A. PRELIMINERIES 524,266,177.00
TOTAL Err:540
VAT 10% Err:540
GRAND TOTAL Err:540
ROUNDED Err:540
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023 CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
Bill of Quantity
NO. ITEM OF WORKS UNIT TOTAL UNIT PRICE (IDR.) AMOUNT (IDR.)
Mobilization and demobilisation (Demobilization includes removal of their office, uplifting septic tank clearing content and transporting out from factory
1 ls 1 235,000,000.00 235,000,000.00
for disposal, cleaning the area, disposing rubbish etc. outside the factory premises without harming community and any social environment)
4 Electricity power supply required for all project activities (all type of site works etc.) ls 1 104,500,000.00 104,500,000.00
Project documentation, reports, photographs, etc.Drawings and documentations (preliminary, interim and final/as-built) - All drawings and
5 ls 1 24,971,325.51 24,971,325.51
documentations shall be in English.
A.1 Compliance with HSSE Requirement
Fully compliance to Client and Project Safety requirement, procedures, program, training etc. Client has a right NOT to release any payment on this
1 clause due to miss liability or recklessness from Contractor causing HSE incidents/ violation at site during execution of work or never fulfil the ls 1 87,097,249.22 87,097,249.22
commitment and responsibilities in conducting HSE training /program as per the safety plan Including dedicated safety officer
2 Duration of work Week 1.00
3 All workers must have second vaccine include booster Ppl
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
Bill
2 CS Shell Tanks
Shell 1 : Plate 10 mm thk. x 6' x 20'
Shell 2 : Plate 10 mm thk. x 6' x 20'
Shell 3 : Plate 10 mm thk. x 6' x 20'
Shell 4 : Plate 8 mm thk. x 6' x 20'
Shell 5 : Plate 8 mm thk. x 6' x 20'
Shell 6 : Plate 8 mm thk. x 6' x 20'
Shell 7 : Plate 6 mm thk. x 6' x 20'
Shell 8 : Plate 6 mm thk. x 6' x 20'
Shell 9 : Plate 6 mm thk. x 6' x 20'
Shell 10 : Plate 6 mm thk. x 6' x 20'
Shell 11 : Plate 6 mm thk. x 6' x 20'
Shell 12 : Plate 6 mm thk. x 6' x 20'
3 Roof Plate
CS Plate 6 mm x 6' x 20'
4 Roof Frame
230 x 90 x 8.5 x 33.1 kg/m MS 'C' Channel
100 x 50 x 5 x 9.36 kg/m MS 'C' Channel
75 x 75 x 6mm thick MS Angle
22mm diameter x 40mm long MS bolt & nut
15mm diameter x 30mm long MS bolt & nut
9mm thick MS plate
6mm thick MS plate
4.5mm thick MS plate
Sandblasting and Painting to (Structural Frame only)
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 MS Rod
CS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
CS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
CS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ CS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
CS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" CS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
SS U-Bolt & 2 nuts 5/8"
X Blasting Painting
A. Sandblasting and Painting Resistant to temperature 90 ⁰C
A1. EXTERNAL Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning)
X Insulation Works
A. Insulation, Rockwool Wired Blanket # 120 kg/m3, incl. Accessories
B. Steel Support to side of tank as insulation support incl. Accessories as per drawing.
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 5,326.14
kg 3,014.40
kg 198.23
kg 85.86
kg 182.68
kg 85.86
kg 1.77
kg 23.55
kg 4,378.92
kg 4,378.92
kg 4,378.92
kg 3,502.54
kg 3,502.54
kg 3,502.54
kg 2,626.45
kg 2,626.45
kg 2,626.45
kg 2,626.45
kg 2,626.45
kg 2,626.45
kg 8,008.61
kg 2,696.99
kg 393.12
kg 248.70
kg 45.47
kg 10.25
kg 163.21
kg 69.24
kg 74.19
m2 85.13
ORAGE; With Spray Paint method m2 85.13
lot 1
and Chemical by Contractor) lot 1
lot 1
lot 1
lot 1
shell vertical 10%
lot 1
lot 1
Unit 1.00
m' 18.00
set 4.00
kg 7.12
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 151.43
Kg 531.31
Lot 1.00
Lot 1
Lot 1
Lot 1
Unit 1
pe vent pipe Set 1
nit c/w 6 unit 12mm dia screw bolt to both end Set 1
Set 1
Set 1
123,330,870.61 449,109,383.61
8,603,324.35 2,130,986.79
150,000.00 50,000.00 150,000.00 50,000.00
448,353.00 108,472.50 8,070,354.00 1,952,505.00
67,000.00 20,100.00 268,000.00 80,400.00
16,140.20 6,750.00 114,970.35 48,081.79
1,724,908.00 425,910.00
1,366,681.00 436,710.00
806,529.50 257,145.00
4,720,500.00 1,799,600.00
10,000,000.00 3,000,000.00
10,000,000.00 3,000,000.00 10,000,000.00 3,000,000.00
62,500,000.00 22,100,000.00
141,071,838.57 66,127,424.33
247,832,310.20 104,619,418.13
350,000.00 150,000.00 234,095,690.30 100,326,724.42
21,600.00 6,750.00 13,736,619.90 4,292,693.72
8,777,525.19 3,001,240.72
87,250.80 26,175.24 3,228,279.60 968,483.88
58,430.40 17,529.12 4,134,070.23 1,240,221.07
15,000.00 2,500.00 435,000.00 72,500.00
Owner Supply 6,750.00 - 71,533.13
Owner Supply 10,000.00 - 212,256.13
83,272.80 24,981.84 99,927.36 29,978.21
35,000.00 15,000.00 473,979.69 203,134.15
30,000.00 15,000.00 406,268.31 203,134.15
81.48 66.8136
42.00 16.8
perimeter 11.64
total per 11.72 58 1 course
635.95 11 course
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
Bill
2 SS Shell Tanks
Shell 1 : Plate 6 mm thk. x 6' x 20'
Shell 2 : Plate 5 mm thk. x 6' x 20'
Shell 3 : Plate 5 mm thk. x 6' x 20'
Shell 4 : Plate 5 mm thk. x 6' x 20'
Shell 5 : Plate 5 mm thk. x 6' x 20'
Shell 6 : Plate 5 mm thk. x 6' x 20'
Shell 7 : Plate 5 mm thk. x 6' x 20'
Shell 8 : Plate 5 mm thk. x 6' x 20'
Shell 9 : Plate 5 mm thk. x 6' x 20'
Shell 10 : Plate 5 mm thk. x 6' x 20'
3 Roof Plate
SS Plate 5 mm x 6' x 20'
4 Roof Frame
230 x 90 x 8.5mm SS 'C' Channel
100 x 50 x 5mm SS 'C' Channel
75 x 75 x 6mm thick SS Angle
22mm diameter x 40mm long SS bolt and nut
15mm diameter x 30mm long SS bolt and nut
9mm thick SS plate
6mm thick SS plate
4.5mm thick SS plate
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 MS Rod
SS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
SS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
SS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ SS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
SS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" SS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
SS U-Bolt & 2 nuts 5/8"
