Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

N BILL OF MATERIAL
PT COMPONENT DESCRIPTION NPD ITEM CODE QTY L
NO.

FABRICATION MATERIALS
PIPE
1 PIPE, ASTM A312 TP316/316L, DUAL CERT., BE, 4 PD0BY.PIPE.01 1.0 M
SEAMLESS, S-40S, ASME B36.19M.
FITTINGS
2 ECCENTRIC REDUCER, ASME B16.9, ASTM A403 4X3 PD0BY.REDE.01 1
WP316/316L DUAL CERT., BW, SEAMLESS, S-40S
3 SOCKOLET, MSS-SP-97, ASTM A182 F316/316L, DUAL 4X3/4 PD0BY.SOCKOLET.01 1
CERT., SW, 3000 LBS
4 SOCKOLET, MSS-SP-97, ASTM A182 F316/316L, DUAL 4X1/2 PD0BY.SOCKOLET.01 1 K
CERT., SW, 3000 LBS
5 PIPE NIPPLE, 100MM LONG, BS 3799, ASTM A312 3/4 PD0BY.NIPPLE.03 1
TP316/316L DUAL CERT., PE X NPT(M), SEAMLESS, SCH
80S, ASME B36.19M.
6 PIPE NIPPLE, 100MM LONG, BS 3799, ASTM A312 1/2 PD0BY.NIPPLE.03 1
TP316/316L DUAL CERT., PE X NPT(M), SEAMLESS, SCH
80S, ASME B36.19M.
FLANGES
7 WELDNECK FLANGE, ASME B16.5, ASTM A182 F316/316L, 3 PD0BY.FLANGE.04 1
DUAL CERT., RF, 300#, S-40S
ERECTION MATERIALS
FITTINGS J
8 PLUG HEX HEAD, ASME B16.11, NPT(M) END, ASTM A182 3/4 OPLHAB2TMA12XXX 1
SEE ISO GRADE F316/316L DUAL CERT, 3000 LBS
WD-77135-4"-PD0BY-TIC SHT 2
GASKETS
E 1090.271M
N 1140.149M 9 INSULATION KIT, ASME B16.21, 300#, RF, PHENOLIC 3 PD0BY.GAS.05 1
EL +100.411M W/LAMINATED RUBBER SEAL, W/INSULATION SLEEVE &
WASHER, STEEL WASHER, BOLT & NUT, ASME B16.5
BOLTS
10 STUD BOLT W/2 HEAVY HEX NUTS, ASME B18.2.2, ASTM 3/4 PD0BY.BOLT.01 8
A193 B8 CLASS 2 / A194 GR.8 (PTFE COATED). - 110
mm Length
VALVES / IN-LINE ITEMS
1 I
> 11 GATE VALVE, API 602, BB, OS&Y, ASTM A182 3/4 PD0BYGATRFTE 1
<1
F316/316L, DUAL CERT., TRIM 316SS+STELLITE, 800#,
SOLID WEDGE, NPT(F), HANDWHEEL OPERATOR
12 GATE VALVE, API 602, BB, OS&Y, ASTM A182 1/2 PD0BYGATRFTE 1
F316/316L, DUAL CERT., TRIM 316SS+STELLITE, 800#,
SOLID WEDGE, NPT(F), HANDWHEEL OPERATOR
INSTRUMENTS
13 PRESSURE GAUGE 1/2 78-PG-296B 1
PIPE SUPPORTS
2 14 PIPE SUPPORT 4 FT-D-4C-350-217 1
72
15 PIPE SUPPORT 4 R-S-4" 1
H
S14
FT-D-4C-350-217

PS-77135-PD0BY-002

S15
R-S-4"
4
32

78
13 PG 48 F
296B

54 73 3
101 4X3/4"NPD
75
12 11
STEM SOUTH 102 STEM SOUTH
6

5 51
4
E
3 EL +100.411M 4X1/2"NPD
13
2 8
4X3"NPD
13MM OFFSET
DISCLAIMER: THIS DOCUMENT IS THE PROPERTY OF ADNOC GAS PROCESSING AND CONTAINS CONFIDENTIAL AND PROPRITARY INFORMATION, THAT CANNOT BE COPIED OR

FLAT SIDE U
REPRODUCED OR LENT, IN WHOLE OR IN PART, FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SUPPLIED, WITHOUT THE EXPRESSED AUTHORITY OF

T07-1118

PD CUT PIPE LENGTH


4"N

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
D
<1> 909 4"
CONN TO
7G-103B/N1
3 in RFFE 300# 1 F7 G9 B10
18
E 1089.178M
N 1140.149M
EL +100.423M

0 08.05.24 AS-BUILT TD JG SK
A1A 26.12.22 ISSUED FOR CONSTRCUTION TD JG SK
REV. DATE DESCRIPTION DRN. CHKD. APPVD. C

ADNOC Gas Processing ADNOC


EPC CONTRACTOR ENGG. CONSULTANT:
ADNOC GAS PROCESSING,P.O.BOX 665,ABUDHABI,UAE.

B
Arabian Industries LLC

REFERENCES: PROJECT
NOTES :
1. ALL DIMENSIONS ARE IN "MM", UNLESS OTHER WISE SPECIFIED
P&ID LINE NUMBER
POTABLE WATER SYSTEM UPGRADE
2. ALL ELEVATION / CO-ORDINATES ARE IN "M", UNLESS OTHERWISE SPECIFIED
NOTES :
9. PIPING SPOOL SHALL BE ADJUSTED AT SITE BASED ON FINAL APPROVED
3. NORTH ARROW DIRECTION SHOWS CALLED TRUE NORTH
4. PRIOR TO FABRICATION, THE CONTRACTOR SHALL CHECK THE FINISHED DIMENSIONS
OF FOUNDATIONS AND OF STRUCTURES AND OF EQUIPMENT AGAINST PIPING DRAWINGS
P&ID NO.
WD-77135-4"-PD0BY-TIC
IN TRAIN 1&2 AT RUWAIS
STRAINER VENDOR DRAWING. 5. NPS<=2" DIMENSIONS AND ROUTING SHALL BE FIELD ADJUSTED 07-AD-0012
6. FOR LINE LIST REFER PROJECT DOC. 0500760-SCH-00-LA-1653 ADNOC Gas Processing Proj.No. PLANT LOCATION PLANT
PIPING GA NO.
7. THERMAL INSULATION COATING (TIC) SHALL BE PROVIDED FOR STAINLESS STEEL PIPING. 0500760 RUWAIS NGL TRAIN 1 & 2
8. FOR PIPE SUPPORT STANDARD REFER PROJECT DOC - 0500760-07-LA-2516, FOR PIPE SUPPORT 77-LD-0010
DESIGN OPERATING NDE INSULATION SCHEDULE REFER PROJECT DOC - 0500760-SCH-07-LA-2502 STRESS CN NO. SHEET REV.
LINE LINE TEST PRESS. PAINT A
CLASS SERVICE
TEST TYPE (Barg) PWHT
CODE GENERAL NOTES :
TEMP. (°C) PRESS. (Barg) TEMP. (°C) PRESS. (Barg) MPT/LPT RT TYPE THK 0500760-RT-07-LA-2505
PD0BY WD 70.00 6.00 66.00 0.54 HYDRO 9.00 5% 5% NO NOTE-7 2MM SYSTEM-21
1. CONSTRUCTION CONTRACTOR SHALL VERIFY THE DIMENSION AND PIPING ELEVATION WITH
RESPECT TO ACTUAL SITE CONDITION PRIOR TO FABARICATION/INSTALLATION. WPS NO. WD-77135-4"-PD0BY-TIC 1 OF 2 0
2. FOR PAINTING REQUIREMENTS REFER COMPANY SPECIFICATION DGS-6600-010.
UNIT NO. AREA. EXTRACTED DATE : EXTRACTED BY :
LEGEND: FLOOR OPENING Unit 77 07 2024-05-08 11:02:33 sp3duser04
SHOP WELD FIELD WELD SOCKETWELD THREADED HEAT TRACED PIPE
23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

N BILL OF MATERIAL
PT COMPONENT DESCRIPTION NPD ITEM CODE QTY L
NO.

