Professional Documents
Culture Documents
Checklist For Wall Flooring Tile (REV 20.01)
Checklist For Wall Flooring Tile (REV 20.01)
Checklist For Wall Flooring Tile (REV 20.01)
Drawing No :
Location :
1 Surface cleaned, dry ,free from oil, grease, other foreign materials Yes No N.A
3 Check for tile layout and expansion joint location if any Yes No N.A
4 Check for Consistency of joint alignment & joint size. Yes No N.A
TCC/167/CL/019/20.01.11 Page 1 of 1