X Insulation Works
A. Insulation, Rockwool Wired Blanket # 120 kg/m3, incl. Accessories
B. Steel Support to side of tank as insulation support incl. Accessories as per drawing.
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 2,270.44
kg 132.15
kg 87.50
kg 182.68
kg 85.86
kg 1.80
kg 1,783.59
kg 1,486.32
kg 1,486.32
kg 1,486.32
kg 1,486.32
kg 1,486.32
kg 1,486.32
kg 1,486.32
kg 1,486.32
kg 1,486.32
kg 2,043.40
kg 1,284.28
kg 280.80
kg 165.80
kg 32.48
kg 7.32
kg 116.58
kg 49.46
kg 52.99
lot 1
and Chemical by Contractor) lot 1
lot 1
lot 1
lot 1
shell vertical 10%
lot 1
lot 1
m2 117.50
Unit 1.00
m' 15.00
set 4.00
kg 7.26
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 82.49
Kg 292.67
Lot 1.00
Lot 1
Lot 1
Lot 1
Unit 1
pe vent pipe Set 1
nit c/w 6 unit 12mm dia screw bolt to both end Set 1
Set 1
Set 1
m 24.79
ntal member m 46.37
nos 19.43
kg 7.10
m2 13.91
welded to Roof m 0.80
etal blast cleaning) to handrail m2 8.94
ORAGE; With Spray Paint method to handrail m2 8.94
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
261,951,761.49 305,564,398.26
1,691,120.90 4,776,941.76
150,000.00 50,000.00 150,000.00 50,000.00
Owner Supply 303,720.00 - 4,555,800.00
167,500.00 20,100.00 670,000.00 80,400.00
120,000.00 12,500.00 871,120.90 90,741.76
222,000.00 1,130,400.00
1,273,000.00 1,141,200.00
841,200.00 647,640.00
59,037,660.00 17,641,013.50
11,000,000.00 1,844,000.00
10,000,000.00 3,000,000.00
10,000,000.00 3,000,000.00 10,000,000.00 3,000,000.00
75,500,000.00 24,100,000.00
138,740,162.88 58,451,757.12
350,000.00 150,000.00 130,053,161.28 55,737,069.12
21,600.00 6,750.00 8,687,001.60 2,714,688.00
5,812,094.84 1,985,711.76
87,250.80 26,175.24 2,162,947.33 648,884.20
58,430.40 17,529.12 2,709,424.89 812,827.47
15,000.00 2,500.00 291,450.00 48,575.00
Owner Supply 6,750.00 - 47,927.19
Owner Supply 10,000.00 - 139,110.37
83,272.80 24,981.84 66,951.33 20,085.40
35,000.00 15,000.00 313,019.15 134,151.07
30,000.00 15,000.00 268,302.13 134,151.07
perimeter 7.92
total per 8.00 40 1 course
402.18 10 course
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
2 CS Shell Tanks
Shell 1 : Plate 6 mm thk. x 6' x 20'
Shell 2 : Plate 6 mm thk. x 6' x 20'
Shell 3 : Plate 6 mm thk. x 6' x 20'
Shell 4 : Plate 6 mm thk. x 6' x 20'
Shell 5 : Plate 6 mm thk. x 6' x 20'
Shell 6 : Plate 6 mm thk. x 6' x 20'
Shell 7 : Plate 6 mm thk. x 6' x 20'
Shell 8 : Plate 6 mm thk. x 6' x 20'
Shell 9 : Plate 6 mm thk. x 6' x 20'
3 Roof Plate
CS Plate 6 mm x 6' x 20'
4 Roof Frame
230 x 90 x 8.5 x 33.1 kg/m MS 'C' Channel
100 x 50 x 5 x 9.36 kg/m MS 'C' Channel
75 x 75 x 6mm thick MS Angle
22mm diameter x 40mm long MS bolt & nut
15mm diameter x 30mm long MS bolt & nut
9mm thick CS plate
6mm thick CS plate
4.5mm thick CS plate
Sandblasting and Painting to (Structural Frame only)
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 CS Rod
CS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
CS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
CS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ CS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
CS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" CS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
SS U-Bolt & 2 nuts 5/8"
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 2,227.87
kg 132.15
kg 85.86
kg 182.68
kg 85.86
kg 1.77
kg 1,750.14
kg 1,750.14
kg 1,750.14
kg 1,750.14
kg 1,750.14
kg 1,750.14
kg 1,750.14
kg 1,750.14
kg 1,750.14
kg 2,383.97
kg 1,284.28
kg 280.80
kg 165.80
kg 32.48
kg 7.32
kg 116.58
kg 49.46
kg 52.99
m2 45.76
ORAGE; With Spray Paint method m2 45.76
lot 1
and Chemical by Contractor) lot 1
lot 1
lot 1
lot 1
shell vertical 10%
lot 1
