JOB SCOPE :

1. Check existing network cables for connectivity - identify and mark the cables
2. LAN cables routing to cabins which are without cable connections
3. There are 4 decks. LAN cables routing to deck galley on each floor for Wireless Access Points
(PoE).

(4 connections for Wireless AP each decks will be for clients. 2 connections for Wireless AP in
top 3 decks for vessel crew. To summarize, total cable connections for Wireless AP will be 22)
4. Cable routing from old accommodation to new with Fibre optic cables (2nos.)
5. Cable routing for TVRO connection in all cabins
6. VSAT antenna cable routing from Top deck to server room

EXISTING NETWORK SYSTEM


1. VSAT System
2. VSAT cabinet with 3 Network Switches & 2 Patch Panels

Below are the existing connections :


Total Decks : 4 decks (Main deck , L1 , L2 & L3 )
L3: total cabins 31 + 4 WIFI , cabin 03-37 no network available and remain cabins all available but cables
to be test.
L2: all cabins no network
L3: all cabins no network
Main deck: all offices / ECR / Mess room require cabling routing.

Below are the estimated items required :


CAT6 SFTP network cable rolls : around 27-28 rolls
AMP Patch Panels : 5-6 AMP patch panels (24 ports each)
AMP Wall socket full set : 120 – 140pcs
Networking Switch POE : 3 Switches (48POE ports each)
2mtr patch panels cables : 280pcs
Cable trunk : 140pcs
RG6 Coaxial cables for TVRO