1. Consistent with the requirements of the NOGICD Act (2010) and NCDMB published HCD
Implementation Guidelines (2014), Contractor shall provide Human Capacity Development (HCD)
training as part of its obligations under this contract. The HCD value shall be determined by
Company, based on the HCD Budget Matrix (Table 1, Appendix 1 to Exhibit D - Nigerian Content
Exhibit) of the NCDMB HCD Implementation Guidelines.

2. The HCD value is a reimbursable cost to be solely utilized by Contractor for HCD training and
not be used for training of Contractor or Company personnel.

3. After contract execution, Company shall timely request Contractor to provide a Training
Implementation Proposal (TIP)/Human Capital Development Plan for Company review and
approval.

4. Company shall reimburse the HCD training expenditure, without mark-up to Contractor, based
on review of Contractor's actual expenditure as preapproved by Company

 Contract Term is 3 years with the option to extend for 2 years (3+2)

 Standby Charge on rig per month will be applied when total consecutive standby days
exceeds 20 days within 30 day period

 Bidder must input values in yellow and blue colour cells

 If Bidder enters a zero value for any item, an explanation MUST be provided

 Bidder's proposal MUST be for its latest/highest technology product as of the date of bid
submission

 All prices are subject to the pricing conditions of the Part 5, Commercial Terms of this ITT.
Bidder's proposal should NOT be subject to pricing conditions proposed by bidder

 Bidders are to take into cognizance the backup equipment to be provided when pricing for
each line item. Prices must be final cost to Company and include combined cost of primary
and backup unit

 Equipment costs must include redress costs if applicable

 Payment Terms will be 60 Days after receipt of correct invoice

 Currency Split 60% USD/40% NGN

 Applicable Incoterms Delivery Duty Paid

Tender No:Esso. 00000098


ES/NCDMB/EEPNL-TITT/UPD/120224/PROVISION OF ENVIRONMENTAL WASTE MANAGEMENT
SERVICES ESSO.00000098 1 March 2024
Esso Exploration and Production Nigeria Limited Part 3
NNPC/EEPNL PSC Drilling Program Exhibit B
Technical Proposal Requirement Environmental Waste Management Services

Exhibit B Tables
Nigerian Nigerian
Equipment - Rental
TABL Content Content
Rates are all-inclusive. Rates are applicable only to Rate US$
E Unit (percentage US $
personnel and equipment on the drilling unit or at a per Unit
B1 based on
Company designated facility.
value)
B1.1 Tote Tanks. Stainless Steel Enclosed Construction. 6bbls-10bbls Day
Closed Top Container (Environmental Waste Skip) with no drain
B1.2 Day
ports with SWL of circa 5 to 7Tons
Open Top, Water Tight Container / Skip for Non-Hazardous
B1.3 Day
Waste – Minimum Capacity: 7 metric tons
Open Top, Water Tight Container / Skip for Non-Hazardous
B1.4 Day
Waste – Minimum Capacity: 10 metric tons
Open top, side opening, easy discharge trash containers for
offshore applications (no open drain ports) to contain scrap
B1.5 Day
metals and rig wastes (paper, plastic, glass and wood). Minimum
capacity of 7.5 cubic meters.
Drilled cutting waste disposal environmental skips. Skips
assigned to Company’s operation shall at all times be certified
B1.6 Day
according to the current EEPNL cargo handling guidelines,
inspection and color code criteria

Nigerian Nigerian
Content Content
TABLE Materials and Equipment Purchased Rate US$
Unit (percentage US $
B2 Rates are all-inclusive per Unit
based on
value)
B2.1 1 -1.5 Metric Ton Rated Jumbo Trash Bag. each
B2.2 Absorbent Pad (18” x 18” x 3/8” thick). each
B2.3 Sawdust per 25KG bag each
B2.4 Waste Transport Drum Each