lot 1
Unit 1.00
m' 15.00
set 4.00
kg 7.12
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 82.49
Kg 292.67
Lot 1.00
Lot 1
Lot 1
Lot 1
Unit 1
pe vent pipe Set 1
nit c/w 6 unit 12mm dia screw bolt to both end Set 1
Set 1
Set 1
m 24.79
ntal member m 46.37
nos 19.43
kg 7.10
m2 13.91
welded to Roof m 0.80
etal blast cleaning) to handrail m2 8.94
ORAGE; With Spray Paint method to handrail m2 8.94
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
72,273,263.25 181,131,612.75
7,258,265.35 1,805,569.29
150,000.00 50,000.00 150,000.00 50,000.00
448,353.00 108,472.50 6,725,295.00 1,627,087.50
67,000.00 20,100.00 268,000.00 80,400.00
16,140.20 6,750.00 114,970.35 48,081.79
1,724,908.00 425,910.00
1,366,681.00 436,710.00
806,529.50 257,145.00
53,287,660.00 17,641,013.50
4,720,500.00 1,799,600.00
10,000,000.00 3,000,000.00
10,000,000.00 3,000,000.00 10,000,000.00 3,000,000.00
58,500,000.00 20,100,000.00
102,998,982.85 49,354,370.10
5,829,405.70 2,029,765.02
- -
87,250.80 26,175.24 4,045,830.42 1,213,749.12
58,430.40 17,529.12 1,135,302.67 340,590.80
Owner Supply 6,750.00 - 47,927.19
Owner Supply 10,000.00 - 139,110.37
83,272.80 24,981.84 66,951.33 20,085.40
35,000.00 15,000.00 313,019.15 134,151.07
30,000.00 15,000.00 268,302.13 134,151.07
38.80 31.816
30.00 12
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
2 SS Shell Tanks
Shell 1 : Plate 5 mm thk. x 6' x 20'
Shell 2 : Plate 5 mm thk. x 6' x 20'
Shell 3 : Plate 5 mm thk. x 6' x 20'
Shell 4 : Plate 5 mm thk. x 6' x 20'
Shell 5 : Plate 5 mm thk. x 6' x 20'
Shell 6 : Plate 5 mm thk. x 6' x 20'
Shell 7 : Plate 5 mm thk. x 6' x 20'
Shell 8 : Plate 5 mm thk. x 6' x 20'
Shell 9 : Plate 5 mm thk. x 6' x 20'
3 Roof Plate
SS Plate 5 mm x 6' x 20'
4 Roof Frame
230 x 90 x 8.5mm SS 'C' Channel
100 x 50 x 5mm SS 'C' Channel
75 x 75 x 6mm thick SS Angle
22mm diameter x 40mm long SS bolt and nut
15mm diameter x 30mm long SS bolt and nut
9mm thick SS plate
6mm thick SS plate
4.5mm thick SS plate
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 SS Rod
SS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
SS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
SS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ SS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
SS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" SS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
SS U-Bolt & 2 nuts 5/8"
X Insulation Works
A. Insulation, Rockwool Wired Blanket # 120 kg/m3, incl. Accessories
B Steel Support to side of tank as insulation support incl. Accessories as per drawing.
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
205,TK301-305)) Nos 1
e Roof Tanks,
kg 1,892.04
kg 134.68
kg 85.86
kg 182.68
kg 85.86
kg 1.80
kg 1,605.23
kg 1,605.23
kg 1,605.23
kg 1,605.23
kg 1,605.23
kg 1,605.23
kg 1,605.23
kg 1,605.23
kg 1,605.23
kg 2,452.08
kg 1,284.28
kg 280.80
kg 165.80
kg 32.48
kg 7.32
kg 116.58
kg 49.46
kg 52.99
lot 1
and Chemical by Contractor) lot 1
lot 1
lot 1
lot 1
shell vertical 10%
lot 1
lot 1
m2 110.19
Unit 1.00
m' 14.00
set 4.00
kg 7.12
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 82.49
Kg 292.67
Lot 1.00
Lot 1
Lot 1
Lot 1
Unit 1
pe vent pipe Set 1
nit c/w 6 unit 12mm dia screw bolt to both end Set 1
Set 1
of accessories Set 1
Set 1
m 24.79
ntal member m 46.37
nos 19.43
kg 7.10
m2 13.91
welded to Roof m 0.80
etal blast cleaning) to handrail m2 8.94
ORAGE; With Spray Paint method to handrail m2 8.94
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
261,998,748.61 294,353,050.18
1,674,787.38 4,471,520.35
150,000.00 50,000.00 150,000.00 50,000.00
Owner Supply 303,720.00 - 4,252,080.00
167,500.00 20,100.00 670,000.00 80,400.00
120,000.00 12,500.00 854,787.38 89,040.35
220,000.00 1,130,400.00
1,273,000.00 1,141,200.00
841,200.00 647,640.00
59,037,660.00 17,641,013.50
12,500,000.00 2,344,000.00
10,000,000.00 3,000,000.00
10,000,000.00 3,000,000.00 10,000,000.00 3,000,000.00
83,000,000.00 26,600,000.00
124,709,780.56 52,557,717.02
350,000.00 150,000.00 117,047,845.15 50,163,362.21
21,600.00 6,750.00 7,661,935.41 2,394,354.82
5,812,094.84 1,985,711.76
87,250.80 26,175.24 2,162,947.33 648,884.20
58,430.40 17,529.12 2,709,424.89 812,827.47
15,000.00 2,500.00 291,450.00 48,575.00
Owner Supply 6,750.00 - 47,927.19
Owner Supply 10,000.00 - 139,110.37
83,272.80 24,981.84 66,951.33 20,085.40
35,000.00 15,000.00 313,019.15 134,151.07
30,000.00 15,000.00 268,302.13 134,151.07
perimeter
total per 1 course
9 course
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
2 CS Shell Tanks
Shell 1 : Plate 6 mm thk. x 6' x 20'
Shell 2 : Plate 6 mm thk. x 6' x 20'
Shell 3 : Plate 6 mm thk. x 6' x 20'
Shell 4 : Plate 6 mm thk. x 6' x 20'
Shell 5 : Plate 6 mm thk. x 6' x 20'
Shell 6 : Plate 6 mm thk. x 6' x 20'
3 Roof Plate
CS Plate 6 mm x 6' x 20'
4 Roof Frame
230 x 90 x 8.5 x 33.1 kg/m MS 'C' Channel
100 x 50 x 5 x 9.36 kg/m MS 'C' Channel
75 x 75 x 6mm thick MS Angle
22mm diameter x 40mm long MS bolt & nut
15mm diameter x 30mm long MS bolt & nut
9mm thick CS plate
6mm thick CS plate
4.5mm thick CS plate
Sandblasting and Painting to (Structural Frame only)
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 CS Rod
CS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
CS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
CS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ CS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
CS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" CS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
U-Bolt & 2 nuts 5/8"
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 1,705.72
kg 115.63
kg 85.86
kg 182.68
kg 85.86
kg 1.77
kg 1,531.38
kg 1,531.38
kg 1,531.38
kg 1,531.38
kg 1,531.38
kg 1,531.38
kg 1,791.00
kg 899.00
kg 224.64
kg 145.07
kg 25.98
kg 5.86
kg 93.26
kg 39.57
kg 42.39
m2 33.94
ORAGE; With Spray Paint method m2 33.94
lot 1
and Chemical by Contractor) lot 1
lot 1
lot 1
lot 1
shell vertical 10%
lot 1
lot 1
Unit 1.00
m' 9.00
set 4.00
kg 7.12
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 66.40
Kg 182.06
Lot 1.00
Lot 1
Lot 1
Lot 1
Unit 1
pe vent pipe Set 1
nit c/w 6 unit 12mm dia screw bolt to both end Set 1
Set 1
Set 1
m 21.58
ntal member m 40.27
nos 16.92
kg 6.18
m2 12.08
welded to Roof m 0.70
etal blast cleaning) to handrail m2 7.77
ORAGE; With Spray Paint method to handrail m2 7.77
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
65,231,824.99 123,402,670.79
4,568,147.33 1,154,734.29
150,000.00 50,000.00 150,000.00 50,000.00
448,353.00 108,472.50 4,035,177.00 976,252.50
67,000.00 20,100.00 268,000.00 80,400.00
16,140.20 6,750.00 114,970.33 48,081.79
1,724,908.00 425,910.00
1,366,681.00 341,332.50
806,529.50 202,908.75
45,764,940.00 14,669,321.82
5,131,200.00 1,844,000.00
54,500,000.00 18,100,000.00
63,617,991.41 30,471,449.29
6,227,888.03 2,155,306.97
87,250.80 26,175.24 1,883,163.10 564,948.93
58,430.40 17,529.12 2,353,263.56 705,979.07
89,000.00 26,700.00 1,505,583.33 451,675.00
Owner Supply 6,750.00 - 41,727.66
Owner Supply 10,000.00 - 120,823.93
83,272.80 24,981.84 58,290.96 17,487.29
25,000.00 17,500.00 194,357.76 136,050.44
30,000.00 15,000.00 233,229.32 116,614.66
27.16 22.2712
24.00 9.6
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023 CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
Bill of Quantity
UNIT PRICE (IDR.) AMOUNT (IDR.)
