Sintering Cycle :
Switch the furnace ON / OFF as per cycle given below:
1 minOn 9 min Off 60 min
2 minOn 8 min Off 60 min
3 minOn 7 min Off 60 min
4 minOn 6 min Off 60 min
5 minOn 5 min Off 60 min
6 minOn 4 min Off 60 min
7 minOn 3 min Off 60 min
Continuous On:
Switch the furnace ON continuously at power and time as per the instructions
given below:
0 KW 60 min
50 KW 60 min
75 KW 60 min
100 KW 60 min
125 KW 30 min
250 KW up to full melting (Super heating) & 1500 Degree Centigrade
Temperature hold
for 1 hour
Note:
Minimum Heats - 250 Nos.
Maximum Heats - 400 Nos.
Lining to be checked every day after 250 heats.