Checklist For Wall Flooring Tile (REV 20.01)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

TOWELL CONSTRUCTION & CO. L.L.C.

PROJECT : 88 VILLAS AT AL KHOUDH

CHECKLIST FOR WALL / FLOORING TILE

Area/ Bldg : Date :

Drawing No :
Location :

Sl.No. Description Observed results Remarks

1 Surface cleaned, dry ,free from oil, grease, other foreign materials Yes No N.A

2 Check tiles/ skirtings with approved sample Yes No N.A

3 Check for tile layout and expansion joint location if any Yes No N.A

4 Check for Consistency of joint alignment & joint size. Yes No N.A

5 Line , level checked before starting of tiles laying Yes No N.A

6 Check alignment for skirting to true line Yes No N.A

7 Any un evevness, air voids found Yes No N.A

8 Check for polishing work Yes No N.A

9 Touch up & repair (if any) completed Yes No N.A

10 Clearance for MEP Works/ subsequent activities Yes No N.A

11 Proper protection provided to avoid damage to tilings Yes No N.A

TOWELL CONSTRUCTION TRAID OMAN

TCC/167/CL/019/20.01.11 Page 1 of 1

You might also like