NO. ITEM OF WORKS UNIT TOTAL
MATERIAL LABOUR MATERIAL LABOUR
MECHANICAL WORKS (SS-200 MT) (308TK505) Nos 1 142,148,404.80 Err:540
Shell, Bottom and Roof
MOC : STAINLESS STEEL 137,450,659.96 Err:540
2 SS Shell Tanks
Shell 1 : Plate 5 mm thk. x 6' x 20' kg 1,114.74 Owner Supply 12,500.00 - 13,934,267.28
Shell 2 : Plate 5 mm thk. x 6' x 20' kg 1,114.74 Owner Supply 12,500.00 - 13,934,267.28
Shell 3 : Plate 5 mm thk. x 6' x 20' kg 1,114.74 Owner Supply 12,500.00 - 13,934,267.28
Shell 4 : Plate 5 mm thk. x 6' x 20' kg 1,114.74 Owner Supply 12,500.00 - 13,934,267.28
Shell 5 : Plate 5 mm thk. x 6' x 20' kg 1,114.74 Owner Supply 12,500.00 - 13,934,267.28
Shell 6 : Plate 5 mm thk. x 6' x 20' kg 1,114.74 Owner Supply 12,500.00 - 13,934,267.28
3 Roof Plate
SS Plate 5 mm x 6' x 20' kg 1,149.41 Owner Supply 12,500.00 - 14,367,655.91
4 Roof Frame
150 x 75 x 9 SS 'C' Channel kg 838.08 120,000.00 12,500.00 100,569,600.00 10,476,000.00
75 x 75 x 6mm thick SS Angle kg 124.35 120,000.00 12,500.00 14,921,735.04 1,554,347.40
22mm diameter x 40mm long SS bolt and nut kg 19.49 120,000.00 - 2,338,560.00 -
9mm thick SS plate kg 97.50 Owner Supply 12,500.00 - 1,218,785.63
4.5mm thick SS plate kg 31.79 Owner Supply 12,500.00 - 397,430.10
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit lot 1 Err:540 Err:540 - Err:540
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor) lot 1 Err:540 Err:540 - Err:540
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 % lot 1 Err:540 Err:540 - Err:540
d. Dye Penetran for T-Joint Shell 10% lot 1 Err:540 Err:540 - Err:540
e. X-ray bottom plate & annular plate 100% lot 1 7,500,000.00 3,500,000.00 7,500,000.00 3,500,000.00
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 % lot 1 Err:540 Err:540 - Err:540
g. Callibration By Metrologi (Pemerintah) lot 1 - 10,000,000.00 - 10,000,000.00
Bill
2 CS Shell Tanks
Shell 1 : Plate 6 mm thk. x 6' x 20'
Shell 2 : Plate 6 mm thk. x 6' x 20'
Shell 3 : Plate 6 mm thk. x 6' x 20'
Shell 4 : Plate 6 mm thk. x 6' x 20'
Shell 5 : Plate 6 mm thk. x 6' x 20'
3 Roof Plate
CS Plate 6 mm x 6' x 20'
4 Roof Frame
150 x 75 x 9 x 24 kg/m MS 'C' Channel
75 x 75 x 6mm thick MS Angle
22mm diameter x 40mm long MS bolt and nut
9mm thick MS plate
4.5mm thick MS plate
Sandblasting and Painting to (Structural Frame only)
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 CS Rod
CS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
CS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
CS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ CS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
CS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" CS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
U-Bolt & 2 nuts 5/8"
XI Insulation Works
A. Insulation, Rockwool Wired Blanket # 120 kg/m3, incl. Accessories
B Steel Support to side of tank as insulation support incl. Accessories as per drawing.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 870.26
kg 82.59
kg 85.86
kg 182.68
kg 85.86
kg 1.77
kg 1,093.84
kg 1,093.84
kg 1,093.84
kg 1,093.84
kg 1,093.84
kg 913.78
kg 698.40
kg 103.62
kg 19.49
kg 97.50
kg 31.79
m2 26.62
ORAGE; With Spray Paint method m2 26.62
lot 1
and Chemical by Contractor) lot 1
lot 1
lot 1
lot 1
shell vertical 10%
lot 1
lot 1
Unit 1.00
m' 8.00
set 4.00
kg 7.12
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 47.83
Kg 129.77
Lot 1.00
Lot 1
Lot 1
Lot 1
Unit 1
pe vent pipe Set 1
nit c/w 6 unit 12mm dia screw bolt to both end Set 1
Set 1
Set 1
m 15.42
ntal member m 28.08
nos 13.00
kg 4.42
m2 8.42
welded to Roof m 0.50
etal blast cleaning) to handrail m2 5.47
ORAGE; With Spray Paint method to handrail m2 5.47
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
11,996,410.99 Err:540
- 6,750.00 - 4,714,200.00
16,140.20 6,750.00 1,672,498.81 699,456.33
80,000.00 - 1,559,040.00 -
Owner Supply 6,750.00 - 658,144.24
Owner Supply 6,750.00 - 214,612.25
35,000.00 15,000.00 931,792.25 399,339.54
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
6,500,000.00 3,500,000.00 6,500,000.00 3,500,000.00
114,970.33 Err:540
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
16,140.20 6,750.00 114,970.33 48,081.79
1,576,908.00 Err:540
788,454.00 Err:540
672,529.50 Err:540
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
- Err:540
- Err:540
Err:540 Err:540 - Err:540
- Err:540
10,715,091.91 Err:540
- Err:540
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
3,177,011.91 Err:540
87,250.80 26,175.24 1,345,116.50 403,534.95
58,430.40 17,529.12 1,640,573.71 492,172.11
Err:540 Err:540 - Err:540
Owner Supply 6,750.00 - 29,805.47
Owner Supply - - -
Err:540 Err:540 - Err:540
35,000.00 15,000.00 191,321.70 81,995.01
Err:540 Err:540 - Err:540
21.10 17.301752
11.07 4.4283402
perimeter 4.85
total per 4.93 24 1 course
121.60 5 course
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
Bill
2 SS Shell Tanks
Shell 1 : Plate 5 mm thk. x 6' x 20'
Shell 2 : Plate 5 mm thk. x 6' x 20'
Shell 3 : Plate 5 mm thk. x 6' x 20'
Shell 4 : Plate 5 mm thk. x 6' x 20'
Shell 5 : Plate 5 mm thk. x 6' x 20'
3 Roof Plate
SS Plate 5 mm x 6' x 20'
4 Roof Frame
150 x 75 x 9 SS 'C' Channel
75 x 75 x 6mm thick SS Angle
22mm diameter x 40mm long SS bolt and nut
9mm thick SS plate
4.5mm thick SS plate
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 MS Rod
SS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
SS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
SS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ SS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
SS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" SS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
SS U-Bolt & 2 nuts 5/8"
X Insulation Works
A. Insulation, Rockwool Wired Blanket # 120 kg/m3, incl. Accessories
B Steel Support to side of tank as insulation support incl. Accessories as per drawing.
