Professional Documents
Culture Documents
Métodos Cuantitativos de Pronã Sticos 604B
Métodos Cuantitativos de Pronã Sticos 604B
Num pds 3 To change the number of periods use the scrollbar, do not change the cell itself
Decimales 0
Data Forecasts and Error Analysis
Mes ventas cobertizos Forecast Error Absolute Squared Abs Pct Err
Enero 10
Febrero 12
Marzo 13
Abril 16 12 11.6666667 4.33333333 4.33333333 18.7777778 27.08%
Mayo 19 14 13.6666667 5.33333333 5.33333333 28.4444444 28.07%
Junio 23 16 16 7 7 49 30.43%
Julio 26 19 19.3333333 6.66666667 6.66666667 44.4444444 25.64%
Agosto 30 23 22.6666667 7.33333333 7.33333333 53.7777778 24.44%
Septiembre 28 26 26.3333333 1.66666667 1.66666667 2.77777778 05.95%
Octubre 18 28 28 -10 10 100 55.56%
Noviembre 16 25 25.3333333 -9.33333333 9.33333333 87.1111111 58.33%
Diciembre 14 21 20.6666667 -6.66666667 6.66666667 44.4444444 47.62%
Enero 16 Total 6.33333333 58.3333333 428.777778 303.13%
Average 0.7037037 6.48148148 47.6419753 0.33681564
Bias MAD MSE MAPE
SE 7.82649144
Next period 16
Tracking Signal
Abs Pct Err Cum Error Cum Abs ErrMad Track Signal (Cum Error/MAD)
33.68%
Forecasting
35
30
25
20
Value
15
10
0
1 2 3 4 5 6 7 8 9 10 11 12
Time
6
Value
0
1 2 3 4 5 6 7 8 9 10 11 12
Time
Demand Forecast
um Error/MAD)
Forecasting Exponential smoothing
Enter alpha (between 0 and 1), enter the past demands in the shaded column then enter a
starting forecast. If the starting forecast is not in the first period then delete the error analysis
for all rows above the starting forecast.
Alpha
Data Forecasts and Error Analysis
Period Demand Forecast Error Absolute Squared Abs Pct Err
Period 1 0 0 0 0 #DIV/0!
Period 2 0 0 0 0 #DIV/0!
Period 3 0 0 0 0 #DIV/0!
Period 4 0 0 0 0 #DIV/0!
Period 5 0 0 0 0 #DIV/0!
Period 6 0 0 0 0 #DIV/0!
Period 7 0 0 0 0 #DIV/0!
Period 8 0 0 0 0 #DIV/0!
Period 9 0 0 0 0 #DIV/0!
Total 0 0 0 #DIV/0!
Average 0 0 0 #DIV/0!
Bias MAD MSE MAPE
SE 0
Next period 0
Tracking Signal
Abs Pct Err Cum Error Cum Abs Err Mad Track Signal (Cum Error/MAD)
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
Forecasting
1
0.9
0.8
0.7
0.6
0.5
Value
0.4
0.3
0.2
0.1
0
1 2 3 4 5 6 7 8 9
Time
Demand Forecast
Forecasting Exponential smoothing
Enter alpha (between 0 and 1), enter the past demands in the shaded column then enter a
starting forecast. If the starting forecast is not in the first period then delete the error analysis
for all rows above the starting forecast.
Alpha
Data Forecasts and Error Analysis
Period Demand Forecast Error Absolute Squared Abs Pct Err
Period 1 0 0 0 0 #DIV/0!
Period 2 0 0 0 0 #DIV/0!
Period 3 0 0 0 0 #DIV/0!
Period 4 0 0 0 0 #DIV/0!
Period 5 0 0 0 0 #DIV/0!
Period 6 0 0 0 0 #DIV/0!
Period 7 0 0 0 0 #DIV/0!
Period 8 0 0 0 0 #DIV/0!
Period 9 0 0 0 0 #DIV/0!
Total 0 0 0 #DIV/0!
Average 0 0 0 #DIV/0!
Bias MAD MSE MAPE
SE 0
Next period 0
Tracking Signal
Abs Pct Err Cum Error Cum Abs Err Mad Track Signal (Cum Error/MAD)
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
Forecasting
1
0.9
0.8
0.7
0.6
0.5
Value
0.4
0.3
0.2
0.1
0
1 2 3 4 5 6 7 8 9
Time
Demand Forecast
Forecasting Trend Projection
Alpha
Beta
Data Forecasts and Error Analysis
Forecast
Smoothed Smoothed Including
Period Demand Forecast, Ft Trend, Tt Trend, FITt Error Absolute
Period 1 0 0 0 0
Period 2 0 0 0 0 0
Period 3 0 0 0
Period 4 0 0 0
Period 5 0 0 0
Period 6 0 0 0
Period 7 0 0 0
Period 8 0 0 0
Period 9 0 0 0
Period 10 0 0 0
Total 0 0
Average 0 0
Bias MAD
SE
Tracking Signal
Track Signal
(Cum
Squared Abs Pct Err Cum error Cum Abs Err Mad error/MAD)
0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0! 0 0 0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
MSE MAPE
0
Forecasting Trend projection
If this is trend analysis then simply enter the past demands in the
demand column. If this is causal regression then enter the y,x pairs
with y first and enter a new value of x at the bottom in order to
forecast y.
Column
Tracking Signal
Abs Pct Err Cum error Cum Abs Err Mad Track Signal (Cum error/MAD)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE!
#VALUE!
MAPE
Regression
2
0
8
6
4
2
0
0 1 2 3 4 5 6 7 8