Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

REPUBLIK INDONESIA Backup Data

KEMENTERIAN PEKERJAAN UMUM ENGINEERING FIELD


DIREKTORAT JENDERAL BINA MARGA
KONTRAKTOR :
PAKET : Pembangunan jalan Diponegoro kec. Binjai Selatan
CV. PELANGI INDAH

NO. KONTRAK : 602.1-158/BBM/APBD/PU/KB/2014 KONSULTAN SUPERVISI :


TGL. KONTRAK : 24 April 2014 PT. BINA MITRA ARTANAMI
NO. Fisik Pelaksanaan UNIT
URAIAN Volume
DIVISI Sub Bagian SATUAN

1 TOTAL Lapis Aspal Pelekat (Tack Coat)


a. STA 0+000 - STA 0+300 Liter 840.000
b. STA 0+300 - STA 1+002 Liter 1,965.600

Total Lapis Aspal Pelekat (tack Coat) Liter 2,805.600

Tgl PENGGUNA JASA Tgl KONSULTAN Tgl KONTRAKTOR

Bangun Situmorang, ST M. Tombang Hutapea, ST Rialno Tambunan, ST


NIP :1973 0508 2008 121 001 Chief Inspector General Superintendent
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM BACKUP DATA
DIREKTORAT JENDERAL BINA MARGA
KONSULTAN SUPERVISI :
PAKET : Pembangunan jalan Diponegoro kec. Binjai Selatan PT. BINA MITRA ARTANAMI

NO. KONTRAK : 602.1-158/BBM/APBD/PU/KB/2014 KONTRAKTOR :


TANGGGAL : 24 April 2014 CV. PELANGI INDAH
No STA KOEFESIEN LEBAR JARAK LUAS Volume VOLUME
LEBAR
(TCORE/TRENCANA) RATA-RATA L = KOEF x Lrata x J TACK COAT
(M) (M) (M) (M2) (Liter) (M3)

STA (0 + 000) - (0 + 300)

1 0+ 0.00 7.00
7.000 25.00 175.000 0.400 70.000
2 0+ 25.00 7.00
7.000 25.00 175.000 0.400 70.000
3 0+ 50.00 7.00
7.000 25.00 175.000 0.400 70.000
4 0+ 75.00 7.00
7.000 25.00 175.000 0.400 70.000
5 0+ 100.00 7.00
7.000 25.00 175.000 0.400 70.000
6 0+ 125.00 7.00
7.000 25.00 175.000 0.400 70.000
7 0+ 150.00 7.00
7.000 25.00 175.000 0.400 70.000
8 0+ 175.00 7.00
7.000 25.00 175.000 0.400 70.000
9 0+ 200.00 7.00
7.000 25.00 175.000 0.400 70.000
10 0+ 225.00 7.00
7.000 25.00 175.000 0.400 70.000
11 0+ 250.00 7.00
7.000 25.00 175.000 0.400 70.000
12 0+ 275.00 7.00
7.000 25.00 175.000 0.400 70.000
13 0+ 300.00 7.00

Total PenghItungan Tack Coat = 840.000 Liter

TGL PENGGUNA JASA TGL SUPERVISI TGL KONTRAKTOR


REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM BACKUP DATA
DIREKTORAT JENDERAL BINA MARGA
KONSULTAN SUPERVISI :
PAKET : Pembangunan jalan Diponegoro kec. Binjai Selatan PT. BINA MITRA ARTANAMI

NO. KONTRAK : 602.1-158/BBM/APBD/PU/KB/2014 KONTRAKTOR :


TANGGGAL : 24 April 2014 CV. PELANGI INDAH
No STA KOEFESIEN LEBAR JARAK LUAS Volume VOLUME
LEBAR
(TCORE/TRENCANA) RATA-RATA L = KOEF x Lrata x J TACK COAT
(M) (M) (M) (M2) (Liter) (M3)

STA (0 + 300) - (1 + 002)

1 0+ 300.00 7.00
7.000 25.00 175.000 0.400 70.000
2 0+ 325.00 7.00
7.000 25.00 175.000 0.400 70.000
3 0+ 350.00 7.00
7.000 25.00 175.000 0.400 70.000
4 0+ 375.00 7.00
7.000 25.00 175.000 0.400 70.000
5 0+ 400.00 7.00
7.000 25.00 175.000 0.400 70.000
6 0+ 425.00 7.00
7.000 25.00 175.000 0.400 70.000
7 0+ 450.00 7.00
7.000 25.00 175.000 0.400 70.000
8 0+ 475.00 7.00
7.000 25.00 175.000 0.400 70.000
9 0+ 500.00 7.00
7.000 25.00 175.000 0.400 70.000
10 0+ 525.00 7.00
7.000 25.00 175.000 0.400 70.000
11 0+ 550.00 7.00
7.000 25.00 175.000 0.400 70.000
12 0+ 575.00 7.00
7.000 25.00 175.000 0.400 70.000
13 0+ 600.00 7.00
7.000 25.00 175.000 0.400 70.000
14 0+ 625.00 7.00
7.000 25.00 175.000 0.400 70.000
15 0+ 650.00 7.00
7.000 25.00 175.000 0.400 70.000
16 0+ 675.00 7.00
7.000 25.00 175.000 0.400 70.000
17 0+ 700.00 7.00
7.000 25.00 175.000 0.400 70.000
18 0+ 725.00 7.00
7.000 25.00 175.000 0.400 70.000
19 0+ 750.00 7.00
7.000 25.00 175.000 0.400 70.000
20 0+ 775.00 7.00
7.000 25.00 175.000 0.400 70.000
21 0+ 800.00 7.00
7.000 25.00 175.000 0.400 70.000
22 0+ 825.00 7.00
7.000 25.00 175.000 0.400 70.000
23 0+ 850.00 7.00
7.000 25.00 175.000 0.400 70.000
24 0+ 875.00 7.00
7.000 25.00 175.000 0.400 70.000
25 0+ 900.00 7.00
7.000 25.00 175.000 0.400 70.000
26 0+ 925.00 7.00
7.000 25.00 175.000 0.400 70.000
27 0+ 950.00 7.00
7.000 25.00 175.000 0.400 70.000
28 0+ 975.00 7.00
7.000 27.00 189.000 0.400 75.600
29 1+ 1,002.00 7.00

Total PenghItungan Tack Coat = 1,965.600 Liter

TGL PENGGUNA JASA TGL SUPERVISI TGL KONTRAKTOR


REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM BACKUP DATA
DIREKTORAT JENDERAL BINA MARGA
KONSULTAN SUPERVISI :
PAKET : Pembangunan jalan Diponegoro kec. Binjai Selatan PT. BINA MITRA ARTANAMI

NO. KONTRAK : 602.1-158/BBM/APBD/PU/KB/2014 KONTRAKTOR :


TANGGGAL : 24 April 2014 CV. PELANGI INDAH
No STA KOEFESIEN LEBAR JARAK LUAS Volume VOLUME
LEBAR
(TCORE/TRENCANA) RATA-RATA L = KOEF x Lrata x J TACK COAT
(M) (M) (M) (M2) (Liter) (M3)

TGL PENGGUNA JASA TGL SUPERVISI TGL KONTRAKTOR

You might also like