanbul | Turkey
Port Operator: Mardas
Plug-in solution for 9 retrofit RTGs
Electrification of 3 container blocks, 780 meter
Realization: January 2011
New 2023: 4 new RIC (Kalmar) eRTGCs + 2 container blocks, 400 meter

Gemlik / Bursa | Turkey


Port Operator: Gemport
Plug-in solution for 11 retrofit RTGs
Electrification of 9 container blocks, 2.090 meter
Realization: January 2011

Seite 6
Project References

EUROPE
Istanbul | Turkey
Port Operator: Kumport
Plug-in solution for 8 new RTGs
Plug-in solution for 18 retrofit RTGs
Electrification of 18 container blocks, 1.900 meter
Realization: October 2012 – February 2015

Gemlik | Turkey
Port Operator: Borusan Lojistik
Automatic arm solution for 3 new RTGs
Automatic arm solution for 5 retrofit RTGs
Electrification of 8 container blocks, 1.480 meter
Realization: June 2012 – January 2013

Seite 7
Project References

EUROPE
Barbaros / Tekirdag | Turkey
Port Operator: Asyaport
Automatic electric arm solution for 24 new RTGs
Electrification of 17 container blocks, 2.620 meter
Realization: August 2014
Phase2: 6 new Kalmar RTG with SmartPort solutions
Realization: Q4 2020

Tampere | Finland
Test track Kalmar
Automatic pneumatic arm solution for 1 new RTG
Electrification of 1 container block, 70 meter
Special features:
- Positioning system, data communication system, conductor bar heating system
Realization: February 2011

Seite 8
Project References

EUROPE
Oslo | Norway
Port Operator: Yilport
Plug-in solution for 8 new RTGs + 3 RTGs 2021
Electrification of 4 container blocks, 820 meter + 1 block 277 meter 2021
Special features:
- Positioning system, data communication system, conductor bar heating system
Realization: October 2014 – June 2019 Phase 1
Phase 2: 2021 – 1 block – 3 RTGCs

Felixstowe | Great Britain


Port Operator: HPH | Port of Felixstowe
Automatic electric arm solution for 66 retrofit RTGs
Electrification of 59 container blocks, 15.322 meter
Special features:
- Positioning system, data communication system, conductor bar heating system
Realization: April 2014 – December 2019

Seite 9
Project References

EUROPE

Felixstowe | Great Britain


Port Operator: HPH | Port of Felixstowe
Berth 9: 8 Remote ZPMC eRTGCs + 17 new Konecranes Remote eRTGCs (6 in 2022, 5 in 2023 and
6 in 2024)
8 container blocks with total 2.400 m (10 new blocks upcoming 2023 – 2024 Zone 4 & 5)
Realization: 2020 – 2024

PD Ports – Teesport | Great Britain


Port Operator: DP World
4 Konecranes eRTGCs with Motor cable reels
Conversion from Diesel to Electric machines
Realization Q3/2022

Seite 10
Project References

AMERICAS
Balboa | Panama
Port Operator: HPH | Panama Port Company
Automatic arm solution for 13 new RTGs
Automatic arm solution for 29 retrofit RTGs
Electrification of 37 container blocks, 10.650 meter
Realization: March 2012 – March 2016

Cristobal | Panama
Port Operator: HPH | PPC Cristobal
Automatic arm solution for 20 new RTGs
Automatic arm solution for 6 retrofit RTGs
Electrification of 8 container blocks, 2.000 mezer
Realization: February 2013

Seite 11
Project References

AMERICAS
Lazaro Cardenas | Mexico
Port Operator: HPH | LCT Mexico
Automatic arm solution for 16 new RTGs + 3 retrofit RTGs
Automatic arm solution for Electrification of 24 container blocks, 5.088 meter
Intermodal 525 meter
Realization: November 2011, January 2013 and January 2016
New 2023: 4 Container blocks – 1.108 meter

ICAVE | Port of Veracruz, Mexico


Port Operator: HPH | ICAVE
Automatic arm solution for 26 retrofit RTGs
Electrification of 14 container blocks, 4.200 meter
Realization: December 2018 – June 2020
Retrofit of 20 cranes in 2022
3 new ZPMC eRTG cranes in 2023

Seite 12
Project References

AMERICAS
Wilmington - USA
Port Operator: Gulftainer USA Wilmington
Automatic arm solution for 9 new Konecranes RTGs
Electrification of 6 container blocks, 1316 meter
Special features:
- Data communication system, conductor bar heating system
Realization: Phase 1: Q1 2021 / Q2 2021

Baltimore, Chesapeake - USA


Port Operator: Ports America
Automatic arm solution for 15 new Konecranes RTGs
Electrification of 4 container blocks, 1176 meter (Phase 1)
Special features:
- Data communication system, positioning system, conductor bar heating system
Installation Process: Phase 1: Q1/ 2023

Seite 13

You might also like