The maps depict the evolution of an office building from
now to the future. MAP As is observed, the building will undergo significant OF A changes, such as enlarging one side. In addition, the room arrangement has been altered, and new amenities have been introduced. BUIL The grass on the right side of the building will be grafted into the structure and transformed to become a meeting space DING with chairs, according to the proposal. There are also more restrooms and coffee machines in this section. The lawn on the building's left side will be converted into an outdoor seating area with a large number of seats. Inside the structure, major alterations are in the works; currently, people enter through the main door on the right side of the facade. However, in the future, the main entry door will be relocated to the middle of the building, and four little offices will be reconstructed into two huge offices on either side of the main entrance. Furthermore, the kitchen and dining area will be replaced with two offices while the warehouse remains unchanged.