PLAN PREVENTIVE MAINTENANCE

PENGURUSAN FASILITI BAGI


BLOK E 4/5, KOMPLEKS E, PUTRAJAYA
TAHUN 2017 - 2020
JKR WP PUTRAJAYA
PREVENTIVE MAINTENANCE CHECKLIST LOCATION/LEVEL
WORK TRADE ELECTRICAL
SMATV RISER
MONTH :
THURSINAR DETAILS WEEK : DATE
CORPORATION FREQ : YEARLY
SDN BHD

PPM Details
Group: ELECTRICAL Location: SMATV Riser
Category: STRUCTURED CABLING SYSTEM Level: All Level
Item No: 15.0 Specification: -

Task Description
No Description Freq Pass Fail N/A Remark
15.0 Structured Cabling System
b Ensure all cables are functioning. Replace if faulty. Y

Inspection Report / Remarks

GOOD NEED RECTIFICATION NEED REPLACEMENT OTHERS

Serviced By: Check By: Verified By:

________________ ________________ ________________


(Telco Technician) (Electrical Engineer) (Verifier)
Name: Name: Name:
Date: Date: Date: