20 Base Course m3
21 Highway Excavation m3
24 Reconstruction Section m2
70.00 20 1,400
1,000,000.00 1 1,000,000
5.00 14,000 70,000
33,000.00 42 1,386,000
Replace,Install and
Enhance Road Traffic
4 Signs (Warning and No.
Directional) less than
1m2 area each
5 Cracks injection Ton
Road widening,and
embankment for the
new topping material
being well compacted
8 m3
for plazas construction
including the benching
works with the existing
material
Road widening,and
embankment for the
new topping material
being well compacted
10 m3
for plazas construction
including the benching
works with the existing
material
Road widening,and
embankment for the
new base and subbase
selected material being
11 well compacted for m3
plazas construction
including the benching
works with the existing
material
300,000.00 84 25,200,000
800,000.00 20 16,000,000
1,000.00 50 50,000
200,000.00 43 8,600,000