FABRICATION MATERIALS
PIPE
1 PIPE, ASTM A312 TP316/316L, DUAL CERT., BE, 4 PD0BY.PIPE.01 1.6 M
SEAMLESS, S-40S, ASME B36.19M.
FITTINGS
2 "Y" TYPE STRAINER 4X4 77-G103B/S1 1
3 90 DEG ELBOW LR, ASME B16.9, ASTM A403 WP316/316L, 4 PD0BY.90ELBOWLR.01 1
DUAL CERT., BW, SEAMLESS, S-40S
6X4"NPD FLANGES
4 WELDNECK FLANGE, ASME B16.5, ASTM A182 F316/316L, 4 PD0BY.FLANGE.02 2 K
SEE ISO DUAL CERT., RF, 150#, S-40S
WD-77134-6"-PD0BY-TIC ERECTION MATERIALS
E 1091.231M
FITTINGS
N 1140.149M
EL +102.107M 5 PIPE NIPPLE, 100MM LONG, BS 3799, ASTM A312 3/4 PD0BY.NIPPLE.02 1
TP316/316L DUAL CERT., NPT(M) X NPT(M), SEAMLESS,
SCH 80S, ASME B36.19M
6 PLUG HEX HEAD, ASME B16.11, NPT(M) END, ASTM A182 3/4 OPLHAB2TMA12XXX 1
GRADE F316/316L DUAL CERT, 3000 LBS
GASKETS
7 GASKET NON METALIC FLAT, ASME B16.21, 150#, RF, 4 PD0BY.GAS.02 3
PEGGED GRAPHITE W/316SS INSERT, ASME B16.5
BOLTS J
8 STUD BOLT W/2 HEAVY HEX NUTS, ASME B18.2.2, ASTM 5/8 PD0BY.BOLT.01 24
A193 B8 CLASS 2 / A194 GR.8 (PTFE COATED). - 95
mm Length
VALVES / IN-LINE ITEMS
9 BLIND FLANGE, CL150, RF, ASTM-A182 F316/316L, DUAL 4 PD0BY.BFLANGE.01 1
CERT., ASME-B16.5.

<2> 1
10 GATE VALVE, API 600, BB, OS &Y, ASTM A351 CF8M, 4 PD0BY.GATE.02 1
TRIM 316SS+STELLITE,150#, FLEXIBLE WEDGE, FLGD, RF
HANDWHEEL OPERATOR
11 GATE VALVE, API 602, BB, OS&Y, ASTM A182 3/4 PD0BYGATRFTE 1
F316/316L, DUAL CERT., TRIM 316SS+STELLITE, 800#,
I
SOLID WEDGE, NPT(F), HANDWHEEL OPERATOR
PIPE SUPPORTS
12 PIPE SUPPORT 4 DV-A1-3"-516-4"-S 1
13 PIPE SUPPORT 4 DG-A-3" 1

1697
G

S12
8 DV-A1-3"-516-4"-S
22
DISCLAIMER: THIS DOCUMENT IS THE PROPERTY OF ADNOC GAS PROCESSING AND CONTAINS CONFIDENTIAL AND PROPRITARY INFORMATION, THAT CANNOT BE COPIED OR
REPRODUCED OR LENT, IN WHOLE OR IN PART, FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SUPPLIED, WITHOUT THE EXPRESSED AUTHORITY OF

