DWC7894 11 02 - 00

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTES ON SETTING OUT:

1. SETTING OUT BEACONS X, X1, Y & Y1 TO BE PEGGED AND LEVELED BY ESKOM’S LAND
SURVEY DEPARTMENT.
A A
2. SETTING OUT BEACON, BM (BY ESKOM) TO BE USED AS MASTER REFERENCE LEVEL = 100.000

NOTES ON MV CABLES:

1. ALL WORK SHALL BE IN ACCORDANCE TO THE FOLLOWING STANDARDS AND SPECIFICATIONS:


- SANS 10198 CODE OF PRACTICE FOR THE SELECTION, HANDLING AND INSTALLATION OF ELECTRIC
POWER CABLES OF RATING NOT EXCEEDING 33 kV.
- SCSASABK6 LATEST REV. DISTRIBUTION STANDARD PART 22: CABLES SECTION 6:
MEDIUM-VOLTAGE CABLING IN SUBSTATIONS.

B 2. CABLE SHALL BE LAID IN ACCORDANCE WITH D-DT-0854 ( MV CABLE TRENCH DETAILS )


B

FENCE LEGEND

STATION S.O.L.
SYMBOL DESCRIPTION

HIGH SECURITY STEEL MESH FENCE EXTERNAL

GATE POST FENCE EXTERNAL

FENCE POST CORNER EXTERNAL


C C
DIAMOND MESH FENCE INTERNAL

GATE POST FENCE INTERNAL

FENCE POST CORNER INTERNAL

FUTURE ELECTRIC FENCE


Y

STATION S.O.L.
NOTES:

1. ITEMS SHOWN GREYED OUT ARE FUTURE ADDITIONS.


D D
2. 11 kV CABLES ARE ARRANGED IN FOUR TREFOIL GROUPS.

3. THE HIGH SECURITY STEEL MESH FENCE TO BE INSTALLED 1,2 m INSIDE THE BOUNDARY LINE.

E F

COORDINATE LIST

6 000
FUTURE COUNCIL SERVITUDE WG19 DEGREES

18 680 60 800
Y X
E E
A + 43 752.80 + 3 748 165.88

B + 43 744.65 + 3 748 169.13

C + 43 719.55 + 3 748 185.40


D
D + 43 698.12 + 3 748 206.27

FUTURE 11 kV
CAPACITOR BANKS E + 43 682.29 + 3 748 229.27
1754
B W R B W R
F F
36 800

36 800
F + 43 693.50 + 3 748 303.12
5 m MESH GATE
G + 43 760.94 + 3 748 292.71

H + 43 768.26 + 3 748 340.87

J + 43 767.32 + 3 748 346.50

17 000
LOADING BAY

D2

D1
1 m MESH K + 43 754.61 + 3 748 370.92
3624

8 500
GATE

SWITCH RM.
1m
C L + 43 767.83 + 3 748 369.34

l o n g
B MESH

1 2 8 0 0 m m
STATION S.O.L. GATE STATION S.O.L.

r a m p
STATION S.O.L. STATION S.O.L. M + 43 780.12 + 3 748 345.73

220mm wall under


X X W X1 X1
G G

d u c t
RELAY RM.

7 780
R K
13 000

1 m MESH
13 800

D4
GATE
D3

LADIES

BATTERY RM.

23 800
GENTS

D5
D3

12 000

26 800
RE
31 800

31 800
8 000

OIL
OIL SEWAGE
DAM J
H TRAP CONNECTION H
H L
G 5088

B 1 m MESH
GATE
10 000

6 m MESH
GATE

A
34 000 25 200 5 m MOTORISED GATE WITH
M
1 m PEDESTRIAN GATE
34 800 33 700
(HIGH SECURITY)
J 46 000 J
61 200 60 800

SET 12 SHT 2 11 kV STATION ELECTRIC DIAG.


SET 12 SHT 1 11 kV STATION ELECTRIC DIAG.
SET 11 SHT 10 LIGHTNING LAYOUT
SET 11 SHT 9 LIGHTING LAYOUT
STATION S.O.L.

SET 11 SHT 8 SECTIONS & CLAMPS


SET 11 SHT 7 GENERAL ARRANGEMENT

K SET 11 SHT 6 STEELWORK LAYOUT K


SET 11 SHT 5 FOUNDATION & TRENCH LAYOUT
STATION S.O.L.

SET 11 SHT 4 EARTH GRID LAYOUT

Y1 SET 11 SHT 3 LEVEL AND DRAINAGE PLAN


SET 11 SHT 2 SITE PLAN
Y1
SET 11 SHT 1 132 kV STATION ELECTRIC DIAG.
5082 5083 5084 5085 5086 5087 DRG NO. REFERENCE DRAWINGS:

/ /

0 FIRST ISSUE. / / 533-00002

REV REVISION DESCRIPTION BY CHKD AUTH DATE PROJECT NO.


L L

CARBON SUBSTATION
AUTH:
132/11 kV

LINK CLOSE DATE: / /

CHKD:
SITE LAYOUT
M
M
DATE: / / SET SHEET REVISION

SCALE 1 : 400
DRAWN: C. HAGAN
THIS DRAWING IS THE
PROPERTY OF ESKOM DATE: 15/11/2010
D-WC-7894 11 2 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 A1L

You might also like