16.06 Civil Works Checklist
VENDOR LOGO
Doc Ref. No.
Project:
Concrete Grade Design Mix Ref. Ref. Post Concrete Pour Report No.
Ref.Drg.No.:
Location/Type of the
Structure/Pour
BOQ No. Quantity of Concrete (Cum)
Ref BOQ NO. This will be ths ame as pre pour report Ref.Drawing No. This will be ths ame as pre pour report
Cured by covering with Wet Hessian bags / Sprinkling water / application of Curing
01
compound.(tick the method used for curing)
Checked for presence of any Surface Defects i.e., minor/major cracks, voids,
05
segregation of aggregate etc. if any
Check for Bolt alignment and orientation for pedestals for PEB structure / machine
08 foundations, (confirm no damage to nut / bolts due to concrete,greasing is intact to
avoid rust due to curing)
Project:
Clearance by the PEB vendor / client/ machine installer. Requirement of grout type.
01
(e.g cementious / epoxy; self curing/non-shrinkable etc))
Check for the product make, free flow grout/ self leveeling/ manual pour or pumping
02
and expiry date. Manufactureres recommendation for use and apllication procedures.
Check for cleaning of the concrete surface (must be free from oil, grease or loosely
03
adhered material). Dust to be cleaned by air blower.
Check for Pre-soaking of the concrete surface (several hours prior to placing ,
05
concrete surface should be saturated with fresh water)
06 Check for provision for sufficient head for pouring the grout, if manual.
Check for mix proportion (Mixing to be done with mixer) as per Manufactureres
07
recommendation for use and apllication procedures.
09 Any other
Note: Above checklists are based on the general specification for ___________, grouting of bolts/base plates etc.Site requirements and
manufacturuer specs must be checked before using the particular grout material,.
Concrete Grade Design Mix Ref. Ref. Post Concrete Pour Report No.
Ref.Drg.No.:
Location
04 Check for straightness of the channel before placing the same for alignment
05 Check for cleanness and oiling of the channel face before placing the same for alignment
06 Check for the Gap between Channels Joint. There should be no Gap.
Reinforcement placing,tieing with specified binding wire and welding, if required, as per
08
BBS/Drawings/specifications and cleaning of reinforcement as required etc.
Check for Fixity and Stability of the chairs provided to mainting the required spacing between
10
top and bottom mat of the reinforcement.
Check for availability of adequate quantity of Hard Top material (is specified in item
20
requirement) before the start of Concreting.
Check for level after first run of disc trowel and ensuring the same, particularly at the ends
21
prior to go for final finish. Confirm final finish with requirements- smooth or brush-rough finish.
03 Check for Groove cutting, done within 36 hours after pouring the concrete.
05 Check for removal of channels to avoid any damage of the edge of the concrete.
9 Check if conduit is coming within the surface level Before 1st skin , 2nd side
10 Sign off on the number of box cutting on gypsum Before 2nd skin
11 Check for Gypsum Surface level ( Bottom - Patti ) After POP / Gypsum plastering
12 Check for gap between partition and skirting After skirting installation
13 Check for gap between partition and door frame After door frame installation
14 Check for gap between door jambs and C-clips After fixing of glass on door
15 Check for gap between ceiling grid joints After grid fixing
16 Check for ceiling grid alignment After ceiling tile fixing
17 Check for gap between diffuser box and grid After fixing of diffuser box
18 Check for Paint quality - brush marks / dents or uneven After final coat of paint
surface / bubbles / light and dark patches
19 Chipping of floors -whether complete Before gyp board plastering starts
20 Whether all cabins / Workstations have chairs Before Fnal Handover
WORKS INSPECTION FORM MICROSOFT CAMPUS - PH-III TENANT IMPROVEMENT WORKS
REQUEST DATE:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Supports to be screwed
properly in a zigzag
3 Track abutment with the supports. manner for additional
strength or as specified
by the architect.
REQUEST DATE:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Gypsum level to be at an
apt optimum distance
(preferrably 20 mm)
1 Gypsum finish along the tracks.
above the track edge to
avoid damage due to
swing in partition panels.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
1 Care to be taken, not to damage the side finishes while installing panels.
No damaged panels to
2 Panels to be checked for damaged acoustic boards.
be accepted.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
No marks, scratches,
2 Finish at door handles
dents or fabric damage.
No marks, scratches,
3 Finish at the hinges
dents or fabric damage.
No marks, scratches,
4 Finish at the vision panels.
dents or fabric damage.
No marks, scratches,
5 Finish at the edges of the partition panels
dents or fabric damage.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
10
11
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
MARKING
As per the architectural
1 Marking of the column cladding outline on the floor.
drawing
Electrical, LSS services provisions marked with paints Red paint to be used for
2
on relevant locations around the cloumn markings. distinction.
Wooden members to create the framing are either maple or sal wood as approved
1
by the architect.
As per services
5 Slots in the frame to lay conduits.
requirements.
