Professional Documents
Culture Documents
Electrical Installation Manual
Electrical Installation Manual
INTRODUCTION
Electrical components and their wiring is a basic of all industrial wiring and installations.
These components need to be studied thoroughly in order to make the control of electrical
circuit more utilizable and effective.
This electrical installation trainer is one trainer module that provides wide scope for study of
individual electrical components both as discrete and a completer circuit.
Features:
* Required components for an individual circuit can be assembled and study the same.
[1]
ELECTRICAL INSTALLATION TRAINER
Pictorial View:
[2]
ELECTRICAL INSTALLATION TRAINER
Components Details:
1. 1 way switch
2. 2 way switch
3. Intermediate switch
5. Bell switch
6. Dimmer switch
21. SMPS
26. Buzzer
[3]
ELECTRICAL INSTALLATION TRAINER
27. Telephone socket
Note:
1. Every time the components are rearranged, remove the L strips and rearrange and fix
the L strip with the help of hand removable screws.
2. Always use the 3 phase input panel module for giving the 3 phase supply.
[4]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENTAL SECTION
EXPERIMENT-1
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON 3Ø input panel module and test the one way switch working.
4. Connect the more no. of one way switch in different configuration and study the same
OBSERVATION:
[5]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-2
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
5. Connect the more no. of 2way switch in different configuration and test the same.
OBSERVATION
[6]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-3
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the intermediate switch working.
4. Connect the more no. of intermediate switch in different configuration and study the
same.
OBSERVATION
[7]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-4
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the intermediate switch working.
4. Connect the more no. of intermediate switch in different configuration and study the
same.
OBSERVATION
[8]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-5
AIM
APPARATUS REQUIRED
3. Buzzer module.
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the Bell switch working with buzzer.
OBSERVATION
[9]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-6
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the dimmer switch working.
OBSERVATION
[ 10 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-7
AIM
APPARATUS REQUIRED
3. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the bell switch with indicator working.
OBSERVATION
[ 11 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-8
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the Two way DPDT toggle switch
working.
4. Connect the Two way DPDT toggle switch in different configuration and study the
same.
OBSERVATION
[ 12 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-9
AIM
To study the working of single phase two pin socket with switch
APPARATUS REQUIRED
5. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the Single phase two pin socket with
switch working.
OBSERVATION
[ 13 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-10
AIM
To study the working of single phase three pin socket with switch
APPARATUS REQUIRED
5. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the single phase socket with switch
working.
OBSERVATION
[ 14 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-11
AIM
APPARATUS REQUIRED
5. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
2. Connect the above circuit. (Follow colour code of wire in plug as mentioned).
3. Switch ON the 3Ø input panel module and test the above circuit switch working.
OBSERVATION
[ 15 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-12
AIM
APPARATUS REQUIRED
5. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
2. Connect the above circuit. (Follow the colour code of wire in plug as mentioned).
3. Switch ON the 3Ø input panel module and test the three phase industrial socket
switch working.
OBSERVATION
[ 16 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-13
AIM
APPARATUS REQUIRED
4. Buzzer Module.
5. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the SPDT toggle switch working.
4. Connect the SPDT toggle switch in different configuration and study the same.
OBSERVATION
[ 17 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-14
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the push button switch working.
4. Connect the push button switch in different configuration and study the same.
OBSERVATION
[ 18 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-15
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the rotary switch working.
4. Connect the rotary switch in different configuration and study the same.
OBSERVATION
[ 19 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-16
AIM
APPARATUS REQUIRED
5. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the Ampere selector switch working.
4. Connect the ampere selector switch in different configuration and study the same.
OBSERVATION
[ 20 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-17
AIM
APPARATUS REQUIRED
4. SMPS module.
5. Patch chords.
PRECAUTION
CONNECTION DIAGRAM
PROCEDURE
5. Study the time interval of sequence relay using the ON time duration of each relay.
OBSERVATION
[ 21 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-18
AIM
APPARATUS REQUIRED
4. SMPS module.
6. Patch chords.
PRECAUTION
CONNECTION DIAGRAM
PROCEDURE
4. Press the push button switch and observe the latching of relay.
5. Release the push button switch and observe the de-energising of latching relay.
OBSERVATION
[ 22 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-19
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the Single phase 2 pole MCB switch
working.
4. Connect the Single phase 2 pole MCB switch in different configuration and study the
same.
OBSERVATION
[ 23 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-20
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the Three phase 3 pole MCB switch
working.
4. Connect the Three phase 3 pole MCB switch in different configuration and study the
same.
OBSERVATION
[ 24 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-21
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the Single phase RCCB/ELCB switch
working.
4. Connect the Single phase RCCB/ELCB switch in different configuration and study
the same.
OBSERVATION
[ 25 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-22
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the Three phase RCCB/ELCB switch
working.
4. Connect the Three phase RCCB/ELCB switch in different configuration and study the
same.
OBSERVATION
[ 26 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-23
AIM
APPARATUS REQUIRED
4. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the NFB/1 pole MCB switch working.
4. Connect the NFB/1 pole MCB switch in different configuration and study the same.
OBSERVATION
[ 27 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-24
AIM
APPARATUS REQUIRED
5. Patch chords.
CONNECTION DIAGRAM
Note:
Line-2 will be always active, Line-1 can be used with 4 pin RJ11 jack.
PROCEDURE
1. Connect 2 pin Telephone jack between the instrument and telephone socket.
3. Enable the telephone line and check the wiring and working.
OBSERVATION
[ 28 ]
ELECTRICAL INSTALLATION TRAINER
EXPERIMENT-25
AIM
APPARATUS REQUIRED
6. Patch chords.
CONNECTION DIAGRAM
PROCEDURE
3. Switch ON the 3Ø input panel module and test the AC digital ammeter and analogue
AC voltmeter switch working.
4. Switch ON 1 way switch in steps and note down the ammeter readings and observe
that its gradually increasing due to increase in load.
OBSERVATION
[ 29 ]