Chapter 1 foreword............................................................................. 2
Chapter 3 MAINTENANCE...........................................................11
3.1 ROUTINE MAINTENANCE............................................................................................. 11
3.1.1 Clean the Appearance....................................................................................................... 11
3.1.2 Replace Fuse............................................................................................................... 12
3.2 DAILY MAINTENANCE.................................................................................................. 12
3.3 WEEKLY MAINTENANCE............................................................................................. 12
3.4 MONTHLY MAINTENANCE.......................................................................................... 13
3.5 YEARLY MAINTENANCE.............................................................................................. 13
3.6 MAINTENANCE BEFORE TRANSPORT OR FOR THE INSTRUMENT THAT
WILL NOT BE USED FOR A LONG TIME.....................................................................13
Chapter 4 troubleshooting............................................................15
1
A/0
Chapter 1 foreword
In the chapter 2, there are related diagram to express function and operation,
the operator can operate the machine and do corresponding maintenance
clearly
In the chapter 3,it is that how to maintain the machine in actual operation .if
no maintenance for a long time, the machine will lose performance
Operate and maintain the instrument following the operation manual and the
service manual.
2
A/0
Display
screen
Sample needle
Power light
Start Key
power startup key
Second:operation process
1) after installing and checking the machine,press the key “power startup key”,the
machine startup,if the power is on,the power supply is working. About 20 second,
it will show the relevant flow in the screen,enter into the system after two minutes;
2) enter into system, test blank once,after that it will show the disdiagram and data
3
A/0
whether it is fited for standard of the operation manual. If not, do that test until the
value fit with the standard. then you can take next step.
3) put sample down the sample needle, let the needlepoint immerge sample, at least a
4) before the test finish, you can not do any thing including mouse movement, only
finishing test, it will show the mouse cursor. At the same time, the sample needle
come back to in situ where it do not test .now you can test sample (finishing test
need 2 minutes )
5) press the key “print”,the printed thermal paper come out from the thermal recorder,
1、interface board
4
A/0
P104 bus
enlarge
Electromagnetic
Two-way
CPLD<---HGB HGB ·enlarge
Valve drive
2. simple introduction
(1) CPLD total control unit
Control every function module how to communicate with P104
(4)printer driver
Amplify the signal of printer driver。
(5)WBC-RBC amplify
Amplified WBC-RBC signal that can be earier to change it to digital signal.
(6)HGB amplify
① Amplified HGB signal that can be earier to change it to digital signal;
5
A/0
(7)P104 bus
The bus that Connect computer board with CPLD of interface board.
(1)funtion diagram
Sampling pump
TWO WAY
Sampling
Liquid
needle Two way
road
and
And flow
bracket
seasor Vacuum
Two way
Measure board pump
cup
(2)simple introduction
(1) liquid tubing board and flow sensor board
6
A/0
P104 Bus p r in t e r J4 7
...... J3 9 J2 9
2 1
J5 1 2 1
2 1
3 2 1
... J5 2
3646
2 1
110V
1 2
J3 1
W B C - R B C A m p lif y
s ig n
J4 8
M o t o r D r iv e r C P L D C o n tro l
r otsis e R el b ats uj d A
r otsis e R el b ats uj d A
1 2 3
1 2 3
9RV
8RV
2 1
J4 0 J2 7
tr o P A r ot o M
tr o P A S N E S
J3 5
1 2 3 4
A d ju stab le R esisto r
1 2 3
3 2 1
V R7
1 2
P O W E R C o n tro l
J4 1 3 4
tr o P B r ot o M
J3 6
tr o P B S N E S
5 6
1 2 3 4
1 2 7 8
V a lv e D r iv e r
1 2 3
JP 5
JP 4
J4 2
tr o P C S N E S
tr o P C r ot o M
J3 7
1 2 3 4
H G B A m p lif y
A SP R E A G E N T
1 2 3
A d j u s ta b le R e s is to r
7 6 5 4 3 2 1 J2 4
POW ER 3 2 1
V R6 HGB
M o to r D P o r t SE N S D P ort V a lv e D r iv e r P o r t W A ST E 计量板接入插座 DLN CLEA N L Y SE A d j u s ta b le R e s is to r
V1 V 12 4 3 2 1 J4 4 5 4 3 2 1
J4 3 J4 9 3 2 1
..........
..........
..........
..........
..........
..........
..........
..........
..........
..........
..........
