eRTG Reference List - 2023 1
eRTG Reference List - 2023 1
ASIA
Kattupalli | India
Port Operator: Adani Group
Automatic electric arm solution for 15 retrofit RTGs
Phase 1 & 2: Electrification of 32 container blocks, 5.000 meter
Special features: Positioning system
Realization: Phase 1: June 2019 / Phase 2: 2020
NEW 2023: Phase 3: 3 new cranes & 5 Blocks with 820 m
Mundra | India
Port Operator: Adani Group
Automatic electric arm solution for 9 RTGs
Electrification of 17 container blocks, 2.263 meter
Special features: - Positioning system + Data communication
Realization: 2020
New 2023 : Container Terminal 3 - 19 blocks and 12 new RTGs
Realization: 2023 / 2024
Seite 1
Project References
ASIA
Gangarvaram | India
Port Operator: Adani Group
Automatic electric arm solution for 9 new ZPMC RTGs
Electrification of 10 container blocks, 1.140 meters
Special features: Positioning system
FAC of Phase 1: Q1/2023
Phase 2 : 2023
Seite 2
Project References
ASIA
Hong Kong | P.R. of China
Port Operator: Modern Terminals Ltd.
Automatic pneumatic arm solution for 81 retrofit RTGs
Automatic electric arm solution for 13 retrofit RTGs + 8 new RTGs
Automatic electric arm solution for Electrification of 66 container blocks, 14.000 meter
Realization: January 2011 – July 2013
NEW 2023/2024: 14 new ZPMC eRTGC in 2 batches
Singapore
Port Operator: PSA | Keppel Terminal
Automatic electric arm solution for 12 retrofit Samsung RTGs
Electrification of 6 container blocks, 1.560 meter
Special features: 2 arms per RTG
Realization: March 2012
Seite 3
Project References
ASIA
Laem Chabang | Thailand
Port Operator: HPH | Hutchison Ports Thailand
Automatic electric arm solution for 20 new ZPMC RTGs (18 single arm, 2 double arm solution)
Electrification of 20 container blocks, 5.040 meter
Special features: Data communication system / Remote RTGCs
Realization: January 2017 – June 2019
New 2023: 8 new ZPMC eRTGCs + 12 Container blocks, 4.044 meter
Seite 4
Project References
ASIA
Port of Tanjung Pelepas| Malaysia
Port Operator: APMT
Double automatic electric arm solution for 10 new ZPMC RTGs
Realization: Q3/Q4 2020
Seite 5
Project References
EUROPE
Istanbul | Turkey
Port Operator: Mardas
Plug-in solution for 9 retrofit RTGs
Electrification of 3 container blocks, 780 meter
Realization: January 2011
New 2023: 4 new RIC (Kalmar) eRTGCs + 2 container blocks, 400 meter
Seite 6
Project References
EUROPE
Istanbul | Turkey
Port Operator: Kumport
Plug-in solution for 8 new RTGs
Plug-in solution for 18 retrofit RTGs
Electrification of 18 container blocks, 1.900 meter
Realization: October 2012 – February 2015
Gemlik | Turkey
Port Operator: Borusan Lojistik
Automatic arm solution for 3 new RTGs
Automatic arm solution for 5 retrofit RTGs
Electrification of 8 container blocks, 1.480 meter
Realization: June 2012 – January 2013
Seite 7
Project References
EUROPE
Barbaros / Tekirdag | Turkey
Port Operator: Asyaport
Automatic electric arm solution for 24 new RTGs
Electrification of 17 container blocks, 2.620 meter
Realization: August 2014
Phase2: 6 new Kalmar RTG with SmartPort solutions
Realization: Q4 2020
Tampere | Finland
Test track Kalmar
Automatic pneumatic arm solution for 1 new RTG
Electrification of 1 container block, 70 meter
Special features:
- Positioning system, data communication system, conductor bar heating system
Realization: February 2011
Seite 8
Project References
EUROPE
Oslo | Norway
Port Operator: Yilport
Plug-in solution for 8 new RTGs + 3 RTGs 2021
Electrification of 4 container blocks, 820 meter + 1 block 277 meter 2021
Special features:
- Positioning system, data communication system, conductor bar heating system
Realization: October 2014 – June 2019 Phase 1
Phase 2: 2021 – 1 block – 3 RTGCs
Seite 9
Project References
EUROPE
Seite 10
Project References
AMERICAS
Balboa | Panama
Port Operator: HPH | Panama Port Company
Automatic arm solution for 13 new RTGs
Automatic arm solution for 29 retrofit RTGs
Electrification of 37 container blocks, 10.650 meter
Realization: March 2012 – March 2016
Cristobal | Panama
Port Operator: HPH | PPC Cristobal
Automatic arm solution for 20 new RTGs
Automatic arm solution for 6 retrofit RTGs
Electrification of 8 container blocks, 2.000 mezer
Realization: February 2013
Seite 11
Project References
AMERICAS
Lazaro Cardenas | Mexico
Port Operator: HPH | LCT Mexico
Automatic arm solution for 16 new RTGs + 3 retrofit RTGs
Automatic arm solution for Electrification of 24 container blocks, 5.088 meter
Intermodal 525 meter
Realization: November 2011, January 2013 and January 2016
New 2023: 4 Container blocks – 1.108 meter
Seite 12
Project References
AMERICAS
Wilmington - USA
Port Operator: Gulftainer USA Wilmington
Automatic arm solution for 9 new Konecranes RTGs
Electrification of 6 container blocks, 1316 meter
Special features:
- Data communication system, conductor bar heating system
Realization: Phase 1: Q1 2021 / Q2 2021
Seite 13