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 886.89
kg 84.17
kg 85.86
kg 182.68
kg 85.86
kg 1.80
kg 928.95
kg 928.95
kg 928.95
kg 928.95
kg 928.95
kg 798.20
kg 698.40
kg 103.62
kg 19.49
kg 97.50
kg 31.79
lot 1
and Chemical by Contractor) lot 1
lot 1
lot 1
lot 1
shell vertical 10%
lot 1
lot 1
m2 38.86
Unit 1.00
m' 8.00
set 4.00
kg 7.26
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 47.83
Kg 292.67
Lot 1.00
Lot 1
Lot 1
Lot 1
Unit 1
pe vent pipe Set 1
nit c/w 6 unit 12mm dia screw bolt to both end Set 1
Set 1
Set 1
m 15.42
ntal member m 28.08
nos 12.08
kg 4.42
m2 8.42
welded to Roof m 0.50
etal blast cleaning) to handrail m2 5.47
ORAGE; With Spray Paint method to handrail m2 5.47
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
100,408,637.43 Err:540
- Err:540
Err:540 Err:540 - Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
- 12,500.00 - 90,741.76
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
- Err:540
- Err:540
Err:540 Err:540 - Err:540
- Err:540
2,676,682.37 Err:540
Err:540 Err:540 - Err:540
21,600.00 6,750.00 2,676,682.37 836,463.24
3,358,261.91 Err:540
87,250.80 26,175.24 1,345,116.50 403,534.95
58,430.40 17,529.12 1,640,573.71 492,172.11
15,000.00 2,500.00 181,250.00 30,208.33
Owner Supply 6,750.00 - 29,805.47
Owner Supply - - -
Err:540 Err:540 - Err:540
35,000.00 15,000.00 191,321.70 81,995.01
Err:540 Err:540 - Err:540
perimeter 4.85
total per 4.93 25 1 course
123.92 5 course
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
Bill
2 SS Shell Tanks
Shell 1 : Plate 5 mm thk. x 6' x 20'
Shell 2 : Plate 5 mm thk. x 6' x 20'
Shell 3 : Plate 5 mm thk. x 6' x 20'
Shell 4 : Plate 5 mm thk. x 6' x 20'
Shell 5 : Plate 5 mm thk. x 6' x 20'
3 Roof Plate
SS Plate 5 mm x 6' x 20'
4 Roof Frame
150 x 75 x 9 SS 'C' Channel
75 x 75 x 6mm thick SS Angle
22mm diameter x 40mm long SS bolt and nut
9mm thick SS plate
4.5mm thick SS plate
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 MS Rod
SS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
SS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
SS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ SS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
SS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" SS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
SS U-Bolt & 2 nuts 5/8"
X Insulation Works
A. Insulation, Rockwool Wired Blanket # 120 kg/m3, incl. Accessories
B Steel Support to side of tank as insulation support incl. Accessories as per drawing.
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 886.89
kg 84.17
kg 85.86
kg 182.68
kg 85.86
kg 1.80
kg 928.95
kg 928.95
kg 928.95
kg 928.95
kg 928.95
kg 798.20
kg 698.40
kg 103.62
kg 19.49
kg 97.50
kg 31.79
lot 1.00
and Chemical by Contractor) lot 1.00
lot 1.00
lot 1.00
lot 1.00
shell vertical 10%
lot 1.00
lot 1.00
m2 38.86
Unit 1.00
m' 8.00
set 4.00
kg 7.26
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 47.83
Kg 292.67
Lot 1.00
Lot 1.00
Lot 1.00
Lot 1.00
Unit 1.00
pe vent pipe Set 1.00
nit c/w 6 unit 12mm dia screw bolt to both end Set 1.00
Set 1.00
of accessories Set 1.00
Set 1.00
m 15.42
ntal member m 28.08
nos 12.08
kg 4.42
m2 8.42
welded to Roof m 0.50
etal blast cleaning) to handrail m2 5.47
ORAGE; With Spray Paint method to handrail m2 5.47
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
Err:540 Err:540
Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
- 12,500.00 - 90,741.76
Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540
Owner Supply - - -
Err:540 12,500.00 Err:540 3,658,350.00
Err:540 - Err:540 -
#REF! #REF!
Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540
Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
21,600.00 6,750.00 2,676,682.37 836,463.24
Err:540 Err:540
87,250.80 26,175.24 1,345,116.50 403,534.95
58,430.40 17,529.12 1,640,573.71 492,172.11
15,000.00 2,500.00 181,250.00 30,208.33
Owner Supply 6,750.00 - 29,805.47
Owner Supply Err:540 - Err:540
Err:540 Err:540 Err:540 Err:540
35,000.00 15,000.00 191,321.70 81,995.01
Err:540 Err:540 - Err:540
perimeter 4.85
total per 4.93 25 1 course
123.92 5 course
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
Bill
2 SS Shell Tanks
Shell 1 : Plate 5 mm thk. x 6' x 20'
Shell 2 : Plate 5 mm thk. x 6' x 20'
Shell 3 : Plate 5 mm thk. x 6' x 20'
Shell 4 : Plate 5 mm thk. x 6' x 20'
3 Roof Plate
SS Plate 5 mm x 6' x 20'
4 Roof Frame
150 x 75 x 9 SS 'C' Channel
75 x 75 x 6mm thick SS Angle
22mm diameter x 40mm long SS bolt and nut
9mm thick SS plate
4.5mm thick SS plate
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 MS Rod
SS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
SS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
SS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ SS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
SS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" SS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
SS U-Bolt & 2 nuts 5/8"
X Insulation Works
A. Insulation, Rockwool Wired Blanket # 120 kg/m3, incl. Accessories
B Steel Support to side of tank as insulation support incl. Accessories as per drawing.
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 473.01
kg 67.34
kg 85.86
kg 182.68
kg 85.86
kg 1.80
kg 743.16
kg 743.16
kg 743.16
kg 743.16
kg 510.85
kg 558.72
kg 82.90
kg 19.49
kg 97.50
kg 31.79
lot 1.00
and Chemical by Contractor) lot 1.00
lot 1.00
lot 1.00
lot 1.00
shell vertical 10%
lot 1.00
lot 1.00
m2 26.06
Unit 1.00
m' 6.00
set 4.00
kg 7.26
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 47.83
Kg 292.67
Lot 1.00
Lot 1.00
Lot 1.00
Lot 1.00
Unit 1.00
pe vent pipe Set 1.00
nit c/w 6 unit 12mm dia screw bolt to both end Set 1.00
Set 1.00
Set 1.00
m 15.42
ntal member m 28.08
nos 12.08
kg 4.42
m2 8.42
welded to Roof m 0.50
etal blast cleaning) to handrail m2 5.47
ORAGE; With Spray Paint method to handrail m2 5.47
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
19,500,000.00 Err:540
- Err:540
Err:540 Err:540 - Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
- Err:540
Owner Supply - - -
Err:540 Err:540 - Err:540
Err:540 Err:540 - Err:540
- Err:540
- Err:540
1,720,026.32 Err:540
Err:540 Err:540 - Err:540
21,600.00 6,750.00 1,720,026.32 537,508.22
3,358,261.91 Err:540
87,250.80 26,175.24 1,345,116.50 403,534.95
58,430.40 17,529.12 1,640,573.71 492,172.11
15,000.00 2,500.00 181,250.00 30,208.33
Owner Supply 6,750.00 - 29,805.47
Owner Supply - - -
Err:540 Err:540 - Err:540
35,000.00 15,000.00 191,321.70 81,995.01
Err:540 Err:540 - Err:540
perimeter 3.88
total per 3.96 20 1 course
79.63 4 course
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023
Bill
2 SS Shell Tanks
Shell 1 : Plate 5 mm thk. x 6' x 20'
Shell 2 : Plate 5 mm thk. x 6' x 20'
Shell 3 : Plate 5 mm thk. x 6' x 20'
Shell 4 : Plate 5 mm thk. x 6' x 20'
3 Roof Plate
SS Plate 5 mm x 6' x 20'
4 Roof Frame
150 x 75 x 9 SS 'C' Channel
75 x 75 x 6mm thick SS Angle
22mm diameter x 40mm long SS bolt and nut
9mm thick SS plate
4.5mm thick SS plate
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor)
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 %
d. Dye Penetran for T-Joint Shell 10%
e. X-ray bottom plate & annular plate 100%
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 %
g. Callibration By Metrologi (Pemerintah)
II Sounding Pipe
Standard Cap Screw, Incl. Ø9 MS Rod
SS Pipe Seamless dia. 4" sch. 40
U-Bolt & 2 nuts dia. 5/8"
SS Angle L 75.75.6
IV Outlet Pipe
Outlet Pipe dia. 6"
SS Pipe Sch. 40 dia. 6"
Elbow dia. 6" LR 90⁰ SS Sch. 40
U-Bolt & 2 nuts dia. 7/8"
V Sump Drain
Sump Drain Pipe dia. 4"
SS Seamless Pipe dia. 4" sch. 40
Elbow LR 90 dia. 4" SS Seamless Sch. 40
U-Bolt & 2 nuts dia. 5/8"
VI Heating Coil
1 Heating Coil SS 304 Pipe dia. 2" Sch. 40
SS304 Pipe Ø2" SCH 40 Seamless
L 65x65x6
SS U-Bolt & 2 nuts 5/8"
X Insulation Works
A. Insulation, Rockwool Wired Blanket # 120 kg/m3, incl. Accessories
B Steel Support to side of tank as insulation support incl. Accessories as per drawing.
XI RAILING TANK
M.S Pipe Hand Rail Ø 40mm Diameter - as Baluster
M.S Pipe Hand Rail Ø 25mm Diameter - as Horizontal member
CS Accessories (12 Ø Bolt & nuts)
CS Kicker Plate 25mm x4.5mm
BRC Mesh B8
M.S Pipe Ø 30mm Diameter - as Hand Rail holder welded to Roof
Sandblasting to SA 2½ (SSPC SP 10 near white metal blast cleaning) to handrail
Primer 100 Micron Thickness : TANK GUARD STORAGE; With Spray Paint method to handrail
ORK FOR ANIMAL FEED #2
S FAB. & ERECTION
K GAUNG, DUMAI, RIAU - INDONESIA
OLEO (SDO)
L UNIT SDN. BHD.
Bill of Quantity
Nos 1
e Roof Tanks,
kg 473.01
kg 67.34
kg 85.86
kg 182.68
kg 85.86
kg 1.80
kg 743.16
kg 743.16
kg 743.16
kg 743.16
kg 510.85
kg 558.72
kg 82.90
kg 19.49
kg 97.50
kg 31.79
lot 1
and Chemical by Contractor) lot 1
lot 1
lot 1
lot 1
shell vertical 10%
lot 1
lot 1
m2 26.06
Unit 1.00
m' 6.00
set 4.00
kg 7.26
m' 1.00
Pcs 1.00
Unit 4.00
m' 1.00
Pcs 1.00
Unit 2.00
m' 47.83
Kg 292.67
Lot 1.00
Lot 1
Lot 1
Lot 1
Unit 1
pe vent pipe Set 1
nit c/w 6 unit 12mm dia screw bolt to both end Set 1
Set 1
of accessories Set 1
Set 1
m 15.42
ntal member m 28.08
nos 12.08
kg 4.42
m2 8.42
welded to Roof m 0.50
etal blast cleaning) to handrail m2 5.47
ORAGE; With Spray Paint method to handrail m2 5.47
CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
Err:540 Err:540
Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
- 12,500.00 - 90,741.76
Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
#REF! #REF!
Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540
Err:540 Err:540
Err:540 Err:540 Err:540 Err:540
Err:540 Err:540 - Err:540
Err:540 Err:540
87,250.80 26,175.24 1,345,116.50 403,534.95
58,430.40 17,529.12 1,640,573.71 492,172.11
15,000.00 2,500.00 181,250.00 30,208.33
Owner Supply 6,750.00 - 29,805.47
Owner Supply - - -
Err:540 Err:540 Err:540 Err:540
35,000.00 15,000.00 191,321.70 81,995.01
Err:540 Err:540 - Err:540
perimeter 3.88
total per 3.96 20 1 course
79.63 4 course
PROJECT : STRUCTURE WORK FOR ANIMAL FEED #2
SCOPE OF WORKS : STORAGE TANKS FAB. & ERECTION
LOCATION : JL. RAYA LUBUK GAUNG, DUMAI, RIAU - INDONESIA
OWNER : PT. SARI DUMAI OLEO (SDO)
CONSULTANT : PERUNDING YCL UNIT SDN. BHD.
YEAR : 2023 CONTRACTOR COMPANY: PT. CEMERLANG SAMUDRA KONTRINDO
Revision: XXX
Bill of Quantity
UNIT PRICE (IDR.) AMOUNT (IDR.)
NO. ITEM OF WORKS UNIT TOTAL
MATERIAL LABOUR MATERIAL LABOUR
MECHANICAL WORKS (SS-50 MT) (308TK108) Nos 1 Err:540 Err:540
Shell, Bottom and Roof
I MOC : STAINLESS STEEL Err:540 Err:540
2 SS Shell Tanks
Shell 1 : Plate 5 mm thk. x 6' x 20' kg 743.16 Owner Supply 12,500.00 - 9,289,511.52
Shell 2 : Plate 5 mm thk. x 6' x 20' kg 743.16 Owner Supply 12,500.00 - 9,289,511.52
Shell 3 : Plate 5 mm thk. x 6' x 20' kg 743.16 Owner Supply 12,500.00 - 9,289,511.52
Shell 4 : Plate 5 mm thk. x 6' x 20' kg 743.16 Owner Supply 12,500.00 - 9,289,511.52
3 Roof Plate
SS Plate 5 mm x 6' x 20' kg 510.85 Owner Supply 12,500.00 - 6,385,624.85
4 Roof Frame
150 x 75 x 9 SS 'C' Channel kg 558.72 Err:540 12,500.00 Err:540 6,984,000.00
75 x 75 x 6mm thick SS Angle kg 82.90 Err:540 12,500.00 Err:540 1,036,231.60
22mm diameter x 40mm long SS bolt and nut kg 19.49 Err:540 2,500.00 Err:540 48,720.00
9mm thick SS plate kg 97.50 Owner Supply 12,500.00 - 1,218,785.63
4.5mm thick SS plate kg 31.79 Owner Supply 12,500.00 - 397,430.10
5 Test Works
a. Vaccum Test for joints of bottom plate 100 % and sump pit lot 1 Err:540 Err:540 Err:540 Err:540
b. Hydro Test for Plat Shell (Pump, Genset, Water and Chemical by Contractor) lot 1 Err:540 Err:540 Err:540 Err:540
c. Dye Penetran for Nozzle, Ventilasi dan Manhole 100 % lot 1 Err:540 Err:540 Err:540 Err:540
d. Dye Penetran for T-Joint Shell 10% lot 1 Err:540 Err:540 Err:540 Err:540
e. X-ray bottom plate & annular plate 100% lot 1 5,000,000.00 3,000,000.00 5,000,000.00 3,000,000.00
(if can't UT test), x-ray shell horizontal 10%, x-ray shell vertical 10%
f. Vaccum Test for Roof plate 10 % lot 1 Err:540 Err:540 Err:540 Err:540
g. Callibration By Metrologi (Pemerintah) lot 1 - 10,000,000.00 - 10,000,000.00
- EXTERNAL Coating, Wire Brush Cleaning m2 274.05 10,000.00 10,000.00 2,740,471.57 2,740,471.57
Primer 100 Micron Thickness : Jotamastic 80; ex. Jotun m2 274.05 Err:540 Err:540 Err:540 Err:540
Intermediate 100 micron thickness : Jotamastic 80; ex. Jotun m2 274.05 Err:540 Err:540 Err:540 Err:540
Finish 100 micron thickmess : Hardtop XP; ex. Jotun m2 274.05 Err:540 Err:540 Err:540 Err:540
II CAT WALK Err:540 Err:540
152 x 76 x 17.88 kg/m 'C' Channel kg 1,834.49 - 7,000.00 - 12,841,416.00
Webforge' galvanised grating m2 46.79 2,000,000.00 500,000.00 93,571,200.00 23,392,800.00
Connection support kg 282.19 16,140.20 7,000.00 4,554,620.59 1,975,337.28
Black Pipe Dia. 1,5" m' 102.60 Err:540 Err:540 Err:540 Err:540
- EXTERNAL Coating, Wire Brush Cleaning m2 21.17 10,000.00 10,000.00 211,667.90 211,667.90
Primer 100 Micron Thickness : Jotamastic 80; ex. Jotun m2 21.17 Err:540 Err:540 Err:540 Err:540
Intermediate 100 micron thickness : Jotamastic 80; ex. Jotun m2 21.17 Err:540 Err:540 Err:540 Err:540
Finish 100 micron thickmess : Hardtop XP; ex. Jotun m2 21.17 Err:540 Err:540 Err:540 Err:540