F4 G7 B8
PS-77135-PD0BY-001
9
270 22
CUT PIPE LENGTH
6
22 3
F4 G7 B8 S13 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
DG-A-3" NO (MM) (IN) NO (MM) (IN)
10 D
SEE ISO 152 GUIDE GAP =0MM
STEM UP <2> 1544 4"
WD-77135-4"-PD0BY-TIC SHT 1 G1-G103B (N-S) RESTRAINT
152
E 1090.271M
300

N 1140.149M 30.1° 2
4"NPD
EL +100.411M 4X4"NPD
35.4°
9
G7 B8
4
21

5 0 08.05.24 AS-BUILT TD JG SK
A1A 26.12.22 ISSUED FOR CONSTRCUTION TD JG SK
11 REV. DATE DESCRIPTION DRN. CHKD. APPVD. C
STEM HOR 171.3 DEG VOR 52.2 DEG
6

ADNOC Gas Processing ADNOC


EPC CONTRACTOR ENGG. CONSULTANT:
ADNOC GAS PROCESSING,P.O.BOX 665,ABUDHABI,UAE.

B
Arabian Industries LLC

REFERENCES: PROJECT
NOTES :
1. ALL DIMENSIONS ARE IN "MM", UNLESS OTHER WISE SPECIFIED
P&ID LINE NUMBER
POTABLE WATER SYSTEM UPGRADE
2. ALL ELEVATION / CO-ORDINATES ARE IN "M", UNLESS OTHERWISE SPECIFIED
3. NORTH ARROW DIRECTION SHOWS CALLED TRUE NORTH
4. PRIOR TO FABRICATION, THE CONTRACTOR SHALL CHECK THE FINISHED DIMENSIONS
OF FOUNDATIONS AND OF STRUCTURES AND OF EQUIPMENT AGAINST PIPING DRAWINGS
P&ID NO.
WD-77135-4"-PD0BY-TIC
IN TRAIN 1&2 AT RUWAIS
5. NPS<=2" DIMENSIONS AND ROUTING SHALL BE FIELD ADJUSTED 07-AD-0012
6. FOR LINE LIST REFER PROJECT DOC. 0500760-SCH-00-LA-1653 ADNOC Gas Processing Proj.No. PLANT LOCATION PLANT
PIPING GA NO.
7. THERMAL INSULATION COATING (TIC) SHALL BE PROVIDED FOR STAINLESS STEEL PIPING. 0500760 RUWAIS NGL TRAIN 1 & 2
8. FOR PIPE SUPPORT STANDARD REFER PROJECT DOC - 0500760-07-LA-2516, FOR PIPE SUPPORT 77-LD-0010
DESIGN OPERATING NDE INSULATION SCHEDULE REFER PROJECT DOC - 0500760-SCH-07-LA-2502 STRESS CN NO. SHEET REV.
LINE LINE TEST PRESS. PAINT A
CLASS SERVICE
TEST TYPE (Barg) PWHT
CODE GENERAL NOTES :
TEMP. (°C) PRESS. (Barg) TEMP. (°C) PRESS. (Barg) MPT/LPT RT TYPE THK 0500760-RT-07-LA-2505
PD0BY WD 70.00 6.00 66.00 0.54 HYDRO 9.00 5% 5% NO NOTE-7 2MM SYSTEM-21
1. CONSTRUCTION CONTRACTOR SHALL VERIFY THE DIMENSION AND PIPING ELEVATION WITH
RESPECT TO ACTUAL SITE CONDITION PRIOR TO FABARICATION/INSTALLATION. WPS NO. WD-77135-4"-PD0BY-TIC 2 OF 2 0
2. FOR PAINTING REQUIREMENTS REFER COMPANY SPECIFICATION DGS-6600-010.
UNIT NO. AREA. EXTRACTED DATE : EXTRACTED BY :
LEGEND: FLOOR OPENING Unit 77 07 2024-05-08 11:02:33 sp3duser04
SHOP WELD FIELD WELD SOCKETWELD THREADED HEAT TRACED PIPE

You might also like