4 3 2 1 3 2 1 2 1 4 3 2 1 3 2 1 3 2 1 3 2 1
2 1
V R10
J3 8 J3 0 J5 0 J3 2 J3 3 J3 4
J4 5
B、explanation
(1) motor and sensor input port
1) J40: motor A ( motor A in related mechanism fasten board module )
connection port;
7
A/0
connection port;
input port;
6) J37: the sensor C of motor C(the sensor of the related mechanism fasten
board)input port;
port;
8
A/0
9
A/0
1) CN2:connect to screen;
2) CN10:power of main control board;
3) CN1、CN12:connect to PC104 port of interface board;
4) CN11: mouse and keyboard port;
5) CN3: Parallel Port
6) CN13: connect buzzer from 5、6feet
7) CN7: screen data line port
8) CN4、CN5:connect serial line(ex: printer)
9) CN8、CN9:connect USB mouse and keyboard;
10) CN6: LAN
10
A/0
Chapter 3 MAINTENANCE
As other precision instrument, only careful daily service and periodic maintenance
can the instrumenthave a good working status, and can we get the reliable
This chapter introduces some preventive methods for service and maintenance.
If you want to know more relative information, please contact the customer service
department of GENIUS.
According to the requirements for maintenance of the instrument during the using
procedures, we divide the preventive service and maintenance into the following
types: daily, weekly, monthly, yearly and maintenance according to actual need.
Warning:
It is important for the hospital or organization that employs this instrument to carry out
Wipe the appearance of the instrument with neutral detergent or distilled water.
Caution:
Avoid using corrosive acids, alkali, and volatile organic solvent such as: acetone,
aether, chloroforms to wipe the appearance of instrument. Only neutral detergent
can be used.
11
A/0
The fuse is installed in the fuse-box on the side of power switch. Open the box
to replace the fuse expediently.
Warning:
Run
The instrument has installed daily maintenance procedure. On running, it can execute
auto cleaning procedure according to the quantity of the sample to keep the
When the instrument shutdown, it will run daily shutdown auto cleaning procedure.
You only need to clean the workbench and wipe the appearance of instrument when
the power-off.
Act as follows:
12
A/0
b) In the main operation window, press “Menu”button, pops up the menu. In the
Operate as follows:
a. Turn off the power supply, and pull out the power line.
b. Hold up the air filter cover with slotted screwdriver. Take off the cover and
the net. Clean them with neutral detergent brush and put them in the shade.
c. Airing naturally .Brush away the dust clinging on the air filter grid at the
d. Put the air filter grid on the air filter net carefully. Planish them.
Notice:
Only can use the neutral detergent cleaning the air filter. Avoid airing it with heat.
If the instrument is not going to be used in 2 weeks or longer, or need to pack and
transport, performing the following procedures:
In the main operation window, press “Menu” ,choose "Service/Park" in the menu.
13
A/0
Plug the stopples which were pulled out at the first installation into the
corresponding tube connector.
Pull out diluent connection tube, rinse connection tube, lyse connection tube and
waste connection tube and clean them with distilled water. Dry them in shady
Pull out the power wire,packing it in plastics after cleaning with neutral detergent.
Put the instrument and parts packed in plastics into packing cases.
14
A/0
Chapter 4 troubleshooting
malfuction
reason treatment program
phenomenon
A: 1 、checking the tube connector
whether is it leakage
2、enter into submenu :
Mechanic:(password:6800)
the situation which liquid flow
checking each solenoid
into the flow sensor board
valve whether it is normal ,
A .when the liquid flow too
if not, change it.
WBC、RBC fast
B:when taking count of
bubble B .when liquid flow into flow
measurement time ,checking the
sensor , the two lamp is
lamp: having liquid the lamp will be
always on or the down lamp
on, no liquid the lamp will be off. If
is always on
the lamp is always on, press
several pieces of gummed papers
until it is normal. for other reason,
change the board.
A the most possible is aperture
clog :1 enhance flush
Detecting the situation
2 cauterant the aperture
which liquid flow into the flow
3 clean the ruby and reassemble
sensor board
the measurement cup module
A the liquid is quiescence
B use EZ cleaner to clean wall of
WBC and B the liquid flow along wall
flow sensor board module
RBC clog C the liquid flow is normal
C check wheter the two lamp is on,
D the liquid flow slowly 。
if the lamp is always off, change
E wheter is the second foot of
the the board D resulting from
interface board connector
leakage in the vaccum pump E
J50 is connected with ground
connect the second foot to the
ground
15
A/0
16
A/0
17
A/0
18
A/0
19
A/0
20
A/0
21