B-CONCRETE
1. ALL CONCRETE SHALL BE MACHINE MIXED,VIBRATED & CURED FOR MINIMUM 10 DAYS.
1 1 2. USE OF NEEDLE VIBRATOR IS COMPULSORY FOR ALL CONCRETE WORK.
AS PER 500
3. PH VALUE OF THE WATER TO BE USED, SHALL NOT BE LESS THAN 6.
4. GRADE OF CONCRETE SHALL BE M-20
C-REINFORCEMENT
B VERT. REINF. B
4-T16 (a) 900 1. LAP AT SUPPORT SECTION,JOINT SECTION & MID SPAN SHALL BE AVOIDED.
2. OVERLAPPING OF REINFORCEMENT SHALL BE STAGGERED.
SITE
N.G.L. +8-T12 (b) VERT. REINF. 3. USE HYSD BARS Fe 500 CONFIRMING TO I:S:1786
a b b a 4-T16 (a)
+8-T12 (b)
b b TIES
900
b b T8@190C/C
PEDESTAL
C
T8@190c/c 900x900 a b b a 150 0.3mm TO BE UNDER CUT FOR
2000
35
T10@200 C/C (SCALE-1:100) 20Dia ANCHOR BOLT LOCK NUT
AT TOP
STD. NUT
75 40
THREADED
150
BASE PLATE STD. WASHER
A
150x150x12Thk.
300
BASE PLATE
GALVANIZED
L65X65X5 THK. OF STRUCTURE.
17.7
75 THK. T10@200 C/C C.G STD. HEXAGONAL NUT
LENGTH (EL)
D
L
75
EMEBDED
TIES DETAIL OF BASE PLATE
1500 x 1500 D
1800 x 1800
SECTION:-`A-A'
`A'
SCALE-1:100 (M.S.) FOUNDATION BOLT
OR B.
700 B/B OF STRUCTURE
CH R
B.
AN CHO
65
585 C/C INSIDE
E ANCHOR BOLT
UT AN
C
L OF COL./FDN. E
X 12
X
. O AL
DIA GON
65
/c DIA
CL OF COL./FDN.
99 7c/c
T10@200c/c
AT BTM BOTHWAYS DETAIL AT `A' SECTION-`X-X'
82
T10@200c/c 0c
AT TOP BOTHWAYS ANCHOR BOLT
900
1500
1800
SCALE:-1:100
PROJECT: 66KV ELECTRIAL SWITCHYARD FOR
60 MW HYBRID - ORA Block No.354 & 355
DWG TITLE: RCC DETAILS FOR 33 KV PT FOUNDATION