b) Open ammonia bypass valve a) If not started in 5 to 10 min adjust running a) No action required if ammonia started
(manually). cycle into account time loss,& time required in5 min.
c) Clean lance tube. to go to its original position.
d) Check pressure b)Keep charge at non-confirming area
c Ammonia regulator & flow meter if not ok then b) If not started in 45 min then take charge into c) Check micro sample,visual CD and rework
repair it or change it. vestibule cool for 10 min & quench the charge take with modifid cycle .
out of furnace. d) After rewok cycle check
surface hardness 100 % & do additional
testing for lab at different locations.