As per services
6 Check for conduits' laying, cabling/wiring.
requirements.
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
3
B NON CONFORMITY - MAJOR
1
REQUEST DATE:
Wooden members to create the framing are either maple or sal wood as approved
1
by the architect.
As per services
5 Slots in the frame to lay conduits.
requirements.
As per services
6 Check for conduits' laying, cabling/wiring.
requirements.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
1 Ply fixed to the frame for fixing Gypsum boards. 4 mm, fixed firmly.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
1.5 mm thick;
Pattern and shade as
3 Laminate finish.
approved by the
architect
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
FINISH
As per architects
3 Staining of laminate.
approval.
Shade as approved by
4 Polyurathene coating of exposed wooden sections.
the architect.
As approved by the
5 Emulsion Paints
architect.
As approved by the
6 Duco Paints
architect.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
SKIRTING
Coated with
Polyurathene coat of
22 4" x 3/4" Maple wood skirting
approved shade by the
architect.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
As Per Method
1 Hacking of wall/ floor surface
Statement
Water pools to be
4 Moistening of tile
avoided on surface
Fixing of tiles using spacers of width as specified, with C.M: 1:4, PVC spacers
5
cement slurry to be used.
Vitrified /Ceramic Tile Dadoing or Flooring-check list after tiling for floors
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Check for completion of preceding activities like fixing of As per service, sanitation
1
service conduits, water supply and sanitation lines. requirements.
Make as approved by
9 Check for proper installation of Plaster Mesh.
architect.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
6 Check for Dimensions, plumb, levels and right angles. Deflection < 2mm
REQUEST DATE:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
2 coats, as per
architect's approval,
3 Coats of bituminous paint. paint not to discolor,
stain or disfigure the
stone.
Steps during Cladding
No Deflection; At desired
4 Marking of the GI clamp locations.
heights, as per the dwg.
As approved by the
9 The grooves shall be filled with sealant.
architect.
REQUEST DATE:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
7 Check for true level surface, plumb and Right angles. No Deflections
Make as approved by
9 Joints has to be filled by cement based grout
the architect.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
9 Check for time interval between two coats AS per the specs
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
Floor:
2 Plumb and Size of Plate fixed to the channel Depth should not exceed more than 200mm
3 Allignment of Fixed supports to Line dorie All supports to be alligned to the required level
6 Grouting after fixing the supports To be filled with concrete.Finished to match the plastered surface
Floor:
2 Plumb and Size of Plate fixed to the channel Depth should not exceed more than 200mm
3 Allignment of Fixed supports to Line dorie All supports to be alligned to the required level
6 Grouting after fixing the supports To be filled with concrete.Finished to match the plastered surface
REQUEST DATE:
10
11
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Vertical: Plumb
deflection<1mm.
2 Frame alignment.
Horizontal: L- angle
deflection< 1 mm.
5 Gap between bottom of door frame and floor. Gap < 2 mm.
Cuts in the frames to incorporate hinges, wirings etc. are to be properly filed and
7
sharp edges are to be avoided.
8 Gaps between the dry wall and the jamb cover No Gaps
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Verticality: Plumb
1 Shurtter imperfections. deflection< 1 mm
Waviness: None
Alignment: Straight
7 Groove finishes.
Paint: As per specs.
REQUEST DATE:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
No scratches, bubbles,
5 Glazing
or marks.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
10
11
CONSULTANT'S NOTE ON WORKS EXECUTED:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
SL #
INSPECTION DETAILS STANDARDS
As per marking;
Screwing of ceiling angles along the soffit with proper GI Minimum distance
1
cleats and expansion fasteners. between two consecutive
screws < 1200 mm.
Firmly fixed;
Anchor Fastners as
2 Hanging veritical supports.
approved by the
architect.
3
CONSULTANT'S NOTE ON WORKS EXECUTED:
SL # OBSERVATIONS
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY:
SL #
INSPECTION DETAILS STANDARDS
As per marking;
Minimum distance
4 Screwing of the Wall Angles.
between two consecutive
screws < 610 mm
CONSULTANT'S NOTE ON WORKS EXECUTED:
SL # OBSERVATIONS
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY:
SL #
INSPECTION DETAILS STANDARDS
SL # OBSERVATIONS
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY:
SL #
INSPECTION DETAILS STANDARDS
SL # OBSERVATIONS
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY:
REQUEST DATE:
Electrical, LSS services provisions marked with paints Red paint to be used for
5
on relevant locations around the partition markings. distinction.
ACMV services points marked on the relevent locations Blue colour to be used
6
around the partition markings. for distinction.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
The sections running along the markings on the floor and soffit should be screwed
3 firmly. If required, provide cross bracings to make frames even more stable and
firm.
The erection of the frame to be done in tandem with plumbs and L- Angles to
4
ensure right angles at corners both in vertical and horizontal directions.
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
REQUEST DATE:
3 Ply backings are provided at appropriate locations for the white boards.
4 There is no gap between two adjacent gypsum sheets. Gap < 2 mm.
Cut outs for the switch sockets are provided at proper As per Electrical
5
locations. requirements.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
2 x 12 mm ply for
Laminate; 19 mm for
1 Ply boards are not damaged, wet or wavy. Veneer;
Make as approved by
the architect.
2 There is no gap between two adjacent plyboard sheets. Gap < 2 mm.
Cut outs for the switch sockets or any other services As per services'
3
items are provided at proper locations. requirements.
All gaps are sealed properly using gypsum compound (and ply board pieces if
4
required).
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
The second layer should have the provision for the ply
100 mm high;
1 backing for the 100mm postformed skirting at the
No undulations.
bottom.
The gypsum boards in the second layer should not be exactly in line with those in
2
the first layer, but a little staggered as far as joints are concerned.
3 Cut outs for the switch sockets are provided at proper locations.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Shade as approved by
9 Polyurathene coat on exposed wooden surfaces.
the architect.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Corners to be perfect
4 Tiles are not damaged.
right angle and in shape.
The corner trims if any should be properly finished. The ply backing for the
6
softboard should not be visible from sides.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
CONTRACT CLAUSE
BOQ REF. NO.
ITEM DETAILS: RAISED LOORING
LOCATION FOR
INSPECTION
SL #
INSPECTION DETAILS STANDARDS
Check the raised flooring shall be installed as per Floor finish level 450-
5
tharchitectural drawings. 600mm high
As Per Manufacturers
9 Check the Adhesives used for laying vinyl floor
Specs
SL # OBSERVATIONS
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY:
DATE
INSPECTION BY
TIME
CONTRACT CLAUSE
BOQ REF. NO.
ITEM DETAILS: RAMP FOR RAISED FLOORING
LOCATION FOR
INSPECTION
SL #
INSPECTION DETAILS STANDARDS
Check the Size of Heavy duty MS Powder coated 1' X 1' C/C as per
3
section frame. manufacturers Specs.
Check the frame work top and sides has to be fixed with 32mm thick Marine
4
Marine grade black board. grade black board.
As Per Manufacturers
8 Check the Adhesives used for laying vinyl floor
Specs
As per Manufacturers
9 Check the copper earthings and end termination.
Specification.
Check the Slope,levels and surface finish after ramp Uniform level and
13
raised flooring. smooth surface
CONSULTANT'S NOTE ON WORKS EXECUTED:
SL # OBSERVATIONS
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY:
DATE
INSPECTION BY
TIME
REQUEST DATE:
10
11
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
As per manufacturer's
4 Curing of Self Levelling Compound
specification.
As per design
5 Marking of the flooring pattern. recommended by the
architect.
As per manufacturer's
6 Application of adhesive specification. To be
applied uniformly
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
10
11
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
As per marking;
Minimum distance
4 Screwing of the GI Perimeter channels.
between two consecutive
screws < 610 mm
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
As per marking;
Screwing of ceiling angles along the soffit with proper GI Minimum distance
1
cleats and expansion fasteners. between two consecutive
screws < 1220 mm.
Firmly fixed;
2 Hanging veritical supports. Screws as approved by
the architect.
Check for support for the cove and recess provisions in the ceiling. Cross frames
3
to be provided for vertical faces longer than 250 mm.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Cutting of supports and framework at proper locations for trap doors as per
3
services-interior coordinated requirements.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Electrical, LSS services provisions marked with paints Red paint to be used for
5
on relevant locations around the partition markings. distinction.
ACMV services points marked on the relevent locations Blue colour to be used
6
around the partition markings. for distinction.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Wooden members to create the framing are either maple or sal wood as approved
2
by the architect.
As per services
5 Slots in the frame to lay conduits.
requirements.
As per services
6 Check for conduits' laying, cabling/wiring.
requirements.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
2 x 12 mm ply for
Laminate; 19 mm for
1 Ply boards are not damaged, wet or wavy. Veneer;
Make as approved by
the architect.
2 There is no gap between two adjacent plyboard sheets. Gap < 2 mm.
Cut outs for the switch sockets or any other services As per services'
3
items are provided at proper locations. requirements.
All gaps are sealed properly using gypsum compound (and ply board pieces if
4
required).
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Shade as approved by
9 Polyurathene coat on exposed wooden surfaces.
the architect.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5
SUBMITTED BY: VERIFIED BY: VERIFIED BY:
REQUEST DATE:
Coated with
Polyurathene coat of
1 4" x 3/4" Maple wood skirting
approved shade by the
architect.
REQUEST DATE:
CORRECTIVE CORRECTIVE
SL # OBSERVATIONS ACTION REMARKS ACTION REMARKS
DATE DATE
A NON CONFORMITY - MINOR
1
2
3
4
5
6
7
C OTHERS
1
2
3
4
5