TOTAL COST BLOCK 1

Item No Description Unit Quantity Unit Rate (RP) Total Rate (RP)

1.0 PLEMINARY M2 3760 IDR 4.630.768,14 IDR 8.930.455.246,47


2.0 EARTH WORK & SUBSTRUCTURE WORK M3 4399 IDR 516.113,13 IDR 2.117.261.478,53
3.0 STRUCTURE BUILDING Ls IDR 11.380.959.006,23
4,0 ARCHITECTURE IDR 10.784.604.883,09
5,0 LIFT & INSTALLATION Ls 1,0 IDR 699.300.000,00 IDR 2.034.900.000,00

VENTILLATION & AIR CONDITIONING IDR 524.251.501,20


6,0 Ls

7,0 MEP Ls IDR 3.147.709.481,41

GRAND TOTAL IDR 38.920.141.596,93

PLEMINARY +EARTH WORK = IDR 11.047.716.725,00