Nigerian Nigerian
TABL Content Content
Processing & Disposal Services Rates are all-inclusive of Rate US$
E Unit (percentage US $
materials, equipment, personnel, services, etc. per Unit
B3 based on
value)
B3.1 Medium and heavy Brine (eg. ZnBr, CaBr, etc.) bbl
Metric
B3.2 Medium and heavy Brine (eg. ZnBr, CaBr, etc.)
Ton
Contaminated Solids: Centrifuge Drill cake, Earth, sawdust sand Metric
B3.3
etc. Ton
Contaminated Workover/Completion Fluids & Water base mud,
B3.4 bbl
Brine,Sludge, Slop, emulsion
Contaminated Workover/Completion Fluids & Water base mud, Metric
B3.5
Brine base Sludge, Slop, emulsion Ton
Contaminated Non-Aqueous Drilling Fluids (NADF), Oil base
B3.6 bbl
Sludge, Slop etc.
Contaminated Non-Aqueous Drilling Fluids (NADF), Oil base Metric
B3.7
Sludge, Slop etc Ton
Empty Metal Drums/Containers (may contain of residues of
B3.8 each
Chemicals, Oils, Paint, etc.)
Empty Plastic Drums/Containers/IBC tanks (may contain of
B3.9 each
residues of Chemicals, Oils, Paint, etc.)
Tender No:Esso. 00000098
ES/NCDMB/EEPNL-TITT/UPD/120224/PROVISION OF ENVIRONMENTAL WASTE MANAGEMENT
SERVICES ESSO.00000098 2 March 2024
Esso Exploration and Production Nigeria Limited Part 3
NNPC/EEPNL PSC Drilling Program Exhibit B
Technical Proposal Requirement Environmental Waste Management Services
Nigerian Nigerian
TABL Content Content
Processing & Disposal Services Rates are all-inclusive of Rate US$
E Unit (percentage US $
materials, equipment, personnel, services, etc. per Unit
B3 based on
value)
B3.10 Acid/Caustic Solutions litre
B3.11 Acid/Caustic Solutions kg
B3.12 Used Lube/Motor Oil, (Waste oil), Crude oil, Grease, etc bbl
Metric
B3.13 Used Lube/Motor Oil, (Waste oil), Crude oil, Grease, etc.
Ton
Metric
B3.14 Caked or damaged Chemicals (powdery or caked chemicals)
Ton
B3.15 Lead-Acid Batteries each
Oil-Stained Solids: Rags, Clothing, Absorbent Pads, Wood, Oil
B3.16 Kg
Filters, Grease Tubes, Dope Brushes etc.
B3.17 Medical Wastes Kg
B3.18 Electronic Equipment, Alkaline Batteries Kg
Metric
B3.19 NORM WASTE (Natural Occurring Radioactive Waste)
Ton
Non-Hazardous Wastes
Metric
B3.20 General Trash: Wood, Glass, Paper, etc, per metric ton
Ton
Metric
B3.21 Metal Trash: Scrap Metal, Wiring, etc. per metric ton
Ton
B3.22 Food Wastes per kilograms Kg

Nigerian Nigerian
Rate Content Content
TABLE inland Transportation
Unit US$ (percentage US $
B4 Rates are all-inclusive
per Unit based on
value)
Metric
B4.1 Trucking charge per MT (Gross Weight)
Ton
Vacuum Truck (Evacuation Operator, driver, hauling and crew
B4.2 bbl
charges inclusive)

Enter Nigerian
Contra
Table Miscellaneous charges perce content
ctor
B5 ntage (percentage
Part no
based on value)

B5.1
Percentage off Nigeria Price Book (Discount)

Buy - Back charge


B5.2 Third Party services and equipment supply. (Cost 5%
Plus). Percentage.

Table B6 Equipment – purchase / rental – contingency


Rates are all-inclusive.

Tender No:Esso. 00000098


ES/NCDMB/EEPNL-TITT/UPD/120224/PROVISION OF ENVIRONMENTAL WASTE MANAGEMENT
SERVICES ESSO.00000098 3 March 2024
Esso Exploration and Production Nigeria Limited Part 3
NNPC/EEPNL PSC Drilling Program Exhibit B
Technical Proposal Requirement Environmental Waste Management Services
B6.1 Items as listed in Contractor’s Nigeria Standard Price Book –

Tender No:Esso. 00000098


ES/NCDMB/EEPNL-TITT/UPD/120224/PROVISION OF ENVIRONMENTAL WASTE MANAGEMENT
SERVICES ESSO.00000098 4 March 2024

You might also like