I certify that all information furnished by me is true; and that I and any of my dependent have not
borrowed any money under subsidy linked scheme from any Central / State Government or bank for
establishing any such project
Place:
Date: Signature of the Applicant
For Official Use only: (Rejected / to be placed before District Task force Committee)
Reason (if Rejected):
1.2
Taluk/Block:
District: Pin:
State:
Email: Mobile:
4 Qualification
Academic Technical
12th Pass
Manu-
Whether the
√
Service
6 facturing
Unit
project (mark √) Unit
8 Name of the project / business activity proposed :
Legal Status:
Land ###
BUILDING DETAILS
Particulars Area Rate/Sq.ft Amount in Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MACHINERY DETAILS
Particulars Qty. Rate Amount in Rs.
0.00
0.00
0.00 Male
0.00
0.00
0.00 KVIC
0.00
0.00 DIC (
0.00
0.00
0.00 Rura
0.00
Total 0.00 No
f. Contingency/Others/Miscellaneous
Total 0.00
RAW MATERIALS
Particulars Unit Rate/Unit Reqd. Unit Amount In Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total 0.00
WAGES
No. of Wages Per Month Amount in Rs.
Particulars
Worker Total Month 12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total 0 0.00
SALARY DETAILS
No. of Wages Per Month Amount in Rs.
Particulars
Staff Total Month 12
0.00
0.00
0.00
0.00
0.00
Total 0 0.00
Stock in process
Finished goods
Receivable by
POWER ESTIMATE
Power Requirement
Rate of Interest
Depreciation
On Building
On Machinery
INTRODUCTION
3 Father's/Spouce's Name
10 Project : 4 Months
Implementation
Period
12 Employment : 4
13 Power Requirement : 25 kw
Thermoplastic Materials like HDPE, LDPE, PP, PS ,PVC etc. can be inject moulded into a variety of electrical goods.The
unit proposes to Undertake Job work for moulding of different types of Electrical Switch boards.Surface Boxes, PVC
Electrical conduit pipe fittings and Casing Caping fittings by Injection Moulding method.
The unit proposes to utilise 100% of its manufacturing capacity for making above items under the “GEECAB" and
"GEE-N" brands of M/s Gananayak Cable Industries,Kolkata a reputed manufacturer of ISI marked PVC Wires, Cables,
Electric switch Boards, Electrical Conduit and Casing Caping pipes in Kolkata. The company proposes to function as a
ancillary unit by entering into an agreement with the principals for undertaking job work/ job contract.This
agreement will result in optimum capacity utilization and better returns .
The Promotor has rich experience in this field as it is presently engaged in supervising manufacture of different sizes
and types of electrical switch boards by awarding job work/contracts to various injection moulding units in and
around Kolkata. At present the promotor is supervising contract manufacturing of nearly 45 dies at different units for
making products under the "GEECAB" and "GEE-N " brands of M/s Gananayak Cable Industries, Kolkata. Having
gained rich experience in this field, the promotor wishes to set up its own unit to manufacture such items. Such an
endeavor will result in better quality contol and finished product. The promotor will be ably supported by Mr Anand
Nathani who is a Marketing Director of M/s Gananayak Cable Industries . Mr Anand Nathani has rich experience in
marketing of different types of electrical items to various sectors.
3 COST OF PROJECT
A. Fixed Capital Investment
a. Land : 0
Margin Money Subsidy received From KVIC will be kept in term deposit as per norms of
PMEGP in the name of Beneficiary for three years in the financing branch.
3.2 STATEMENT SHOWING THE REPAYMENT OF TERM LOAN & WORKING CAPITAL :
TERM LOAN
Interest @
Year Opening Balance Installment Closing Balance
12.00%
1st 1811650 120777 1690873 217398
2nd 1690873 362330 1328543 202905
3rd 1328543 362330 966213 159425
4th 966213 362330 603883 115946
5th 603883 362330 241553 72466
6th 241553 362330 0 28986
7th 0 0 0 0
8th 0 0 0 0
WORKING CAPITAL
Interest @
Year Opening Balance Installment Closing Balance
12.00%
1st 316540 21103 295437 37985
2nd 295437 63308 232129 35452
3rd 232129 63308 168821 27856
4th 168821 63308 105513 20259
5th 105513 63308 42205 12662
6th 42205 63308 0 5065
7th 0 0 0 0
8th 0 0 0 0
6 Administrative Expenses :
6.1 Salary
0 0 0.00 0.00
0 0 0.00 0.00
0 0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
Total 0 0.00
Manufacturing Expenses
Raw Material 0.00
Wages 432000.00
Repair & Maintenance 12000.00
Power & Fuel 720000.00
Other Overhead Expenses 12000.00
Affix latest
attested
Photograph
5 Unit Address : 0
0
Taluk/Block: 0
District : 0
Pin: 0 State: #REF!
Phone #REF!
E-Mail #REF!
8.1 How the activity was financed so far : ( To be filled up in case of existining unit Only )
*Source of Funds Security Rate of Repayment per Present O/s Amount of Default
Interest Month ( Rs. in '000 ) (if any)
9 Project Details for Proposed New Unit : Copy of detailed project report is enclosed.
a Expansion / Mordenisation :
9.1 Capacity (Furnish the details of Installed capacity & production : (No. in Units/ Qty. in Kg./Volume in liter per annum)
Capacity is arrived at on the basis of Days working on shift basis
Product & Present Installed Maximum Prod. Proposed Installed Maximum Prod.
By-product if any Capacity Achieved Capacity of 1st Year envisaged
70.00% 1365750
Administrative Manpower
Accounting personnel
Ancillary Building
Storage
9.9 Plant and Machinery Existing (Value in Rs.) Proposed (Value in Rs.)
Indigenous 1761000.00
Imported
Total 0.00
9.11 Utilities (Furnish details on requirement, availability, adequacy, qualitative aspects etc..)
Particulars of Utilities Contracted Load Connected Load Further requirement
in HP/KW/W in HP/KW/W in HP/KW/W
Power
Water
Fuel
Others (Specify)
9.12 Environment Aspect of the Project :
J Provision for
1. Buildings 0.00
2. Plant & Machinery 0.00
3. Other Fixed Assets 0.00
B Reserves 0.00
F Subsidy
Central Government 560050.00 560050.00
State Government 0.00
14 Projected Cash flow Statement : Projected Cash flow Statement given in the
Detailed Project Report.
3. Occupation :
4. Details of movable & immovable
properties owned by him /her/other
family members
18 Government Consents :
(Give deatails of various licenses / consents required to be obtained from various authorities for the proposed project)
19 DECLARATION
I / We hereby declare that the information given herein before and the statements and
other papers enclosed are, to the best of our knowledge and belief, true and correct in all particulars
Prepared By:
#REF!
Khadi & V.I. Commission
#REF!
#REF!
#REF! State: #REF!
e-Mail:
Ph. No. Fax: